← Back
Primarily 2 family with 1 store or office
104-16 LIBERTY AVENUE
QUEENS · South Ozone Park · BIN 4202098
💬 Discuss this project
1920Year Built
2Stories
S2Building Class
R6BZoning
2,320 sfGross Floor Area
3Units
Rent Stabilized54 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: N.S.N. LIU REALTY LLC · 1,615 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Site & exterior2p · 1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOB SERVICES404/09/2026
8203 3RD AVE PROPERTY304/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/03/2025$950K—— → —$409/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYX ENGINEERING, PLLC202/24/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
TGB CREATIVE DESIGN INCGeneral Contractor104/09/2026
A1 SPECIALIZED, INCScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYX ENGINEERING, PLLC6118112/18/2025
Building Lifecycle
All (69)Filed (2)Permit Issued (2)Violation (60)Inspection (2)Objection (2)Special Inspection (1)
05/07/2026
Violation issued (HPD, closed)
A
04/15/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/08/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
04/01/2026
Permit issued — Sign
Q01329095-S1-SG
03/18/2026
Objection resolved — Addressed
03/11/2026
Objection raised — Energy
02/24/2026
Filed — Alteration
PROPOSE TO INSTALL NEW ILLUMINATED CHANNEL LETTERS ON ALUMINUM RACEWAY FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01329095-S1
02/05/2026
Permit issued — General Construction
Q01329095-I1-GC
12/18/2025
Filed — Alteration
PROPOSE TO INSTALL NEW ILLUMINATED CHANNEL LETTERS ON ALUMINUM RACEWAY FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01329095-I1
12/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
Xiao Huang
11/21/2025
Violation issued (HPD, closed)
I
11/10/2025
Violation issued (ECB, closed)
Construction
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2022
Violation issued (HPD, closed)
I
03/04/2022
Violation issued (HPD, closed)
A
04/15/2021
Violation issued (HPD, closed)
A
10/03/2019
Violation issued (HPD, open)
B
10/03/2019
Violation issued (HPD, open)
B
10/03/2019
Violation issued (HPD, open)
B
10/03/2019
Violation issued (HPD, open)
C
10/03/2019
Violation issued (HPD, open)
A
10/03/2019
Violation issued (HPD, open)
A
10/03/2019
Violation issued (HPD, open)
A
10/03/2019
Violation issued (HPD, open)
A
10/03/2019
Violation issued (HPD, open)
A
10/03/2019
Violation issued (HPD, open)
C
10/03/2019
Violation issued (HPD, open)
C
10/03/2019
Violation issued (HPD, open)
B
10/03/2019
Violation issued (HPD, open)
B
10/03/2019
Violation issued (HPD, open)
A
10/03/2019
Violation issued (HPD, open)
B
10/03/2019
Violation issued (HPD, open)
B
10/03/2019
Violation issued (HPD, open)
A
10/03/2019
Violation issued (HPD, open)
B
10/24/2018
Violation issued (HPD, closed)
I
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
A
09/19/2009
Violation issued (HPD, open)
A
09/19/2009
Violation issued (HPD, open)
C
09/19/2009
Violation issued (HPD, open)
A
09/19/2009
Violation issued (HPD, open)
A
09/19/2009
Violation issued (HPD, open)
A
09/19/2009
Violation issued (HPD, open)
A
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
B
09/19/2009
Violation issued (HPD, open)
C
09/19/2009
Violation issued (HPD, open)
B
03/18/2009
Violation issued (HPD, open)
A
03/18/2009
Violation issued (HPD, open)
A
03/18/2009
Violation issued (HPD, open)
A
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offMAD SIGNS INC04/01/2026
DOB NOWGeneral ConstructionSigned-offTGB CREATIVE DESIGN INC02/05/2026
4 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026CompleteVOLTRON ELECTRIC LLCGeneral Wiring
04/05/2026Permit IssuedVOLTRON ELECTRIC LLC—
07/15/2021Permit IssuedJOSEPH WEINSTEIN ELECTRIC1 meters
02/28/2018CompleteWILLDAN ELECTRICAL OF NY—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/15/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/08/2026Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/04/2025Tenant Protection Plan ComplianceXiao Huangspecial
▾Documents — 1 on file (BIS + DOB NOW)
▸Seals & Professional Certifications1
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01329095-I1Open ↗