The 1111 Foster Avenue Condominium
1041 CONEY ISLAND AVENUE · Flatbush (West)-Ditmas Park-Parkville · BIN 3382135
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Roof15p · 1 filing · 20 docs
Floor 615p · 1 filing · 20 docs
Floor 515p · 1 filing · 20 docs
Floor 417p · 1 filing · 20 docs
Floor 313p · 1 filing · 20 docs
Floor 223p · 3 filings · 20 docs
Floor 179p · 10 filings · 20 docs
Cellar21p · 2 filings · 20 docs
Site & exterior32p · 7 filings · 20 docs
Filed — no permit issued13p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ASTRO CAPITAL GROUP10807/08/2026
FOSTER CONEY REALTY1103/21/2026
UNIVERSAL CONSTRUCTION1004/21/2026
FOSTER/CONEY LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
LEVIN ENGINEERING PLLC1603/21/2026
AE DESIGN SOLUTION603/21/2026
H DESIGN STUDIO INC203/21/2026
Mdl consulting services103/21/2026
SHEIKH EXPEDITING603/21/2026
JENNY FLORES EXPEDITING503/21/2026
LOUIS STRIAR403/21/2026
PDG BUILDING CONSULTANTS LLC LLC803/21/2026
YOUN DESIGN CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN D ENTERPRISESGeneral Contractor907/08/2026
K & R CONSTRUCTION CORPGeneral Contractor807/08/2026
ZCREW CONSTRUCTION CORPGeneral Contractor603/21/2026
SAFETY FIRE SPRINKLER CORPFire Protection507/08/2026
TOWNHOUSE BUILDERS INCGeneral Contractor507/08/2026
INFINITI ESC PLUMBING CORPlumbing406/28/2026
CREATIVE PLUMBING INPlumbing307/08/2026
UNIVERSAL CONSTRUCTION INGeneral Contractor204/09/2026
CITY SIGNSScaffold107/08/2026
YOUNG CHOEElectrical103/21/2026
CITY SIGNS INCGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
WAQAS JAVEDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUMTAZ ENTERPRISES9459210/14/2025
BANGASH ASSOCIATES INC8488101/29/2025
OUTSOURCE SPECIAL INSPECT2827906/26/2024
ALLEN SHINFELD, P.E. PLLC1305105/18/2024
NORMAN C. LOK818102/06/2024
CITY-WIDE TESTING INC416307/14/2023
LEVIN ENGINEERING PLLC1267512/05/2022
PSI AGENCY INC.254104/22/2020
Building Lifecycle
All (218)Filed (37)Permit Issued (29)Signed Off (19)Violation (35)Inspection (22)Objection (46)Special Inspection (30)
04/13/2026
Filed — Alteration
APPLICATION FILE TO INSTALL COOKING EQUIPMENTS, 3 COMPARTMENT SINK, HAND SINK. INSTALL BATHROOM AND ELECTRIC HWH AT 1ST FLOOR. CONSTRUCTION WORK UNDER SEPARATE APPLICATION#B01171382-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01171382-P1
12/31/2025
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, closed)
C
12/08/2025
Signed off — Alteration
APPLICATION FILE TO INSTALL KITHEN HOOD & MECHANICAL EXHAUST SYSTEM AT 1st FLOOR PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01199429-I1
11/28/2025
Permit issued — Mechanical Systems
B01199429-I1-MS
10/15/2025
Special inspection requirement — Final
Mumtaz Hussain
10/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Mumtaz Hussain
10/15/2025
Special inspection requirement — Mechanical Systems
Mumtaz Hussain
10/14/2025
Filed — Alteration
APPLICATION FILE TO INSTALL KITHEN HOOD & MECHANICAL EXHAUST SYSTEM AT 1st FLOOR PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01199429-P1
10/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/14/2025
Special inspection requirement — Final
Mumtaz Hussain
10/14/2025
Special inspection requirement — Mechanical Systems
Mumtaz Hussain
07/31/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2025
Filed — Alteration
B01227679-I1
05/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2025
Filed — Alteration
APPLICATION FILE TO INSTALL KITHEN HOOD & MECHANICAL EXHAUST SYSTEM AT 1st FLOOR PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01199429-I1
03/13/2025
Permit issued — Plumbing
B01171382-S1-PL
03/10/2025
Filed — Alteration
APPLICATION FILE TO INSTALL COOKING EQUIPMENTS, 3 COMPARTMENT SINK, HAND SINK. INSTALL BATHROOM AND ELECTRIC HWH AT 1ST FLOOR. CONSTRUCTION WORK UNDER SEPARATE APPLICATION#B01171382-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01171382-S1
02/06/2025
