← Back
Predominantly retail with other uses
104-65 ATLANTIC AVENUE
QUEENS · BIN 4195371
💬 Discuss this project
1930Year Built
2Stories
K4Building Class
R6AZoning
4,029 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: JPA ATLANTIC AVE LLC · 2,100 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Roof2p · 1 filing · 13 docs
Bulkhead1p · 1 filing · 20 docs
Floor 21p · 1 filing · 13 docs
Floor 1
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BOROUGH SCAFFOLDING1407/08/2026
TONAV CONSTRUCTION CORP1603/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/24/2019$450K—Private party → Private party$112/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROHAN ENGINEERING, PC1012/03/2022
IW ARCHITECTURE, PLLC311/22/2021
PAUL PERDEK, PROF. ENG. PLLC507/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1003/21/2026
VRD DEVELOPMENT2003/21/2026
NEW YORK SIGN CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor1207/08/2026
TONAR CONSTRUCTION CORPGeneral Contractor1007/08/2026
MAUCERI SIGNScaffold307/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
PAL-MAR PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROHAN ENGINEERING, PC2600612/03/2022
Building Lifecycle
All (100)Filed (18)Permit Issued (17)Signed Off (9)Violation (26)Inspection (4)Special Inspection (26)
01/03/2023
Signed off — Alteration
Q00204858-I1
12/09/2022
Permit issued — Mechanical Systems
Q00204858-I1-MS
12/03/2022
Filed — Alteration
Q00204858-I1
05/26/2022
Signed off — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH A ALT 1 APPLICATION TO RENOVATE AND ADD A NEW SECOND FLOOR TO AN EXISTING ONE STORY COMMERCIAL BUILDING.
Q00204851-I1
04/11/2022
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH A ALT 1 APPLICATION TO RENOVATE AND ADD A NEW SECOND FLOOR TO AN EXISTING ONE STORY COMMERCIAL BUILDING.
Q00204851-P2
04/11/2022
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ROHAN
04/11/2022
Special inspection requirement — HVAC insulation and sealing
BRIAN ROHAN
04/09/2022
Special inspection requirement — HVAC insulation and sealing
BRIAN ROHAN
04/09/2022
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ROHAN
04/07/2022
Signed off — Alteration
propose temporary construction fence, in conjunction with a separate ALT1 application.
Q00204846-I1
04/07/2022
Signed off — Alteration
PROPOSE STRUCTURAL WORK TYPE TO RENOVATE EXISTING ONE STORY COMMERCIAL BUILDING AND ADD NEW SECOND FLOOR.
Q00204852-I1
03/21/2022
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH A ALT 1 APPLICATION TO RENOVATE AND ADD A NEW SECOND FLOOR TO AN EXISTING ONE STORY COMMERCIAL BUILDING.
Q00204851-P1
01/24/2022
Signed off — Alteration
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY AWNING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00627542-I1
01/24/2022
Signed off — Alteration
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY AWNING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00627600-I1
01/21/2022
Signed off — Alteration
Q00627524-I1
11/23/2021
Permit issued — Sign
Q00627542-I1-SG
11/23/2021
Permit issued — Sign
Q00627524-I1-SG
11/23/2021
Permit issued — Sign
Q00627600-I1-SG
11/22/2021
Filed — Alteration
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY AWNING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00627542-I1
11/22/2021
Filed — Alteration
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY AWNING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00627600-I1
11/22/2021
Filed — Alteration
Q00627524-I1
11/18/2021
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00309161-I1
11/15/2021
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00336737-I1
11/09/2021
Special inspection requirement — Final
Israel Wertentheil
11/01/2021
Permit issued — Structural
Q00204852-I1-ST
10/29/2021
Special inspection requirement — Final
BRIAN ROHAN
10/29/2021
Special inspection requirement — Masonry
BRIAN ROHAN
10/29/2021
Special inspection requirement — Structural Cold-Formed Steel
BRIAN ROHAN
10/29/2021
Special inspection requirement — Structural Steel - Details
BRIAN ROHAN
10/29/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ROHAN
10/27/2021
Filed — Alteration
PROPOSE STRUCTURAL WORK TYPE TO RENOVATE EXISTING ONE STORY COMMERCIAL BUILDING AND ADD NEW SECOND FLOOR.
Q00204852-P4
10/27/2021
Special inspection requirement — Masonry
BRIAN ROHAN
10/27/2021
Special inspection requirement — Final
BRIAN ROHAN
10/27/2021
Special inspection requirement — Structural Steel - Details
10/27/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ROHAN
10/27/2021
Special inspection requirement — Structural Cold-Formed Steel
BRIAN ROHAN
09/22/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/22/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/22/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/22/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/21/2021
Special inspection requirement — Final
Paul Perdek
07/20/2021
Permit issued — Plumbing
Q00204851-I1-PL
07/19/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00336737-P2
07/09/2021
Filed — Alteration
PROPOSE STRUCTURAL WORK TYPE TO RENOVATE EXISTING ONE STORY COMMERCIAL BUILDING AND ADD NEW SECOND FLOOR.
