| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/14/2026 | — | — | Air Conditioning Systems, Ventilation Systems | Cooling Climatemaster TCH024 2 tons · Heat Pump Outdoor ×1 TCH060 5 tons · Heat Pump Outdoor ×1 TCV060 5 tons · Heat Pump Outdoor ×1 |
| 08/06/2026 | — | — | Air Conditioning Systems, Ventilation Systems | Cooling Climatemaster TCH024 2 tons · Heat Pump Outdoor ×1 TCH060 5 tons · Heat Pump Outdoor ×1 TCV060 5 tons · Heat Pump Outdoor ×1 |
| 05/05/2025 | Permit Issued | SKYLINE DEVELOPERS CONSTR | Air Conditioning Systems | Cooling Florida Heat Pump CL012 12,000 BTU · Wshp ×3 CL048 48,000 BTU · Wshp ×2 CL018 18,000 BTU · Wshp ×1 CL024 24,000 BTU · Wshp ×1 CL030 29,200 BTU · Wshp ×1 CL042 42,000 BTU · Wshp ×1 |
| 12/16/2024 | Permit Issued | SKYLINE DEVELOPERS CONSTR | Air Conditioning Systems | Cooling Florida Heat Pump CL012 12,200 BTU · Wshp ×7 CL018 18,000 BTU · Wshp ×4 CL030 29,200 BTU · Wshp ×2 CL036 36,000 BTU · Wshp ×1 CLO36 36,000 BTU · Wshp ×1 |
| 02/23/2024 | Permit Issued | SKYLINE DEVELOPERS CONSTR | Air Conditioning Systems, Heating Systems | Cooling Florida Heat Pump AC-15-7: QV030-3HZC-FREDUA
AC-15-8 & AC-15-10: QV030-3HZC-FLSDUA 29,200 BTU · Wshp ×3 AC-15-1: QV024-3HZC-FLEDUA AC-15-2: QV024-3HZC-FLSDUA 24,200 BTU · Wshp ×2 LV012-1HZC-FREPUD 11,100 BTU · Wshp ×2 LV009-1HZC-FLSPUD 8,100 BTU · Wshp ×1 LV009-1HZC-FREPUD 8,100 BTU · Wshp ×1 QV018-1HZC-FRSDUA 13,800 BTU · Wshp ×1 Heating Florida Heat Pump AC-15-7: QV030-3HZC-FREDUA
AC-15-8 & AC-15-10: QV030-3HZC-FLSDUA 36,000 BTU ×3 AC-15-1: QV024-3HZC-FLEDUA AC-15-2: QV024-3HZC-FLSDUA 19,500 BTU ×2 LV012-1HZC-FREPUD 13,800 BTU ×2 LV009-1HZC-FLSPUD 10,700 BTU ×1 LV009-1HZC-FREPUD 10,400 BTU ×1 QV018-1HZC-FRSDUA 17,100 BTU ×1 |
| 02/04/2022 | Permit Issued | SKYLINE DEVELOPERS CONSTR | Air Conditioning Systems | |
| 10/05/2021 | Permit Issued | SKYLINE DEVELOPERS CONSTR | Air Conditioning Systems | Cooling York CU240A25AIA 20 tons · Condensing Unit ×1 |
| 08/23/2021 | Permit Issued | SKYLINE DEVELOPERS CONSTR | Air Conditioning Systems | Cooling Comfort Aire HBH012A1C30CLS 13,000 BTU · Fan Coil Indoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/14/2026 | — | — | — |
| 08/06/2026 | Permit Issued | AQUEDUCT MECHANICAL CORP | — |
| 05/05/2025 | — | — | Sprinkler System |
| 03/14/2025 | Permit Issued | DEMAR PLUMBING CORP | 37 heads |
| 01/06/2025 | Signed-off | DEMAR PLUMBING CORP | 112 heads |
| 01/04/2024 | Signed-off | DEMAR PLUMBING CORP | Sprinkler System |
| 11/13/2023 | Permit Issued | DEMAR PLUMBING CORP | Sprinkler System |
| 11/10/2022 | Permit Issued | AMOK INC | 76 heads |
| 07/27/2022 | Signed-off | DEMAR PLUMBING CORP | — |
| 02/04/2022 | Signed-off | DEMAR PLUMBING CORP | 101 heads |
| 12/16/2021 | Signed-off | DEMAR PLUMBING CORP | 45 heads |
| 11/16/2021 | Signed-off | DEMAR PLUMBING CORP | 23 heads |
| 11/10/2021 | Signed-off | DEMAR PLUMBING CORP | — |
| 11/09/2021 | Signed-off | DEMAR PLUMBING CORP | 288 heads |
| 11/01/2021 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/14/2026 | — | — | Water/Sanitary |
| 08/06/2026 | Permit Issued | JUST PLBG & HTG INC | Water/Sanitary |
| 05/05/2025 | Permit Issued | DEMAR MECHANICAL INC | Water/Sanitary |
| 03/14/2025 | Permit Issued | DEMAR MECHANICAL INC | Water/Sanitary |
| 01/06/2025 | Signed-off | DEMAR MECHANICAL INC | Water/Sanitary |
| 01/04/2024 | Signed-off | DEMAR MECHANICAL INC | Water/Sanitary |
