← Back
One family attached or semi-detached
104 MONAHAN AVENUE
STATEN ISLAND · BIN 5175391
💬 Discuss this project
2024Year Built
2Stories
A5Building Class
R3-1Zoning
1,572 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,305 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivil
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALLACE AVENUE CONSTRUCTION903/22/2026
WALLACE AVENUE CONST.LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT512/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALLACE AVENUE CONSTR LLCGeneral Contractor603/21/2026
DV PLUMBING INCPlumbing107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISLAND ENGINEERING ASSOCI264212/30/2024
Building Lifecycle
All (48)Filed (5)Permit Issued (5)Signed Off (2)Violation (1)Inspection (7)Special Inspection (28)
12/30/2024
Filed — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
S08027166-P2
12/30/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Mechanical Systems
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Air barrier - visual inspection
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM DURDEN, P.E.
12/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM DURDEN, P.E.
12/13/2024
Signed off — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
S08027166-S2
11/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/30/2024
Filed — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
S08027166-P1
10/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/22/2024
Signed off — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
S08027166-S1
07/18/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/07/2024
Permit issued — Earth Work
S08027166-I1-GC-CX
03/07/2024
Permit issued — Plumbing
S08027166-S2-PL
03/06/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/12/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/24/2023
Permit issued — Plumbing
S08027166-S2-PL
08/02/2023
Filed — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
S08027166-S2
06/28/2023
Permit issued — Curb Cut
S08027166-S1-CC
06/14/2023
Filed — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
S08027166-S1
05/08/2023
Permit issued — Structural
S08027166-I1-GC-CX
02/17/2023
Filed — New Building
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
S08027166-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedWALLACE AVENUE CONSTR LLC05/07/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC03/07/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR11/24/2023
DOB NOWCurb CutSigned-offWALLACE AVENUE CONSTR LLC06/28/2023
DOB NOWStructuralPermit IssuedWALLACE AVENUE CONSTR LLC05/08/2023
1 project · most recent 12/30/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/30/2024Signed-offDV PLUMBING INCGas, Storm, Water/Sanitary
1 project · most recent 03/03/2024
General Wiring
FiledStatusContractorScope
03/03/2024CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
1 project · most recent 12/30/2024
Concrete Wood
FiledStatusContractorScope
12/30/2024Permit IssuedWALLACE AVENUE CONSTR LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
12/30/2024Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
12/30/2024Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
12/30/2024Mechanical SystemsWILLIAM DURDEN, P.E.special
12/30/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
12/30/2024Structural Steel - High Strength BoltingWILLIAM DURDEN, P.E.special
12/30/2024Subgrade InspectionsWILLIAM DURDEN, P.E.special
12/30/2024Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
12/30/2024Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
12/30/2024FinalWILLIAM DURDEN, P.E.progress
12/30/2024Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
12/30/2024Footing and FoundationWILLIAM DURDEN, P.E.progress
12/30/2024Structural Wood FrameWILLIAM DURDEN, P.E.progress
12/30/2024HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
12/30/2024Air barrier — testing WILLIAM DURDEN, P.E.energy_progress
12/30/2024Fenestration air leakageWILLIAM DURDEN, P.E.energy_progress
12/30/2024HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
12/30/2024Insulation placement and R valuesWILLIAM DURDEN, P.E.energy_progress
12/30/2024Air barrier - visual inspectionWILLIAM DURDEN, P.E.energy_progress
12/30/2024Fenestration and door U-factor and product ratingsWILLIAM DURDEN, P.E.energy_progress
12/30/2024Maintenance informationWILLIAM DURDEN, P.E.energy_progress
12/30/2024Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
12/30/2024Duct leakage testing, insulation and designWILLIAM DURDEN, P.E.energy_progress
12/30/2024Fenestration areasWILLIAM DURDEN, P.E.energy_progress
12/30/2024Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
12/30/2024Electric vehicle service equipment requirementsWILLIAM DURDEN, P.E.energy_progress
Latest 25 of 28.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026S08027166-I1Request digital key ↗
08/20/2026S08027166-P2Request digital key ↗
08/20/2026S08027166-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S08027166-I1Open ↗
08/13/2026S08027166-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S08027166-I1Open ↗
08/13/2026S08027166-P2Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026S08027166-P2Open ↗
08/13/2026S08027166-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08027166-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026S08027166-P2Open ↗
08/20/2026S08027166-P1Open ↗
08/20/2026S08027166-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026S08027166-P2Open ↗
08/27/2026S08027166-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026S08027166-P2Open ↗
08/27/2026S08027166-P2Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S08027166-P2Open ↗
08/13/2026S08027166-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S08027166-P2Open ↗
08/13/2026S08027166-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08027166-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08027166-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08027166-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026S08027166-P2Open ↗
08/13/2026S08027166-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S08027166-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S08027166-P2Open ↗
08/13/2026S08027166-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026S08027166-I1Open ↗
08/20/2026S08027166-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S08027166-P2Open ↗
08/13/2026S08027166-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08027166-I1Open ↗