Permit issued — General Construction
B01171382-I1-GC
01/29/2025
Filed — Alteration
APPLICATION FILE TO INSTALL COOKING EQUIPMENTS, 3 COMPARTMENT SINK, HAND SINK. INSTALL BATHROOM AND ELECTRIC HWH AT 1ST FLOOR. CONSTRUCTION WORK UNDER SEPARATE APPLICATION#B01171382-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01171382-I1
01/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
01/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAZAL BANGASH
11/13/2024
Signed off — Alteration
HEREBY FILING FOR THE RENOVATION OF GROUND FLOOR COMMERCIAL SPACE. FILED IN CONJUNCTION WITH APPLICATION B00932961-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00939859-S2
11/13/2024
Signed off — Alteration
HEREBY FILING FOR THE RENOVATION OF GROUND FLOOR COMMERCIAL SPACE. FILED IN CONJUNCTION WITH APPLICATION B00932961-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00939859-S1
11/12/2024
Signed off — Alteration
HEREBY FILING FOR THE RENOVATION OF GROUND FLOOR COMMERCIAL SPACE. FILED IN CONJUNCTION WITH APPLICATION B00932961-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00939859-I1
07/01/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
07/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
07/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Final
JONAR MADRIAGA
07/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Maintenance information
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Duct leakage testing, insulation and design
JONAR MADRIAGA
07/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
07/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
07/01/2024
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
07/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
06/26/2024
Filed — Alteration
HEREBY FILING FOR THE RENOVATION OF GROUND FLOOR COMMERCIAL SPACE. FILED IN CONJUNCTION WITH APPLICATION B00932961-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00939859-P7
06/26/2024
Filed — Alteration
HEREBY FILING FOR THE RENOVATION OF GROUND FLOOR COMMERCIAL SPACE. FILED IN CONJUNCTION WITH APPLICATION B00932961-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00939859-P6
06/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/21/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
JONAR MADRIAGA
05/31/2024
Filed — Alteration
HEREBY FILING FOR THE RENOVATION OF GROUND FLOOR COMMERCIAL SPACE. FILED IN CONJUNCTION WITH APPLICATION B00932961-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00939859-P5
05/18/2024
Filed — Alteration
B01047517-I1
03/05/2024
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - VILLAGER FARMERS MARKET. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00997934-I1
02/20/2024
Signed off — Alteration
B00997935-I1
Latest 60 of 218 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offUNIVERSAL CONSTRUCTION IN11/28/2025
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR03/13/2025
DOB NOWGeneral ConstructionPermit IssuedUNIVERSAL CONSTRUCTION IN02/06/2025
DOB NOWGeneral ConstructionSigned-offCITY SIGNS INC02/15/2024
DOB NOWSignSigned-offELMER DAWSON02/14/2024
DOB NOWMechanical SystemsSigned-offZCREW CONSTRUCTION CORP11/14/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.11/09/2023
DOB NOWGeneral ConstructionSigned-offZCREW CONSTRUCTION CORP10/04/2023
DOB NOWMechanical SystemsSigned-offK R CONSTRUCTION09/07/2023
DOB NOWGeneral ConstructionSigned-offK R CONSTRUCTION09/07/2023
DOB NOWPlumbingSigned-offAB PLUMBING INC09/07/2023
DOB NOWCurb CutSigned-offK R CONSTRUCTION01/05/2023
DOB NOWGeneral ConstructionSigned-offK R CONSTRUCTION12/02/2022
DOB NOWMechanical SystemsSigned-offK R CONSTRUCTION12/02/2022
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP11/18/2022
DOB NOWPlumbingSigned-offAB PLUMBING INC11/07/2022
DOB NOWSprinklersSigned-offAB PLUMBING INC10/31/2022
DOB NOWPlumbingSigned-offSAFETY FIRE SPRINKLER CORP04/28/2022
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP04/28/2022
