Three families
104-58 39 AVENUE
QUEENS · BIN 4311597
💬 Discuss this project
1987Year Built
3Stories
C0Building Class
R5AZoning
4,408 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Three families · 2,365 sf lot · 1.86 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof12p · 1 filing · 20 docs
Floor 312p · 1 filing · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE OWNER OF303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/11/2022$1.4M—BAIRES GROUP LLC → Private party$306/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC301/16/2025
MEHDI GHAZI, P.E., P.C.207/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIMROSE SERVICE INCGeneral Contractor303/21/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEI ARCHITECT PLLC8095301/16/2025
MEHDI GHAZI, P.E. P.C.7129104/26/2024
Building Lifecycle
All (53)Filed (5)Permit Issued (2)Signed Off (2)Violation (17)Inspection (6)Special Inspection (21)
05/06/2026
Violation issued (HPD, closed)
A
06/11/2025
Violation issued (HPD, closed)
A
02/04/2025
Signed off — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00994937-I1
01/30/2025
Special inspection requirement — Interior lighting power
SIMING MEI
01/30/2025
Special inspection requirement — Metering
SIMING MEI
01/30/2025
Special inspection requirement — Energy Code Compliance Inspections
SIMING MEI
01/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
SIMING MEI
01/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMING MEI
01/16/2025
Filed — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00994937-P4
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMING MEI
01/16/2025
Special inspection requirement — Energy Code Compliance Inspections
SIMING MEI
01/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
SIMING MEI
01/16/2025
Special inspection requirement — Interior lighting power
SIMING MEI
01/16/2025
Special inspection requirement — Metering
SIMING MEI
12/30/2024
Signed off — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00994937-S1
11/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/25/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/09/2024
Filed — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00994937-P2
10/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
SIMING MEI
10/09/2024
Special inspection requirement — Energy Code Compliance Inspections
SIMING MEI
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMING MEI
10/09/2024
Special inspection requirement — Metering
SIMING MEI
10/09/2024
Special inspection requirement — Interior lighting power
SIMING MEI
08/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/31/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/30/2024
Permit issued — Plumbing
Q00994937-S1-PL
07/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
07/29/2024
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
07/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
07/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
07/29/2024
Special inspection requirement — Maintenance information
MEHDI GHAZI
07/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
07/25/2024
Filed — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00994937-P1
05/22/2024
Permit issued — General Construction
Q00994937-I1-GC
04/26/2024
Filed — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00994937-S1
04/12/2024
Violation issued (HPD, closed)
A
01/31/2024
Filed — Alteration CO
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00994937-I1
05/30/2023
Violation issued (HPD, open)
A
05/30/2023
Violation issued (HPD, open)
A
05/30/2023
Violation issued (HPD, closed)
C
05/30/2023
Violation issued (HPD, open)
A
05/30/2023
Violation issued (HPD, open)
A
03/27/2023
Violation issued (HPD, closed)
A
11/15/2022
Violation issued (HPD, closed)
I
03/03/2022
Violation issued (HPD, closed)
A
08/15/2016
Violation issued (HPD, closed)
B
08/15/2016
Violation issued (HPD, closed)
B
04/21/2007
Violation issued (ECB, closed)
Construction
02/21/1999
Violation issued (ECB, closed)
Quality of Life
02/21/1999
Violation issued (ECB, closed)
Quality of Life
02/21/1999
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO07/30/2024
DOB NOWGeneral ConstructionPermit IssuedPRIMROSE SERVICE INC05/22/2024
BISPLISSUEDS & L PLUMBING INC11/10/1998
BIS—ISSUEDWEN HUA CONSTRUCTION CORP08/03/1998
1 project · most recent 01/16/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/16/2025Signed-offWASOFF PLBG & UTILITY COGas, Water/Sanitary
1 project · most recent 11/19/2024
General Wiring
FiledStatusContractorScope
11/19/2024CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/25/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/31/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
01/30/2025Interior lighting powerSIMING MEIenergy_progress
01/30/2025MeteringSIMING MEIenergy_progress
01/30/2025Energy Code Compliance InspectionsSIMING MEIprogress
01/30/2025Fire-Resistance Rated ConstructionSIMING MEIprogress
01/30/2025Fire-Resistant Penetrations and JointsSIMING MEIspecial
01/16/2025Fire-Resistant Penetrations and JointsSIMING MEIspecial
01/16/2025Energy Code Compliance InspectionsSIMING MEIprogress
01/16/2025Fire-Resistance Rated ConstructionSIMING MEIprogress
01/16/2025Interior lighting powerSIMING MEIenergy_progress
01/16/2025MeteringSIMING MEIenergy_progress
10/09/2024Fire-Resistance Rated ConstructionSIMING MEIprogress
10/09/2024Energy Code Compliance InspectionsSIMING MEIprogress
10/09/2024Fire-Resistant Penetrations and JointsSIMING MEIspecial
10/09/2024MeteringSIMING MEIenergy_progress
10/09/2024Interior lighting powerSIMING MEIenergy_progress
07/29/2024Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
07/29/2024Energy Code Compliance InspectionsMEHDI GHAZIprogress
07/29/2024HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
07/29/2024HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
07/29/2024Maintenance informationMEHDI GHAZIenergy_progress
07/29/2024HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q00994937-P2Request digital key ↗
08/21/2026Q00994937-P1Request digital key ↗
08/21/2026Q00994937-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00994937-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00994937-P2Open ↗
09/01/2026Q00994937-P2Open ↗
09/01/2026Q00994937-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q00994937-P2Open ↗
08/21/2026Q00994937-P1Open ↗
08/21/2026Q00994937-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00994937-P2Open ↗
09/01/2026Q00994937-I1Open ↗
08/25/2026Q00994937-P4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/21/2026Q00994937-P2Open ↗
08/21/2026Q00994937-I1Open ↗
08/21/2026Q00994937-P4Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026Q00994937-P2Open ↗
08/21/2026Q00994937-P1Open ↗
08/21/2026Q00994937-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/21/2026Q00994937-P2Open ↗
08/21/2026Q00994937-I1Open ↗
08/21/2026Q00994937-P4Open ↗