| 11/13/2023 | Signed-off | DEMAR MECHANICAL INC | Water/Sanitary |
| 11/10/2022 | Permit Issued | DEMAR MECHANICAL INC | Water/Sanitary |
| 07/27/2022 | Signed-off | DEMAR PLUMBING CORP | Water/Sanitary |
| 02/04/2022 | Signed-off | DEMAR MECHANICAL INC | Water/Sanitary |
| 12/16/2021 | Signed-off | DEMAR MECHANICAL INC | Water/Sanitary |
| 11/16/2021 | Signed-off | DEMAR PLUMBING CORP | Water/Sanitary |
| 11/09/2021 | Signed-off | DEMAR PLUMBING CORP | Water/Sanitary |
| 04/15/2021 | Signed-off | DEMAR PLUMBING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/08/2026 | Permit Issued | AMBER ELECTL CONTNG INC | General Wiring |
| 10/20/2025 | Permit Issued | COUNTY ELECL CONTRACTOR I | General Wiring |
| 04/02/2024 | Permit Issued | RE-CON ELECTRIC INC | General Wiring |
| 10/13/2023 | Permit Issued | OMD ELECTRICAL CORP | 1 meters, 1 new_meters |
| 01/02/2023 | Complete | JOROB CONTR'G & ELEC'L CO | 6 meters, 1 new_meters |
| 09/15/2022 | Complete | JUMPER ELECTRIC CORP | General Wiring |
| 02/03/2022 | Complete | CENTENNIAL ELEVATOR INDUS | General Wiring |
| 07/20/2021 | Complete | ILLUMINOUS ELECTRIC CORP. | — |
| 08/19/2020 | Permit Issued | ALL WAYS ELECTRIC CORP.W | General Wiring |
| 10/25/2019 | Permit Issued | RAMDEEN'S ELEC. CONTR.COR | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/24/2021 | Permit Issued | CANIDO BASONAS CONSTRUCTI | Scaffold |
| Owner | Filings | Most Recent |
|---|---|---|
| 1040 AVENUE OF THE AMERICAS | 355 | 09/13/2026 |
| 194 EAST SECOND STREET | 29 | 07/08/2026 |
| ROCK 54 | 141 | 07/08/2026 |
| J HILL ASSOCIATES | 37 | 07/08/2026 |
| PLATINUM SERVICES NY | 7 | 03/22/2026 |
| SKYLINE DEVELOPERS CONSTRUCTION | 4 | 03/22/2026 |
| CANIDO BASONAS CONST SVC | 2 | 03/22/2026 |
| WINOKER REALITY COMPANY | 37 | 03/22/2026 |
| MILLIKEN & CO. | 2 | 03/22/2026 |
| MILLKEN & CO | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| FUTURE MADE ARCHITECTURE, PLLC | 1 | 08/14/2026 |
| E4P CONSULTING ENGINEERING PLLC | 2 | 08/06/2026 |
| MG ENGINEERING D.P.C. | 51 | 03/01/2026 |
| ENV ARCHITECTS, DPC | 21 | 02/27/2026 |
| SEVERUD ASSOCIATES | 2 | 02/28/2024 |
| TANGEL ENGINEERING ASSOCIATES, PC | 2 | 01/03/2023 |
| MICHELS & WALDRON ASSOCIATES LLC | 1 | 01/03/2023 |
| THE SWITZER GROUP | 1 | 08/10/2022 |
| DESIMONE CONSULTING ENGINEERING | 1 | 07/08/2022 |
| ASIF JAMIL, RA | 1 | 08/24/2021 |
| ASHRAF CORP | 1 | 06/30/2021 |
| MIDTOWN PRESERVATION | 1 | 06/08/2021 |
| VINCENT J. LIOTTA P.E. | 1 | 03/16/2021 |
| LEON SKVIRSKY PE | 4 | 03/22/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| RETHY ASSOCIATES | 136 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 03/21/2026 |
| METROPOLIS GROUP INC | 20 | 03/21/2026 |
| VINCENT J. LIOTTA P.E. | 1 | 03/21/2026 |
| MIDTOWN PRESERVATION ARCHITECTURE | 2 | 03/21/2026 |
| BUILDING BROTHERS | 8 | 03/21/2026 |
| GREEN STUDIO | 2 | 03/21/2026 |
| VINCENT J. LIOTTA P. E. | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SKYLINE DEVELOPERS CONSTR | General Contractor | 84 | 07/08/2026 |
| DEMAR PLUMBING CORP | Fire Protection | 17 | 07/08/2026 |
| DEMAR MECHANICAL INC | Plumbing | 13 | 07/08/2026 |
| CANIDO BASONAS CONST SVC | General Contractor | 10 | 07/08/2026 |
| DEMAR PLUMBING CORP | Plumbing | 7 | 07/08/2026 |
| CANIDO BASONAS CONSTRUCTI | General Contractor | 6 | 03/21/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 6 | 03/21/2026 |
