← Back
Two stories - detached, small or mid-size
104 PLEASANT PLAINS AVE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5087024
💬 Discuss this project
1899Year Built
2Stories
A1Building Class
R3XZoning
1,000 sfGross Floor Area
1Units
7 Open Violations 0 unresolved · 7 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,096 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROPERTIES 360 CORP903/22/2026
104 PLEASANT PLAINS LLC 1403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL DERUVO & ASSOC. ARCHITECTS206/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AL SAEED CONSTRUCTIONGeneral Contractor303/21/2026
EMPIRE PLUMBING INCPlumbing107/08/2026
Building Lifecycle
All (12)Filed (2)Permit Issued (2)Signed Off (1)Violation (4)Inspection (2)Special Inspection (1)
02/20/2023
Violation issued (ECB, open)
Construction
02/20/2023
Violation issued (ECB, open)
Construction
02/20/2023
Violation issued (ECB, open)
Construction
02/20/2023
Violation issued (ECB, open)
Construction
12/16/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/14/2022
Signed off — Alteration
APPLICATION FILED HEREWITH FOR TOTAL INTERIOR RENOVATION TO EXISTING RESIDENCE.
S00721433-I1
08/24/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2022
Permit issued — General Construction
S00721433-I1-GC
07/15/2022
Permit issued — Plumbing
S00730136-I1-PL
06/10/2022
Filed — Alteration
APPLICATION FILED HEREWITH FOR TOTAL INTERIOR RENOVATION TO EXISTING RESIDENCE.
S00721433-I1
06/10/2022
Filed — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK BEING DONE AT CELLAR, FIRST AND SECOND FLOOR LEVELS IN CONJUNCTION WITH ALTERATION TYPE 2 APPLICATION.
S00730136-I1
04/19/2022
Special inspection requirement — Final
MICHAEL DERUVO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAL SAEED CONSTRUCTION07/25/2022
DOB NOWPlumbingSigned-offEMPIRE PLUMBING INC07/15/2022
1 project · most recent 06/10/2022
Water/Sanitary
FiledStatusContractorScope
06/10/2022Signed-offEMPIRE PLUMBING INCWater/Sanitary
1 project · most recent 09/09/2022
General Wiring
FiledStatusContractorScope
09/09/2022CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/16/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
04/19/2022FinalMICHAEL DERUVOprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026S00721433-I1Request digital key ↗
08/24/2026S00730136-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026S00730136-I1Open ↗
08/13/2026S00721433-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026S00721433-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026S00730136-I1Open ↗
08/13/2026S00721433-I1Open ↗