← Back
Two family converted from one family
104-17 204 STREET
QUEENS · BIN 4233337
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R3AZoning
1,802 sfGross Floor Area
2Units
Two family converted from one family · 3,200 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ElectricalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 3 docs
Cellar1p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/18/2020$700K—— → —$388/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC106/26/2026
MA ENGINEERING, P.C.102/18/2021
ASHRAF CORP101/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES203/21/2026
MA ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FA CONSTRUCTION NY INCGeneral Contractor303/21/2026
TRINITY SOLAR LLCGeneral Contractor107/03/2026
L.L.G. PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036106/26/2026
Building Lifecycle
All (28)Filed (3)Permit Issued (3)Signed Off (2)Inspection (8)Objection (12)
07/07/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/01/2026
Permit issued — Solar
Q01421269-I1-SL
06/26/2026
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q01421269-I1
01/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/16/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/08/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/22/2021
Signed off — Alteration
PROPOSED INTERIOR PLUMBING WORK FOR CONVERTING EXISTING 2-STORY 1-FAMILY TO 2-FAMILY WITH IN EXISTING BULK TO INSTALL 1 SHOWER AT 1ST FL, 1 SINK & 1 STOVE AT 2ND FL AS PER PLAN .NO CHANGE OF USE, EGRESS AND OCCUPANCY. NO CHANGE OF USE, EGRESS AND OCCUPANC
Q00434020-I1
10/13/2021
Signed off — Alteration
application filing to modify and repair existing curb cut in-conjunction with alt-1 job# 440653794 as per plan. no change of use, egress and occupancy.
Q00472478-I1
10/12/2021
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/21/2021
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/09/2021
Permit issued — Curb Cut
Q00472478-I1-CC
03/17/2021
Objection raised — Inspections
03/17/2021
Objection resolved — Addressed
03/17/2021
Objection raised — Zoning
03/17/2021
Objection resolved — Addressed
03/17/2021
Objection raised — Scope
03/17/2021
Objection resolved — Addressed
03/17/2021
Objection raised — Zoning
03/17/2021
Objection resolved — Addressed
03/17/2021
Objection raised — Structural
03/17/2021
Objection resolved — Addressed
03/17/2021
Objection raised — Inspections
03/17/2021
Objection resolved — Addressed
03/04/2021
Permit issued — Plumbing
Q00434020-I1-PL
02/18/2021
Filed — Alteration
application filing to modify and repair existing curb cut in-conjunction with alt-1 job# 440653794 as per plan. no change of use, egress and occupancy.
Q00472478-I1
01/02/2021
Filed — Alteration
PROPOSED INTERIOR PLUMBING WORK FOR CONVERTING EXISTING 2-STORY 1-FAMILY TO 2-FAMILY WITH IN EXISTING BULK TO INSTALL 1 SHOWER AT 1ST FL, 1 SINK & 1 STOVE AT 2ND FL AS PER PLAN .NO CHANGE OF USE, EGRESS AND OCCUPANCY. NO CHANGE OF USE, EGRESS AND OCCUPANC
Q00434020-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC07/01/2026
DOB NOWCurb CutSigned-offFA CONSTRUCTION NY INC09/09/2021
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC03/04/2021
BIS—ISSUEDFA CONSTRUCTION NY INC03/04/2021
2 projects · most recent 07/22/2026
General Wiring
FiledStatusContractorScope
07/22/2026CompleteREDLINE ELECTRIC INC—
08/23/2021CompleteV&B ELECTRICAL CONTNG INCGeneral Wiring
1 project · most recent 06/26/2026
FiledStatusContractorScope
06/26/2026Permit IssuedTRINITY SOLAR LLC16 panels, 6.56 kw, 1,600 roof_area_sqft
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/07/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/07/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/16/2024Pass-Final PL - UndergroundPassView ↗
08/08/2024Pass-Final PL - UndergroundPassView ↗
10/12/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
09/21/2021Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00434020-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026Q00472478-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/16/2026Q01421269-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION6
09/12/2022440653794Open ↗
12/03/2021440653794Open ↗
11/22/2021440653794Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
11/08/2021440653794Open ↗
09/28/2021440653794Open ↗
▸BISWORK PERMIT APPLICATION1
03/04/2021440653794Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
08/14/2022440653794Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/14/2022440653794Open ↗
▸BISPD1 FORM WITH BP TOPO UNIT VERIFICATION(ZR 12-10 #ZONING LOT#)1
01/20/2021440653794Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00434020-I1Open ↗
08/27/2026Q00472478-I1Open ↗
08/16/2026Q01421269-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/09/2020440653794Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/19/2022440653794Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
08/14/2022440653794Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/09/2020440653794Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/04/2021440653794Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01421269-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/14/2022440653794Open ↗
03/04/2021440653794Open ↗
12/09/2020440653794Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/14/2022440653794Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/24/2022440653794Open ↗
03/04/2021440653794Open ↗
03/02/2021440653794Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE5
12/03/2021440653794Open ↗
11/22/2021440653794Open ↗
10/18/2021440653794Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
08/14/2022440653794Open ↗
▸BISCOST AFFIDAVIT1
02/18/2021440653794Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION6
10/18/2022440653794Open ↗
09/14/2022440653794Open ↗
06/28/2022440653794Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
12/09/2020440653794Open ↗
▸Other Documents1
▸BISAMEND PW1 FORM SECTION #18 AS NEEDED (AC 28-118.6)1
08/16/2022440653794Open ↗