| SPK/LEWIS CONSTRUCTION LL | General Contractor | 5 | 07/08/2026 |
| CLASSIC USA CORP | General Contractor | 4 | 07/08/2026 |
| GOING SIGN SVCNG | Scaffold | 4 | 07/08/2026 |
| F.L. PINTO COMPANIES LLC | General Contractor | 3 | 03/21/2026 |
| AMOK INC | Fire Protection | 2 | 07/08/2026 |
| ROBERT SALINGER | Electrical | 2 | 03/21/2026 |
| GREGORY PUZZO | Electrical | 2 | 03/21/2026 |
| MOREAIR MECHANICAL SERVIC | General Contractor | 2 | 03/21/2026 |
| VIOLA, BARRY | Fire Protection | 1 | 03/21/2026 |
| GUSTAVE DILEO, JR. | Electrical | 1 | 03/21/2026 |
| JOROB CONTR'G & ELEC'L CO | Electrical | 1 | 03/22/2026 |
| PETROS DIMITRIADIS | Electrical | 1 | 03/21/2026 |
| PINOS, VICTOR | Electrical | 1 | 03/21/2026 |
| RAMDEEN, MARK | Electrical | 1 | 03/21/2026 |
| RE-CON ELECTRIC INC | Electrical | 1 | 03/22/2026 |
| SOTIRIOS STATHOPOULOS | Electrical | 1 | 03/21/2026 |
| AQUEDUCT MECHANICAL CORP | Fire Protection | 1 | 08/18/2026 |
| PSI PARTNERS, LLC | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| HT ENGINEERING, PLLC | 6274 | 2 | 08/06/2026 |
| COLE TECHNOLOGIES/CONTROL | 1290 | 59 | 03/01/2026 |
| AK ENGINEERING PC | 678 | 6 | 02/28/2024 |
| PSI AGENCY INC. | 254 | 3 | 01/03/2023 |
| DESIMONE CONSULTING ENGIN | 5942 | 1 | 07/08/2022 |
| VINCENT J. LIOTTA P. E. | 1974 | 1 | 03/16/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | JUST PLBG & HTG INC | 08/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | AQUEDUCT MECHANICAL CORP | 08/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | DEMAR PLUMBING CORP | 05/14/2026 |
| DOB NOW | Mechanical Systems | Signed-off | SKYLINE DEVELOPERS CONSTR | 03/09/2026 |
| DOB NOW | General Construction | Signed-off | SKYLINE DEVELOPERS CONSTR | 03/06/2026 |
| DOB NOW | Plumbing | Permit Issued | DEMAR MECHANICAL INC | 04/30/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SKYLINE DEVELOPERS CONSTR | 04/10/2025 |
| DOB NOW | General Construction | Permit Issued | SKYLINE DEVELOPERS CONSTR | 04/10/2025 |
| DOB NOW | Sprinklers | Signed-off | DEMAR MECHANICAL INC | 03/07/2025 |
| DOB NOW | Plumbing | Permit Issued | DEMAR MECHANICAL INC | 02/24/2025 |
| DOB NOW | Plumbing | Permit Issued | DEMAR PLUMBING CORP | 02/21/2025 |
| DOB NOW | Plumbing | Signed-off | DEMAR MECHANICAL INC | 02/18/2025 |
| DOB NOW | Sprinklers | Signed-off | DEMAR PLUMBING CORP | 02/14/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SKYLINE DEVELOPERS CONSTR | 02/10/2025 |
| DOB NOW | General Construction | Signed-off | SKYLINE DEVELOPERS CONSTR | 02/10/2025 |
| DOB NOW | General Construction | Signed-off | SKYLINE DEVELOPERS CONSTR | 01/08/2025 |
| DOB NOW | General Construction | Permit Issued | SKYLINE DEVELOPERS CONSTR | 01/08/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SKYLINE DEVELOPERS CONSTR | 01/08/2025 |
| DOB NOW | General Construction | Signed-off | SKYLINE DEVELOPERS CONSTR | 01/06/2025 |
| DOB NOW | Sprinklers | Permit Issued | DEMAR MECHANICAL INC | 12/24/2024 |
| DOB NOW | Plumbing | Permit Issued | DEMAR PLUMBING CORP | 12/24/2024 |
| DOB NOW | Sprinklers | Permit Issued | DEMAR PLUMBING CORP | 09/11/2024 |
| DOB NOW | Sprinklers | Permit Issued | DEMAR PLUMBING CORP | 09/11/2024 |
| DOB NOW | General Construction | Permit Issued | SKYLINE DEVELOPERS CONSTR | 08/30/2024 |
| DOB NOW | General Construction | Signed-off | SKYLINE DEVELOPERS CONSTR | 08/30/2024 |
