← Back
Limited service hotel, often national chain
104-16 TUCKERTON STREET
QUEENS · Jamaica · BIN 4619097
💬 Discuss this project
2021Year Built
8Stories
H3Building Class
M1-2AZoning
61,467 sfGross Floor Area
96Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Limited service hotel, often national chain · Owner of record: LIBERTY TUCK NY LLC · 14,778 sf lot · 4.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Floor 11 filing
Site & exterior5 filings
Filed — no permit issued1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SANDHU BUILDERS 11407/08/2026
SUPERIOR GLEN CONSTRUCTION1003/22/2026
SANDHU BUILDER203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC1304/29/2024
ARQUITECTURA VARELA506/17/2022
LMW ENGINEERING GROUP LLC202/18/2022
TOHFAZ UDDIN PE PC110/29/2021
M.S. SAVANI ARCHITECT, PC212/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC2603/21/2026
C-SPACE DESIGN403/21/2026
M.S. SAVANI ARCHITECT,P.C.403/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SANDHU BUILDERS 1 INCGeneral Contractor2507/08/2026
BRUCHE MECHANICAL NY LLCFire Protection507/08/2026
A & H INSTALLATION INCGeneral Contractor403/21/2026
ERIC & NG ELEC'L, INC.Electrical203/22/2026
PLBG P & H INCPlumbing207/08/2026
MARTINEZ ELECTRICAL CONTElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941204/29/2024
Building Lifecycle
All (130)Filed (23)Permit Issued (20)Signed Off (10)Violation (21)Inspection (12)Objection (14)Special Inspection (30)
11/13/2024
Signed off — Alteration
HEREWITH TO PROPOSE TEMPORARY 8' HIGH WOOD CONSTRUCTION FENCE. NO CHANGES IN OCCUPANCY, USE, GROUP OR EGRESS UNDER THIS APPLICATION.
Q00441059-I1
11/13/2024
Signed off — Alteration
HEREWITH TO PROPOSE TEMPORARY 8' HIGH WOOD CONSTRUCTION FENCE. NO CHANGES IN OCCUPANCY, USE, GROUP OR EGRESS UNDER THIS APPLICATION
Q00105062-I1
11/08/2024
Signed off — Alteration
INSTALLATION OF DIESEL GENERATOR IN THE OPEN SPACE IN CONJUCTION WITH NEW BUILDING APPLICATON # 440637713. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00474132-I1
11/07/2024
Signed off — Alteration
NEW BUILDING STRUCTURAL WORK IN CONJUNCTION WITH NB #440637713 NEW 8 STORY TRANSIENT HOTEL WITH COMMUNITY FACILITY. SOE AND FOUNDATION FILED WITH NB AS SUBSEQUENT FILING DOC 02 UNDER NB#440637713.
Q00435628-I1
05/16/2024
Signed off — Alteration
INSTALLATION OF HEATING, COOLING AND VENTILATION SYSTEM FOR ENTIRE BUILIDING IN CONJUNCTION WITH NEW BUILDING # 440637713. NO CHANGE IN USE, EGRESS OROCCUPANCY.
Q00432371-I1
05/09/2024
Signed off — Alteration
Q00458004-I1
05/09/2024
Objection resolved — Addressed
05/03/2024
Objection raised — Scope
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/29/2024
Filed — Alteration
INSTALLATION OF HEATING, COOLING AND VENTILATION SYSTEM FOR ENTIRE BUILIDING IN CONJUNCTION WITH NEW BUILDING # 440637713. NO CHANGE IN USE, EGRESS OROCCUPANCY.
