← Back
Two stories - detached, small or mid-size
104-38 122 STREET
QUEENS · South Ozone Park · BIN 4204367
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R4AZoning
1,162 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR108/09/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281108/09/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/20/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 8 Panels, 3.28 kW
Q01092453-I1
08/15/2024
Permit issued — Solar
Q01092453-I1-SL
08/09/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 8 Panels, 3.28 kW
Q01092453-I1
08/07/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
08/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
08/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
08/07/2024
Special inspection requirement — Final
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR08/15/2024
1 project · most recent 08/07/2024
FiledStatusContractorScope
08/07/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/07/2024Air barrier - visual inspectionMina Makarenergy_progress
08/07/2024Fire-Resistant Penetrations and JointsMina Makarspecial
08/07/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
08/07/2024Energy Code Compliance InspectionsMina Makarprogress
08/07/2024FinalMina Makarprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01092453-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q01092453-I1Open ↗
08/23/2026Q01092453-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01092453-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01092453-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01092453-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01092453-I1Open ↗