← Back
Miscellaneous asylum / home
104 RICHARDS STREET
💬 Discuss this project
1925Year Built
3Stories
N9Building Class
R6Zoning
9,933 sfGross Floor Area
1Units
1 Open Violation ▸
Miscellaneous asylum / home · 10,000 sf lot · 0.99 FAR built · Flood zone X500
Locations of Work
Mechanical
Cellar1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKLYN ASSET1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.310/19/2022
NEW AGE ENGINEERING PLLC107/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BONDEE ENTERPRISES INCPlumbing207/08/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851310/19/2022
NEW AGE ENGINEERING PLLC7746107/11/2022
Building Lifecycle
All (33)Filed (4)Permit Issued (3)Signed Off (3)Violation (5)Inspection (3)Special Inspection (15)
08/25/2023
Signed off — Alteration
FILING (2) HOT WATER HEATERS, (1) GAS STOVE AND (1) GAS DRYER. GAS CONNECTION TO BOILER. NEW GAS PIPING.
B08017755-I1
08/21/2023
Signed off — Alteration
REGISTER REPLACEMENT GAS BOILER.
B08016893-I1
07/25/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/19/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/20/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
10/20/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
10/20/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
10/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
10/20/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
10/19/2022
Filed — Alteration
REGISTER REPLACEMENT GAS BOILER.
B08016893-P1
10/19/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
10/19/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
10/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
10/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
10/19/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
10/18/2022
Permit issued — Plumbing
B08017755-I1-PL
10/14/2022
Permit issued — Boiler Equipment
B08016893-I1-BE
10/13/2022
Filed — Alteration
FILING (2) HOT WATER HEATERS, (1) GAS STOVE AND (1) GAS DRYER. GAS CONNECTION TO BOILER. NEW GAS PIPING.
B08017755-I1
10/13/2022
Filed — Alteration
REGISTER REPLACEMENT GAS BOILER.
B08016893-I1
10/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/07/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
10/04/2022
Signed off — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00769306-I1
07/11/2022
Filed — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00769306-I1
07/11/2022
Permit issued — Mechanical Systems
B00769306-I1-MS
07/05/2022
Special inspection requirement — Final
Stephen Shishko
07/05/2022
Special inspection requirement — Chimneys and vents
Stephen Shishko
07/05/2022
Special inspection requirement — Mechanical Systems
Stephen Shishko
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBONDEE ENTERPRISES INC10/18/2022
DOB NOWBoiler EquipmentSigned-offBONDEE ENTERPRISES INC10/14/2022
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME07/11/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/19/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/20/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/20/2022Maintenance informationLOUIS ARENAenergy_progress
10/20/2022Heating SystemsLOUIS ARENAspecial
10/20/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/20/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/19/2022Heating SystemsLOUIS ARENAspecial
10/19/2022Maintenance informationLOUIS ARENAenergy_progress
10/19/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/19/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/19/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/13/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
10/07/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
07/05/2022FinalStephen Shishkoprogress
07/05/2022Chimneys and ventsStephen Shishkospecial
07/05/2022Mechanical SystemsStephen Shishkospecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026B00769306-I1Request digital key ↗
08/28/2026B08017755-I1Request digital key ↗
08/28/2026B08016893-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B08016893-I1Open ↗
08/28/2026B08017755-I1Open ↗
08/24/2026B08016893-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026B08017755-I1Open ↗
08/28/2026B08016893-P1Open ↗
08/28/2026B08016893-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B08016893-I1Open ↗
08/28/2026B08017755-I1Open ↗
08/24/2026B08016893-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026B08017755-I1Open ↗
08/28/2026B08016893-I1Open ↗
08/28/2026B08016893-P1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/28/2026B08016893-P1Open ↗
08/28/2026B08016893-I1Open ↗
08/13/2026B08017755-I1Open ↗
Showing 3 of 4 on file for this type