← Back
Two family converted from one family
104-37 200 STREET
QUEENS · BIN 4233117
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3AZoning
2,398 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: 10437 200 STREET LLC · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 223p · 1 filing · 20 docs
Floor 123p · 1 filing · 20 docs
Cellar30p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARKSIDE REALTY GROUP1707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/20/2024$1.3M—127STREET DEVELOPERS LLC → 10437 200 STREET LLC$532/sf building
08/17/2023$515K—— → —$215/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.605/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor407/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781505/23/2024
Building Lifecycle
All (67)Filed (6)Permit Issued (3)Signed Off (2)Violation (5)Inspection (7)Objection (14)Special Inspection (30)
03/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/01/2024
Signed off — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH APPLICATION #Q00902737-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00902737-S2
08/01/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Masonry
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Chimneys and vents
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Metering
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
08/01/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
07/08/2024
Objection raised — Other
07/08/2024
Objection resolved — Addressed
06/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2024
Objection raised — Other
06/17/2024
Objection resolved — Addressed
06/04/2024
Signed off — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH APPLICATION #Q00902737-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00902737-S1
06/03/2024
Objection raised — Zoning
06/03/2024
Objection resolved — Addressed
05/23/2024
Filed — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH APPLICATION #Q00902737-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00902737-P2
05/23/2024
Filed — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH APPLICATION #Q00902737-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00902737-P3
05/21/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
05/21/2024
Special inspection requirement — Chimneys and vents
CHRISTIAN LOZADA
03/15/2024
Objection resolved — Addressed
03/14/2024
Objection raised — Energy
03/06/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/04/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/29/2024
Filed — Alteration CO
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH APPLICATION #Q00902737-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00902737-P1
02/27/2024
Violation issued (ECB, closed)
Unknown
02/27/2024
Violation issued (ECB, closed)
Unknown
02/27/2024
Violation issued (ECB, closed)
Construction
02/27/2024
Violation issued (ECB, closed)
Unknown
02/12/2024
Permit issued — Plumbing
Q00902737-S2-PL
02/09/2024
Violation issued (ECB, closed)
Construction
02/08/2024
Permit issued — General Construction
Q00902737-I1-GC-CX
02/05/2024
Objection resolved — Addressed
10/10/2023
Objection resolved — Addressed
10/06/2023
Objection raised — Energy
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/12/2024
DOB NOWGeneral ConstructionPermit IssuedPRECISION HOME DEV INC02/08/2024
DOB NOWConstruction FenceSigned-offPRECISION HOME DEV INC10/05/2023
1 project · most recent 05/23/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/23/2024Signed-offINFINITI ESC PLUMBING CORGas, Water/Sanitary
1 project · most recent 02/08/2024
General Wiring
FiledStatusContractorScope
02/08/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 05/23/2024
Steel Wood
FiledStatusContractorScope
05/23/2024Signed-offINFINITI ESC PLUMBING CORSteel, Wood
1 project · most recent 05/23/2024
Fence
FiledStatusContractorScope
05/23/2024Signed-offINFINITI ESC PLUMBING CORFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
08/01/2024Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
08/01/2024Excavations - Sheeting, Shoring, and BracingCHRISTIAN LOZADAspecial
08/01/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/01/2024Structural Steel - DetailsCHRISTIAN LOZADAspecial
08/01/2024MasonryCHRISTIAN LOZADAspecial
08/01/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
08/01/2024Chimneys and ventsCHRISTIAN LOZADAspecial
08/01/2024Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
08/01/2024Subgrade InspectionsCHRISTIAN LOZADAspecial
08/01/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/01/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
08/01/2024Structural Wood FrameCHRISTIAN LOZADAprogress
08/01/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/01/2024FinalCHRISTIAN LOZADAprogress
08/01/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
08/01/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
08/01/2024Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
08/01/2024Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
08/01/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
08/01/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
08/01/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
08/01/2024Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
08/01/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
08/01/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
08/01/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
Latest 25 of 62.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/22/2026Q00902737-S2Request digital key ↗
08/22/2026Q00902737-P3Request digital key ↗
08/22/2026Q00902737-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00902737-P2Open ↗
08/13/2026Q00902737-P1Open ↗
08/13/2026Q00902737-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00902737-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00902737-P3Open ↗
09/01/2026Q00902737-P3Open ↗
08/31/2026Q00902737-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026Q00902737-P1Open ↗
08/13/2026Q00902737-S2Open ↗
08/13/2026Q00902737-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q00902737-P3Open ↗
08/31/2026Q00902737-P2Open ↗
08/31/2026Q00902737-P2Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00902737-P1Open ↗
08/13/2026Q00902737-I1Open ↗
08/13/2026Q00902737-P2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026Q00902737-I1Open ↗
08/13/2026Q00902737-S2Open ↗
08/13/2026Q00902737-P1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q00902737-P2Open ↗
08/13/2026Q00902737-P1Open ↗
08/13/2026Q00902737-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00902737-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026Q00902737-P1Open ↗
08/13/2026Q00902737-I1Open ↗
08/13/2026Q00902737-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00902737-P2Open ↗
08/13/2026Q00902737-P1Open ↗
08/13/2026Q00902737-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00902737-I1Open ↗
08/13/2026Q00902737-P1Open ↗
08/13/2026Q00902737-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/13/2026Q00902737-I1Open ↗
08/13/2026Q00902737-P2Open ↗
08/13/2026Q00902737-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00902737-I1Open ↗