Q00432371-P2
04/23/2024
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
04/23/2024
Special inspection requirement — Maintenance information
Paul Raymond
04/23/2024
Special inspection requirement — Mechanical Systems
Paul Raymond
04/23/2024
Special inspection requirement — Final
Paul Raymond
04/23/2024
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
04/23/2024
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
04/23/2024
Special inspection requirement — Shutoff dampers
Paul Raymond
11/03/2023
Signed off — Alteration
INSTALLATION OF STANDPIPE/ SPRINKLER AND PLUMBING FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #:440637713. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00431856-I1
07/29/2023
Special inspection requirement — Standpipe Systems
Paul Raymond
07/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
07/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
07/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
07/29/2023
Special inspection requirement — Maintenance information
Paul Raymond
07/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
07/29/2023
Special inspection requirement — Sprinkler Systems
Paul Raymond
07/19/2023
Filed — Alteration
INSTALLATION OF STANDPIPE/ SPRINKLER AND PLUMBING FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #:440637713. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00431856-P7
07/17/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/06/2023
Filed — Alteration
INSTALLATION OF STANDPIPE/ SPRINKLER AND PLUMBING FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #:440637713. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00431856-P5
07/05/2023
Special inspection requirement — Sprinkler Systems
Paul Raymond
07/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
07/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
07/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
07/05/2023
Special inspection requirement — Maintenance information
Paul Raymond
07/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
07/05/2023
Special inspection requirement — Standpipe Systems
Paul Raymond
06/26/2023
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
05/22/2023
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
05/17/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/16/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/27/2023
Objection resolved — Addressed
04/20/2023
Objection raised — Scope
04/17/2023
Filed — Alteration
INSTALLATION OF STANDPIPE/ SPRINKLER AND PLUMBING FOR ENTIRE BUILDING IN CONJUNCTION WITH NEW BUILDING APPLICATION #:440637713. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00431856-P3
04/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
04/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
04/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
04/07/2023
Special inspection requirement — Maintenance information
03/31/2023
Signed off — Alteration
Q00615641-I1
02/24/2023
Special inspection requirement — Sprinkler Systems
Paul Raymond
02/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
02/24/2023
Special inspection requirement — Standpipe Systems
Paul Raymond
01/25/2023
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00595569-I1
01/25/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
Q00597172-I1
12/06/2022
Permit issued — Supported Scaffold
Q00595569-I1-SF
12/06/2022
Permit issued — Standpipe
Q00431856-I1-EW-SD
12/06/2022
Permit issued — Plumbing
Q00431856-I1-EW-SP
12/06/2022
Permit issued — Plumbing
Q00431856-I1-PL
12/03/2022
Violation issued (ECB, closed)
Construction
10/14/2022
Permit issued — Mechanical Systems
Q00432371-I1-MS
09/06/2022
Permit issued — Protection and Mechanical Methods
Q00615641-I1-PM
09/02/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offSANDHU BUILDERS 1 INC12/06/2022
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC12/06/2022
DOB NOWPlumbingSigned-offBRUCHE MECHANICAL NY LLC12/06/2022
DOB NOWPlumbingSigned-offPLBG P & H INC12/06/2022
DOB NOWMechanical SystemsSigned-offSANDHU BUILDERS 1 INC10/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offA H INSTALLATION09/06/2022
DOB NOWConstruction FenceSigned-offSANDHU BUILDERS 1 INC04/15/2022
DOB NOWProtection and Mechanical MethodsSigned-offA H INSTALLATION11/01/2021
DOB NOWStructuralSigned-offSANDHU BUILDERS 1 INC09/24/2021
DOB NOWSidewalk ShedSigned-offSANDHU BUILDERS 1 INC09/22/2021
DOB NOWSupported ScaffoldSigned-offSANDHU BUILDERS 1 INC09/22/2021
DOB NOWMechanical SystemsSigned-offSANDHU BUILDERS 1 INC09/16/2021
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC06/21/2021
DOB NOWSprinklersSigned-offPLBG P & H INC06/21/2021
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC06/21/2021
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC06/17/2021
DOB NOWConstruction FenceSigned-offSANDHU BUILDERS 1 INC04/29/2021
DOB NOWConstruction FenceSigned-offSANDHU BUILDERS 1 INC12/18/2020