Q00204852-P3
06/10/2021
Filed — Alteration
PROPOSE PLUMBING WORK IN CONJUNCTION WITH A ALT 1 APPLICATION TO RENOVATE AND ADD A NEW SECOND FLOOR TO AN EXISTING ONE STORY COMMERCIAL BUILDING.
Q00204851-I1
06/03/2021
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00309161-P1
06/03/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00336737-P1
06/03/2021
Special inspection requirement — Final
Paul Perdek
05/24/2021
Violation issued (ECB, closed)
Site Safety
05/21/2021
Violation issued (ECB, closed)
Unknown
05/21/2021
Violation issued (ECB, closed)
Construction
05/21/2021
Violation issued (ECB, closed)
Unknown
05/21/2021
Violation issued (ECB, closed)
Construction
05/21/2021
Violation issued (ECB, closed)
Site Safety
05/21/2021
Violation issued (ECB, closed)
Construction
05/21/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTONAR CONSTRUCTION CORP12/09/2022
DOB NOWSignSigned-offMAUCERI SIGN CO., INC11/23/2021
DOB NOWSignSigned-offMAUCERI SIGN CO., INC11/23/2021
DOB NOWSignSigned-offMAUCERI SIGN CO., INC11/23/2021
DOB NOWStructuralSigned-offTONAR CONSTRUCTION CORP11/01/2021
DOB NOWPlumbingSigned-offPAL-MAR PLBG & HTG INC07/20/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING04/01/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING04/01/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING02/16/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING01/26/2021
DOB NOWConstruction FenceSigned-offTONAR CONSTRUCTION CORP12/23/2020
DOB NOWConstruction FenceSigned-offTONAR CONSTRUCTION CORP12/08/2020
DOB NOWConstruction FenceSigned-offTONAR CONSTRUCTION CORP11/02/2020
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING03/25/2020
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING02/05/2020
DOB NOWConstruction FenceSigned-offTONAR CONSTRUCTION CORP12/20/2019
DOB NOWConstruction FenceSigned-offTONAR CONSTRUCTION CORP12/05/2019
BIS—ISSUEDTONAR CONSTRUCTION CORP01/08/2021
BIS—ISSUEDTONAR CONSTRUCTION CORP01/08/2021
3 projects · most recent 03/08/2023
General Wiring Lighting
FiledStatusContractorScope
03/08/2023CompleteSAFEWAY CONSTRUCTION, INC—
11/02/2020CompleteSAFEWAY CONSTRUCTION, INCGeneral Wiring, Lighting
02/05/2020CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/22/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/22/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/22/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/22/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
04/11/2022Energy Code Compliance InspectionsBRIAN ROHANprogress
04/11/2022HVAC insulation and sealing BRIAN ROHANenergy_progress
04/09/2022HVAC insulation and sealing BRIAN ROHANenergy_progress
04/09/2022Energy Code Compliance InspectionsBRIAN ROHANprogress
11/09/2021FinalIsrael Wertentheilprogress
10/29/2021FinalBRIAN ROHANprogress
10/29/2021MasonryBRIAN ROHANspecial
10/29/2021Structural Cold-Formed SteelBRIAN ROHANspecial
10/29/2021Structural Steel - DetailsBRIAN ROHANspecial
10/29/2021Structural Stability – Alterations of existing buildingsBRIAN ROHANspecial
10/27/2021MasonryBRIAN ROHANspecial
10/27/2021FinalBRIAN ROHANprogress
10/27/2021Structural Steel - Details—special
10/27/2021Structural Stability – Alterations of existing buildingsBRIAN ROHANspecial
10/27/2021Structural Cold-Formed SteelBRIAN ROHANspecial
07/21/2021FinalPaul Perdekprogress
06/03/2021FinalPaul Perdekprogress
11/03/2020Final—progress
11/03/2020MasonryBRIAN ROHANspecial
11/03/2020Structural Cold-Formed SteelBRIAN ROHANspecial
11/03/2020Structural Stability – Alterations of existing buildingsBRIAN ROHANspecial
09/30/2020MasonryBRIAN ROHANspecial
09/30/2020Structural Stability – Alterations of existing buildingsBRIAN ROHANspecial
09/30/2020Structural Cold-Formed SteelBRIAN ROHANspecial
09/30/2020Final—progress
Latest 25 of 26.
