← Back
BuildNYC
Elevator apt, fireproof without stores
104 FROST STREET
BROOKLYN · BIN 3068159
💬 Discuss this project
2024Year Built
8Stories
D3Building Class
M1-2/R6Zoning
18,481 sfGross Floor Area
20Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: 104 Frost · 5,000 sf lot · 3.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsStructural framing, 2nd to 8th floors and roof2 filings
Floor 1Curb cut work1p · 2 filings
Site & exteriorTemporary sidewalk shed installation9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Smart Consulting NY404/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/02/2023$4.9M—Private party → 104 FROST LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Diego Aguilera Architects2203/07/2025
KZ Engineering805/24/2024
Grid Drafting and Consulting103/06/2024
Philibert Engineering111/01/2023
Mje Professional Services102/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants803/21/2026
Sierra Safety403/21/2026
YG Expediting2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Success DevelopersGeneral Contractor1307/08/2026
CS BridgeScaffold807/08/2026
Success DevelopersScaffold504/09/2026
Creative Plumbing inPlumbing307/08/2026
Sunshine Construction USAGeneral Contractor104/09/2026
Metflow Fire ControlFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161803/07/2025
Building Lifecycle
01/01/2027
421-a(16) construction completed
12/09/2025
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
B00735002-I1-GC
08/21/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/10/2025
Signed off — New Building
Plumbing Work type filed in conjunction with NB Job #B00735002-I1
B00735002-S2
132 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offCS Bridge12/23/2024
DOB NOWPlumbingSigned-offAB Plumbing12/16/2024
DOB NOWGeneral ConstructionPermit IssuedSuccess Developers12/09/2024
DOB NOWConstruction FenceSigned-offSuccess Developers12/02/2024
DOB NOWGeneral ConstructionPermit IssuedSuccess Developers12/02/2024
DOB NOWSupport of ExcavationSigned-offSuccess Developers11/27/2024
DOB NOWSprinklersSigned-offMetflow Fire Control09/19/2024
DOB NOWCurb CutSigned-offSuccess Developers08/16/2024
DOB NOWStructuralSigned-offSuccess Developers06/28/2024
DOB NOWMechanical SystemsSigned-offSuccess Developers06/27/2024
DOB NOWSupported ScaffoldSigned-offSuccess Developers06/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offSuccess Developers06/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offCS Bridge02/01/2024
DOB NOWSupported ScaffoldSigned-offCS Bridge01/31/2024
DOB NOWProtection and Mechanical MethodsSigned-offCS Bridge01/31/2024
DOB NOWProtection and Mechanical MethodsSigned-offCS Bridge01/31/2024
DOB NOWSidewalk ShedSigned-offCS Bridge01/31/2024
DOB NOWFoundationSigned-offSuccess Developers12/14/2023
DOB NOWPlumbingSigned-offAB Plumbing12/14/2023
DOB NOWConstruction FenceSigned-offSuccess Developers12/13/2023
DOB NOWEarth WorkSigned-offSuccess Developers08/29/2023
DOB NOWFoundationSigned-offSuccess Developers05/18/2023
DOB NOWSidewalk ShedSigned-offCS Bridge05/04/2023
DOB NOWConstruction FenceSigned-offSuccess Developers04/19/2023
DOB NOWEarth WorkSigned-offSunshine Construction USA06/10/2022
BIS—ISSUEDAlba Services05/17/2023
1 project · most recent 03/07/2025
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
03/07/2025Permit IssuedSuccess DevelopersAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 03/07/2025
Storm Water/Sanitary
FiledStatusContractorScope
03/07/2025Signed-offCreative Plumbing inStorm, Water/Sanitary
4 projects · most recent 05/05/2025
General Wiring
FiledStatusContractorScope
05/05/2025CompletePower Direct ElectricGeneral Wiring
12/17/2024CompletePower Direct Electric—
05/22/2024CompletePower Direct Electric—
05/04/2023CompleteNash Electric Services—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/21/2025Fail-Final CND-Occupancy InspectionFailView ↗
07/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/10/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/23/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/05/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/15/2024Pass-Final PL - UndergroundPassView ↗
03/26/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 115
DateRequirementInspectorRole
02/05/2025Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
02/05/2025Concrete - Cast-In-PlaceFAHAD FATEHspecial
02/05/2025Interior lighting powerFAHAD FATEHenergy_progress
02/05/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/05/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
02/05/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
02/05/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
02/05/2025Maintenance informationFAHAD FATEHenergy_progress
02/05/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/05/2025Exterior lighting powerFAHAD FATEHenergy_progress
02/05/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
02/05/2025Air barrier continuity plan testingFAHAD FATEHenergy_progress
02/05/2025MeteringFAHAD FATEHenergy_progress
02/05/2025Air barrier — testing FAHAD FATEHenergy_progress
02/05/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
02/05/2025Fenestration air leakageFAHAD FATEHenergy_progress
02/05/2025Lighting controlsFAHAD FATEHenergy_progress
02/05/2025Fenestration areasFAHAD FATEHenergy_progress
02/05/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/05/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
02/05/2025Subsurface Investigations (Borings/Test Pits)SOORJBALLY HARILALLspecial
02/05/2025Subgrade InspectionsFAHAD FATEHspecial
02/05/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/05/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
01/30/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 115.
210 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account