DOB NOWConstruction FenceSigned-offSANDHU BUILDERS 1 INC01/09/2020
DOB NOWConstruction FenceSigned-offSANDHU BUILDERS 1 INC12/06/2018
BIS—ISSUEDSANDHU BUILDERS 1 INC08/08/2022
BISEQISSUEDSANDHU BUILDERS 1 INC10/07/2021
BIS—ISSUEDSANDHU BUILDERS 1 INC08/20/2021
BIS—RE-ISSUEDSANDHU BUILDERS 1 INC08/20/2021
BIS—ISSUEDSANDHU BUILDERS 1 INC06/30/2021
BIS—ISSUEDSANDHU BUILDERS 1 INC06/29/2021
1 project · most recent 02/01/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/01/2022——Gas, Storm, Water/Sanitary
5 projects · most recent 05/13/2025
General Wiring
FiledStatusContractorScope
05/13/2025Permit IssuedMARTINEZ ELECTRICAL CONTGeneral Wiring
05/10/2023CompleteERIC & NG ELEC'L, INC.General Wiring
01/18/2022CompleteJAM ELECTRICAL CORP—
10/28/2021CompleteRICHARD NEU—
10/22/2021CompleteERIC & NG ELEC'L, INC.1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/17/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/26/2023Pass-Final SD - Up to 9 Requested FloorsPassView ↗
05/22/2023Pass-Final SD - Up to 9 Requested FloorsPassView ↗
05/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/16/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/02/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/02/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/02/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/05/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/01/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/21/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
04/23/2024HVAC insulation and sealing Paul Raymondenergy_progress
04/23/2024Maintenance informationPaul Raymondenergy_progress
04/23/2024Mechanical SystemsPaul Raymondspecial
04/23/2024FinalPaul Raymondprogress
04/23/2024HVAC and service water heating equipment Paul Raymondenergy_progress
04/23/2024HVAC and service water heating system controls Paul Raymondenergy_progress
04/23/2024Shutoff dampersPaul Raymondenergy_progress
07/29/2023Standpipe SystemsPaul Raymondspecial
07/29/2023HVAC-R and service water heating equipmentPaul Raymondenergy_progress
07/29/2023HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
07/29/2023HVAC-R and service water heating system controlsPaul Raymondenergy_progress
07/29/2023Maintenance informationPaul Raymondenergy_progress
07/29/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/29/2023Sprinkler SystemsPaul Raymondspecial
07/05/2023Sprinkler SystemsPaul Raymondspecial
07/05/2023HVAC-R and service water heating system controlsPaul Raymondenergy_progress
07/05/2023HVAC-R and service water heating equipmentPaul Raymondenergy_progress
07/05/2023HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
07/05/2023Maintenance informationPaul Raymondenergy_progress
07/05/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
07/05/2023Standpipe SystemsPaul Raymondspecial
04/07/2023HVAC-R and service water heating system controls—energy_progress
04/07/2023HVAC-R and service water piping design and insulation—energy_progress
04/07/2023HVAC-R and service water heating equipment—energy_progress
04/07/2023Maintenance information—energy_progress
Latest 25 of 58.
▾Documents — 270 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch - Plumbing8
08/27/2026Q00431856-P7Request digital key ↗
08/27/2026Q00431856-P5Request digital key ↗
08/27/2026Q00431856-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Standpipe7
08/27/2026Q00431856-P7Request digital key ↗
08/27/2026Q00431856-P2Request digital key ↗
08/27/2026Q00431856-P5Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch6
08/28/2026Q00105062-I1Request digital key ↗
08/27/2026Q00597172-P1Request digital key ↗
08/27/2026Q00597172-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
08/27/2026Q00431856-P7Request digital key ↗
08/27/2026Q00431856-P2Request digital key ↗
08/27/2026Q00431856-P5Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/27/2026Q00432371-P1Request digital key ↗
08/27/2026Q00432371-I1Request digital key ↗
08/15/2026Q00474132-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/26/2026Q00435628-I1Request digital key ↗
08/15/2026Q00435628-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00441059-I1Request digital key ↗
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION20
06/06/2025440690575Open ↗
10/20/2024421689319Open ↗
03/20/2023440637713Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION8
10/05/2022440637713Open ↗
10/08/2021440637713Open ↗
10/08/2021440637713Open ↗
Showing 3 of 8 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION4
06/01/2022440637713Open ↗
05/26/2022440637713Open ↗
03/11/2022440637713Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/30/2020440637713Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
03/09/2021421786268Open ↗
11/12/2020440637713Open ↗
▸BISZONING DIAGRAM2
04/20/2021440637713Open ↗
04/20/2021440637713Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/27/2021421786268Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/20/2021440637713Open ↗