▾Documents — 164 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch - Structural5
08/28/2026Q00204852-P3Request digital key ↗
08/28/2026Q00204852-I1Request digital key ↗
08/15/2026Q00204852-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch3
08/27/2026Q00627600-I1Request digital key ↗
08/27/2026Q00627542-I1Request digital key ↗
08/27/2026Q00627524-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/26/2026Q00204851-I1Request digital key ↗
08/26/2026Q00204851-P1Request digital key ↗
08/26/2026Q00204851-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold3
08/28/2026Q00336737-I1Request digital key ↗
08/15/2026Q00336737-P2Request digital key ↗
08/15/2026Q00336737-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00309161-I1Request digital key ↗
08/15/2026Q00309161-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00204846-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026Q00204858-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION15
05/11/2023421931146Open ↗
05/05/2023421931146Open ↗
04/26/2023421931146Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION8
03/25/2021421931146Open ↗
03/25/2021421931146Open ↗
01/02/2020421931146Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
11/16/2022421937435Open ↗
11/12/2019421937435Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/24/2022421931146Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
01/12/2022421931146Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/20/2022421931146Open ↗
▸BISZONING DIAGRAM1
10/10/2019421931146Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/28/2026Q00309161-I1Open ↗
08/28/2026Q00309161-P1Open ↗
08/28/2026Q00204852-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026Q00204852-P2Open ↗
09/01/2026Q00204852-P2Open ↗
09/01/2026Q00204852-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q00204846-I1Open ↗
08/31/2026Q00204852-P4Open ↗
08/30/2026Q00336737-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/27/2019421931146Open ↗
12/18/2019421931146Open ↗
12/18/2019421931146Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/10/2019421931146Open ↗
09/24/2019421931146Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/30/2019421931146Open ↗
▸Trade Schedules & Equipment5
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/12/2022421931146Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/12/2022421931146Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/27/2023421931146Open ↗
▸BISPLUMBING (PL) SIGNOFF1
11/28/2022421931146Open ↗
▸BISHEATING SYSTEMS1
01/12/2022421931146Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
11/12/2019421937435Open ↗
08/30/2019421931146Open ↗
▸BISSTREET TREE SIGNOFF1
04/27/2023421931146Open ↗
▸BISSTREET TREES SITE PLAN1
01/12/2022421931146Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/27/2019421937435Open ↗
12/18/2019421931146Open ↗
10/10/2019421931146Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
12/27/2019421937435Open ↗
12/18/2019421931146Open ↗
10/10/2019421931146Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/26/2026Q00204851-I1Open ↗
08/13/2026Q00204852-I1Open ↗
08/13/2026Q00204858-I1Open ↗
▸Energy Compliance10
▸BISAIR SEALING AND INSULATION - VISUAL1
01/12/2022421931146Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/12/2022421931146Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/12/2022421931146Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/12/2022421931146Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/12/2022421931146Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/12/2022421931146Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/12/2022421931146Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/27/2019421931146Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/12/2022421931146Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00204851-I1Open ↗
▸Inspections & Test Reports9
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/12/2022421931146Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/12/2022421931146Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/12/2022421931146Open ↗
▸BISMASONRY1
01/12/2022421931146Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/12/2022421931146Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/18/2019421931146Open ↗
▸BISMECHANICAL SYSTEMS1
01/12/2022421931146Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
01/12/2022421931146Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/12/2022421931146Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE5
05/05/2023421931146Open ↗
04/20/2023421931146Open ↗
04/03/2023421931146Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION (OT) SIGNOFF1
04/27/2023421931146Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/02/2020421931146Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE3
03/25/2021421931146Open ↗
01/02/2020421931146Open ↗
12/27/2019421931146Open ↗
▸BISCOST AFFIDAVIT2
09/24/2019421931146Open ↗
08/30/2019421931146Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/12/2022421931146Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
12/27/2019421931146Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
03/25/2021421931146Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
11/03/2022421937435Open ↗
05/10/2022421931146Open ↗
10/10/2019421931146Open ↗
▸BISEFILING COVER SHEET2
11/12/2019421937435Open ↗
08/30/2019421931146Open ↗
▸BISBOROUGH INTAKE FORM1
03/25/2021421931146Open ↗
▸Other Documents12
▸BISBPP - SUPPORTING DOCUMENTATION3
11/30/2021421937435Open ↗
11/30/2021421937435Open ↗
11/15/2021421937435Open ↗
▸BISLOWEST FLOOR ELEVATION1
04/20/2022421931146Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/30/2021421937435Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
01/12/2022421931146Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
01/12/2022421931146Open ↗
▸BISMAINTENANCE INFORMATION1
01/12/2022421931146Open ↗
▸BISPERMANENT CERTIFICATE1
01/12/2022421931146Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/18/2019421931146Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
01/12/2022421931146Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
11/30/2021421937435Open ↗