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES07/21/2021
DOB NOWPlumbingSigned-offSAFETY FIRE SPRINKLER CORP04/30/2021
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP04/30/2021
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES02/04/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES02/04/2021
DOB NOWConstruction FenceSigned-offTOWNHOUSE BUILDERS INC05/21/2020
DOB NOWConstruction FenceSigned-offTOWNHOUSE BUILDERS INC03/26/2020
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES01/21/2020
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES12/17/2019
DOB NOWConstruction FenceSigned-offTOWNHOUSE BUILDERS INC11/14/2019
BISPLISSUEDCREATIVE PLUMBING IN06/16/2022
BIS—ISSUEDTOWNHOUSE BUILDERS INC03/24/2022
BIS—ISSUEDTOWNHOUSE BUILDERS INC10/18/2021
BISPLISSUEDL&J PLG & HTG CO OF NY IN07/15/2021
BISEQISSUEDTOWNHOUSE BUILDERS INC07/09/2021
BIS—ISSUEDTOWNHOUSE BUILDERS INC07/08/2021
BISPLISSUEDL&J PLG & HTG CO OF NY IN07/17/2020
BISEQISSUEDTOWNHOUSE BUILDERS INC07/07/2020
BIS—ISSUEDTOWNHOUSE BUILDERS INC07/06/2020
BIS—RE-ISSUEDTOWNHOUSE BUILDERS INC06/30/2020
BIS—ISSUEDTOWNHOUSE BUILDERS INC02/19/2020
+ 8 more permits on file
1 project · most recent 07/14/2023
Sprinkler System
FiledStatusContractorScope
07/14/2023——Sprinkler System
2 projects · most recent 04/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/13/2026Permit IssuedINFINITI ESC PLUMBING CORGas, Water/Sanitary
07/14/2023——Water/Sanitary
10 projects · most recent 03/06/2025
General Wiring Lighting
FiledStatusContractorScope
03/06/2025Permit IssuedBLU ELECTRICAL SVS INCGeneral Wiring
03/07/2024CompleteY.S ELECTRICGeneral Wiring, Lighting
02/22/2024Permit IssuedY.S ELECTRIC—
09/27/2023CompleteACCURATE ELEC'L CORP.General Wiring
01/12/2023CompleteGREEN STAR ELECTL CONT INGeneral Wiring
10/23/2022CompleteACCURATE ELEC'L CORP.General Wiring
02/09/2021CompleteSTAR ELEC'L CONTRACTORS C—
01/22/2020CompleteGREEN STAR ELECTL CONT IN1 meters, 1 new_meters
12/06/2019CompleteV. VASS ELECTRIC CORP—
12/05/2019CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
07/31/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/30/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/03/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
01/11/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
12/12/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 125
DateRequirementInspectorRole
10/15/2025Tenant Protection Plan ComplianceMumtaz Hussainspecial
10/15/2025FinalMumtaz Hussainprogress
10/15/2025Mechanical SystemsMumtaz Hussainspecial
10/14/2025FinalMumtaz Hussainprogress
10/14/2025Tenant Protection Plan Compliance—special
10/14/2025Mechanical SystemsMumtaz Hussainspecial
01/29/2025Tenant Protection Plan ComplianceFAZAL BANGASHspecial
01/24/2025Fire-Resistance Rated ConstructionFAZAL BANGASHprogress
07/01/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
07/01/2024HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
07/01/2024HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
07/01/2024HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
07/01/2024Maintenance informationJONAR MADRIAGAenergy_progress
07/01/2024Energy Code Compliance InspectionsJONAR MADRIAGAprogress
07/01/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
07/01/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
07/01/2024Exhaust and Vent Systems in Plenums and DuctsJONAR MADRIAGAspecial
07/01/2024Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
07/01/2024Post-installed AnchorsJONAR MADRIAGAspecial
07/01/2024Mechanical SystemsJONAR MADRIAGAspecial
07/01/2024FinalJONAR MADRIAGAprogress
07/01/2024HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
07/01/2024HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
07/01/2024Shutoff dampersJONAR MADRIAGAenergy_progress
07/01/2024Maintenance informationJONAR MADRIAGAenergy_progress
Latest 25 of 125.
