← Back
Two stories - detached, small or mid-size
104-23 FRANCIS LEWIS BLVD
QUEENS · Queens Village · BIN 4233444
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3-2Zoning
1,318 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,200 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Floor 12p · 1 filing · 14 docs
Cellar4p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABEJA ENGINEERING PLLC302/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COMMERCIAL CAPITAL USA603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MIKE'S HOME SOLUTIONS LLCGeneral Contractor303/21/2026
PLUMB-IT MECHANICAL INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABEJA ENGINEERING PLLC7269302/07/2024
Building Lifecycle
All (17)Filed (3)Permit Issued (3)Signed Off (2)Inspection (4)Special Inspection (5)
04/25/2024
Signed off — Alteration
Filed to amend filing Q00911742-I1 to indicate cellar floor consistently on plans. FILING TO LEGALIZE 2PC. BATHROOM(1 TOILET, 1 LAV. SINK) @ CELLAR FL.
Q00911742-S1
04/25/2024
Signed off — Alteration
Filed to amend filing Q00911742-I1 to indicate cellar floor consistently on plans. FILING TO LEGALIZE 2PC. BATHROOM(1 TOILET, 1 LAV. SINK) @ CELLAR FL.
Q00911742-S2
03/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/28/2024
Permit issued — Plumbing
Q00911742-S2-PL
02/07/2024
Filed — Alteration
Filed to amend filing Q00911742-I1 to indicate cellar floor consistently on plans. FILING TO LEGALIZE 2PC. BATHROOM(1 TOILET, 1 LAV. SINK) @ CELLAR FL.
Q00911742-S2
12/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
11/30/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/18/2023
Permit issued — Plumbing
Q00911742-S1-PL
10/17/2023
Permit issued — Structural
Q00911742-I1-GC-CX
08/28/2023
Filed — Alteration
Filed to amend filing Q00911742-I1 to indicate cellar floor consistently on plans. FILING TO LEGALIZE 2PC. BATHROOM(1 TOILET, 1 LAV. SINK) @ CELLAR FL.
Q00911742-S1
08/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
08/24/2023
Filed — Alteration
Filed to amend filing Q00911742-I1 to indicate cellar floor consistently on plans. FILING TO LEGALIZE 2PC. BATHROOM(1 TOILET, 1 LAV. SINK) @ CELLAR FL.
Q00911742-I1
07/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHANN VELEZ
07/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
07/30/2023
Special inspection requirement — Final
JOHANN VELEZ
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC02/28/2024
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC10/18/2023
DOB NOWStructuralPermit IssuedMIKE'S HOME SOLUTIONS LLC10/17/2023
1 project · most recent 02/07/2024
Water/Sanitary
FiledStatusContractorScope
02/07/2024Signed-offJVR PLBG AND HEATING INCWater/Sanitary
1 project · most recent 02/07/2024
Wood
FiledStatusContractorScope
02/07/2024Signed-offJVR PLBG AND HEATING INCWood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/02/2023Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
08/25/2023Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
07/30/2023Structural Stability – Alterations of existing buildingsJOHANN VELEZspecial
07/30/2023Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
07/30/2023FinalJOHANN VELEZprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026Q00911742-S2Request digital key ↗
08/23/2026Q00911742-S1Request digital key ↗
08/23/2026Q00911742-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWSpecial Inspector Seal & Signature4
09/19/2026Q00911742-S2Open ↗
09/01/2026Q00911742-I1Open ↗
09/01/2026Q00911742-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q00911742-S2Open ↗
08/13/2026Q00911742-S1Open ↗
08/13/2026Q00911742-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q00911742-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q00911742-S1Open ↗
08/13/2026Q00911742-S2Open ↗
08/13/2026Q00911742-I1Open ↗