ECB05/02/2016PLANTING REQUIREMENT AT FRONT YARD. NOTD: AT TIME OF INSPECTION THE ENTIRE FRONT YARD WAS CONCRETE PAVED OF AN APPRX AREA OF 220 SQ FT ELIMINATING THE PLANTING AREA. RMDY: PROVIDE PLANTING AREA AT FRONT YARD ASNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 2,281 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.