▸BISVERIFY TAX LOT1
12/03/2024440637713Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/30/2020440637713Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/18/2023440637713Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/20/2021440637713Open ↗
▸Seals & Professional Certifications71
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/28/2026Q00105062-I1Open ↗
08/27/2026Q00432371-P1Open ↗
08/27/2026Q00432371-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026Q00431951-I1Open ↗
09/01/2026Q00431951-I1Open ↗
09/01/2026Q00431951-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026Q00431951-I1Open ↗
09/01/2026Q00431951-I1Open ↗
08/28/2026Q00474132-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/17/2020440637713Open ↗
12/17/2018421689319Open ↗
12/17/2018421689319Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/30/2021440690575Open ↗
12/18/2020440651812Open ↗
11/12/2020440637713Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
12/18/2020440651812Open ↗
11/12/2020440637713Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/30/2021440690575Open ↗
▸Trade Schedules & Equipment4
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
11/14/2024440637713Open ↗
04/20/2021440637713Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
06/12/2023440637713Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/11/2023440637713Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE SIGNOFF2
05/03/2024440651812Open ↗
02/27/2024440637713Open ↗
▸BISSTREET TREE CHECKLIST2
09/15/2021440651812Open ↗
11/12/2020440637713Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/14/2021440637713Open ↗
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
09/30/2021440690575Open ↗
06/28/2021440637713Open ↗
05/14/2021440637713Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
08/20/2021440637713Open ↗
12/17/2020440637713Open ↗
12/17/2018421689319Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/12/2024440690575Open ↗
06/12/2023440637713Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/30/2021440690575Open ↗
11/12/2020440637713Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00474132-I1Open ↗
08/13/2026Q00431856-I1Open ↗
▸BISFENESTRATION AREAS1
06/12/2023440637713Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
06/12/2023440637713Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
06/12/2023440637713Open ↗
▸BISLIGHTING IN DWELLING UNITS1
06/12/2023440637713Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/12/2023440637713Open ↗
▸BISLIGHTING CONTROLS1
06/12/2023440637713Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
06/12/2023440637713Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY7
07/11/2024440690575Open ↗
10/07/2021440690575Open ↗
09/30/2021440690575Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
08/20/2021440637713Open ↗
06/30/2021440637713Open ↗
05/21/2021440637713Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
05/17/2023440637713Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/12/2023440637713Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/12/2023440637713Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/17/2023440637713Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
06/12/2023440637713Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
05/17/2023440637713Open ↗
▸BISHYDRO FLOW TEST LETTER1
12/30/2020440637713Open ↗
▸BISSOIL REPORT1
12/30/2020440637713Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/01/2025440690575Open ↗
04/07/2023440637713Open ↗
10/08/2021440637713Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
01/12/2022440637713Open ↗
07/01/2021440637713Open ↗
12/17/2018421689319Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE3
10/05/2022440637713Open ↗
10/08/2021440637713Open ↗
08/20/2021440637713Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
11/25/2024440651812Open ↗
▸Filing & Intake Forms27
▸BISADDITIONAL INFORMATION11
04/07/2023440637713Open ↗
03/04/2022440690575Open ↗
02/01/2022440690575Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM8
10/05/2022440637713Open ↗
05/26/2022440637713Open ↗
03/11/2022440637713Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET5
05/27/2021421786268Open ↗
12/17/2020440637713Open ↗
12/17/2018421689319Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/30/2021440690575Open ↗
12/18/2020440651812Open ↗
11/12/2020440637713Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION2
11/25/2024440651812Open ↗
12/18/2020440651812Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
11/25/2024440651812Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/15/2021440651812Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
06/12/2023440637713Open ↗
▸BISMAINTENANCE INFORMATION1
06/12/2023440637713Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
11/25/2024440651812Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
06/12/2023440637713Open ↗
▸BISPLOT DIAGRAM1
12/30/2020440637713Open ↗