▾Documents — 376 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch28
09/01/2026B00556312-I1Request digital key ↗
08/28/2026B00796924-I1Request digital key ↗
08/28/2026B08009362-P1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00335104-I1Request digital key ↗
09/02/2026B00335104-P5Request digital key ↗
09/02/2026B00335104-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
09/02/2026B00335104-I1Request digital key ↗
09/02/2026B00335104-P1Request digital key ↗
09/02/2026B00335104-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/02/2026B00335104-I1Request digital key ↗
09/02/2026B00335104-P1Request digital key ↗
09/02/2026B00335104-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00280829-I1Request digital key ↗
08/15/2026B00280829-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00258163-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00280850-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00132334-I1Request digital key ↗
▸Applications & Permits59
▸BISPLAN / WORK APPROVAL APPLICATION37
04/26/2023321363877Open ↗
01/13/2023321363877Open ↗
10/03/2022321950297Open ↗
Showing 3 of 37 on file for this type
▸BISWORK PERMIT APPLICATION17
07/09/2022321363877Open ↗
07/14/2021321363877Open ↗
07/17/2020321363877Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
01/03/2020321363877Open ↗
02/20/2019321831997Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
06/19/2019321923139Open ↗
02/08/2019321923139Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/30/2022321363877Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISVERIFY TAX LOT1
02/08/2023321363877Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/08/2020321363877Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/08/2023321363877Open ↗
▸BISZONING DIAGRAM1
05/15/2019321363877Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/22/2022322158277Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
07/16/2021322097850Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00932961-I1Open ↗
▸Seals & Professional Certifications136
▸DOB NOWProgress Inspector Seal & Signature59
09/26/2026B08009362-I1Open ↗
09/25/2026B01199429-I1Open ↗
09/14/2026B00939859-P6Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/02/2026B00132334-I1Open ↗
08/28/2026B08009362-I1Open ↗
08/27/2026B00901196-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/26/2026B08009362-I1Open ↗
09/25/2026B01199429-I1Open ↗
09/25/2026B01199429-I1Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
01/29/2020321363877Open ↗
01/29/2020321363877Open ↗
01/29/2020321363877Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment33
▸BISSCHEDULE B - PLUMBING10
01/13/2023321363877Open ↗
07/20/2022321363877Open ↗
07/18/2022321363877Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS8
05/01/2023321363877Open ↗
05/01/2023321363877Open ↗
05/01/2023321363877Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
05/01/2023321363877Open ↗
05/01/2023321363877Open ↗
03/08/2023321363877Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/13/2018321363877Open ↗
11/15/2016321363877Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/27/2022321363877Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
07/28/2022321363877Open ↗
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
03/10/2023321363877Open ↗
▸BISGAS CUT-OFF1
05/16/2019321435210Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
12/06/2022321950297Open ↗
▸BISWATER CUT-OFF1
05/16/2019321435210Open ↗
▸BISELECTRIC CUT-OFF1
05/16/2019321435210Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
04/05/2023321363877Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST3
06/22/2023321363877Open ↗
06/19/2019321923139Open ↗
03/04/2019321363877Open ↗
▸BISSTREET TREE SIGNOFF2
06/21/2023321363877Open ↗
08/19/2022321923139Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
05/16/2019321435210Open ↗
05/16/2019321435210Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
05/16/2019321435210Open ↗
▸BISSTREET TREES SITE PLAN1
08/19/2022321923139Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/16/2019321435210Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/04/2019321363877Open ↗
▸Environmental & Asbestos18
▸DOB NOWOER: Notice to Proceed8
08/13/2026B00335104-P5Open ↗
08/13/2026B00335104-I1Open ↗
08/13/2026B00335104-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026B01171382-P1Open ↗
08/22/2026B01171382-S1Open ↗
08/20/2026B01199429-P1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
12/09/2022321950297Open ↗
06/16/2022321363877Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
10/22/2018321831997Open ↗
12/22/2017321363877Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/16/2019321435210Open ↗
▸BISRODENT CONTROL1
05/16/2019321435210Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/29/2020321363877Open ↗
01/29/2020321363877Open ↗
11/07/2018321831997Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/16/2023321363877Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
04/27/2023321363877Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/11/2022321363877Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00796924-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
05/26/2022321363877Open ↗
05/26/2022321363877Open ↗
01/29/2020321363877Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/07/2022321363877Open ↗
09/08/2021301881355Open ↗
09/08/2021301881355Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/29/2020321363877Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
03/22/2023321363877Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
01/29/2020321363877Open ↗
▸Approvals, Objections & Sign-offs13
▸BISSCHEDULE A - OCCUPANCY / USE8
04/26/2023321363877Open ↗
08/26/2022321363877Open ↗
03/30/2022321363877Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/11/2022321950297Open ↗
09/21/2021301881355Open ↗
03/13/2019321831997Open ↗
▸BISLANDMARKS APPROVAL1
05/16/2019321435210Open ↗
▸BISCURB CUT (CC) SIGNOFF1
03/10/2023321363877Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT4
09/21/2021301881355Open ↗
05/23/2019321950297Open ↗
03/13/2019321831997Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
01/29/2020321363877Open ↗
05/16/2019321435210Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/07/2022321950297Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION11
05/12/2023321363877Open ↗
05/12/2023321363877Open ↗
05/12/2023321363877Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET9
06/21/2022322158277Open ↗
07/01/2021322097850Open ↗
05/23/2019321950297Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM2
05/19/2020321363877Open ↗
03/13/2019321831997Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/08/2019321923139Open ↗
▸Other Documents7
▸BISPLOT DIAGRAM2
08/13/2021322097850Open ↗
11/15/2016321363877Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
03/13/2019321831997Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/19/2019321363877Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00932961-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00932961-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00932961-I1Open ↗