← Back
Two stories - detached, small or mid-size
104-16 201 STREET
QUEENS · Hollis · BIN 4233105
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3AZoning
1,260 sfGross Floor Area
1Units
1 Open Violation ▸
Two stories - detached, small or mid-size · 4,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN108/06/2026
Building Lifecycle
All (27)Filed (1)Violation (1)Objection (6)Special Inspection (19)
09/01/2026
Objection resolved — Addressed
09/01/2026
Objection resolved — Resolved
08/24/2026
Objection resolved — Resolved
08/20/2026
Objection raised — Other
08/20/2026
Objection raised — Other
08/20/2026
Objection raised — Other
08/06/2026
Filed — Alteration
Filing to legalize the horizontal enlargement & interior renovation of the exist.2 stories one family dwelling unit. New drywall partitions & plumbing fixtures as per plans. File to answer ECB violation # 39189475Z. No change in use, egress or occupancy.
Q01432559-I1
07/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/17/2026
Special inspection requirement — Concrete - Cast-In-Place
07/17/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/17/2026
Special inspection requirement — Subgrade Inspections
07/17/2026
Special inspection requirement — Final
07/17/2026
Special inspection requirement — Footing and Foundation
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
07/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/17/2026
Special inspection requirement — Structural Wood Frame
07/17/2026
Special inspection requirement — Fenestration areas
07/17/2026
Special inspection requirement — Fenestration air leakage
07/17/2026
Special inspection requirement — Air barrier - visual inspection
07/17/2026
Special inspection requirement — Interior lighting power
07/17/2026
Special inspection requirement — Insulation placement and R values
07/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/17/2026
Special inspection requirement — Electric vehicle service equipment requirements
07/17/2026
Special inspection requirement — Maintenance information
07/17/2026
Special inspection requirement — Permanent certificate
07/17/2026
Special inspection requirement — Protection of exposed foundation insulation
05/21/2026
Violation issued (ECB, open)
Construction
Nothing on file for this building.
1 project · most recent 08/06/2026
Concrete Wood
FiledStatusContractorScope
08/06/2026——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
07/17/2026Structural Stability – Alterations of existing buildings—special
07/17/2026Concrete - Cast-In-Place—special
07/17/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/17/2026Subgrade Inspections—special
07/17/2026Final—progress
07/17/2026Footing and Foundation—progress
07/17/2026Energy Code Compliance Inspections—progress
07/17/2026Fire-Resistance Rated Construction—progress
07/17/2026Structural Wood Frame—progress
07/17/2026Fenestration areas—energy_progress
07/17/2026Fenestration air leakage—energy_progress
07/17/2026Air barrier - visual inspection—energy_progress
07/17/2026Interior lighting power—energy_progress
07/17/2026Insulation placement and R values—energy_progress
07/17/2026Fenestration and door U-factor and product ratings—energy_progress
07/17/2026Electric vehicle service equipment requirements—energy_progress
07/17/2026Maintenance information—energy_progress
07/17/2026Permanent certificate—energy_progress
07/17/2026Protection of exposed foundation insulation—energy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01432559-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01432559-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01432559-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01432559-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01432559-I1Open ↗
▸DOB NOWPlot Diagram1
08/16/2026Q01432559-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026Q01432559-I1Open ↗