| DOB NOW | General Construction | Permit Issued | SKYLINE DEVELOPERS CONSTR | 02/28/2024 |
| DOB NOW | Plumbing | Signed-off | DEMAR MECHANICAL INC | 02/27/2024 |
| DOB NOW | Sprinklers | Signed-off | DEMAR PLUMBING CORP | 02/27/2024 |
| DOB NOW | Mechanical Systems | Signed-off | SKYLINE DEVELOPERS CONSTR | 02/26/2024 |
| DOB NOW | Mechanical Systems | Signed-off | SKYLINE DEVELOPERS CONSTR | 01/09/2024 |
| DOB NOW | Plumbing | Signed-off | DEMAR PLUMBING CORP | 01/05/2024 |
| DOB NOW | Sprinklers | Signed-off | DEMAR MECHANICAL INC | 01/05/2024 |
| DOB NOW | General Construction | Permit Issued | SKYLINE DEVELOPERS CONSTR | 01/04/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | SKYLINE DEVELOPERS CONSTR | 11/29/2023 |
| DOB NOW | Plumbing | Signed-off | DEMAR MECHANICAL INC | 11/16/2023 |
| DOB NOW | Plumbing | Permit Issued | DEMAR PLUMBING CORP | 11/15/2023 |
| DOB NOW | General Construction | Permit Issued | SKYLINE DEVELOPERS CONSTR | 11/15/2023 |
| DOB NOW | Plumbing | Permit Issued | DEMAR MECHANICAL INC | 04/04/2023 |
| DOB NOW | Structural | Signed-off | SPK/LEWIS CONSTRUCTION LL | 03/02/2023 |
| DOB NOW | Sprinklers | Signed-off | AMOK INC | 01/12/2023 |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/09/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/28/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/12/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/21/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/19/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/16/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/11/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/10/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/14/2025 | Pass-Final PL - Underground | Pass | View ↗ |
| 07/01/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/25/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/25/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 06/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/19/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/19/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 05/13/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/13/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/13/2025 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 04/03/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/31/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/31/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/31/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/24/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/13/2026 | Interior lighting power | — | energy_progress |
| 08/13/2026 | Lighting controls | — | energy_progress |
| 08/13/2026 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 08/13/2026 | Energy Code Compliance Inspections | — | progress |
| 08/13/2026 | Fenestration air leakage | — | energy_progress |
| 08/04/2026 | HVAC-R and service water heating system controls | HENRY TORRES | energy_progress |
| 08/04/2026 | HVAC-R and service water heating equipment | HENRY TORRES | energy_progress |
| 08/04/2026 | HVAC-R and service water piping design and insulation | HENRY TORRES | energy_progress |
| 08/04/2026 | Energy Code Compliance Inspections | HENRY TORRES | progress |
| 08/04/2026 | Maintenance information | HENRY TORRES | energy_progress |
| 07/28/2026 | Sprinkler Systems | HENRY TORRES | special |
| 07/28/2026 | Fire-Resistant Penetrations and Joints | HENRY TORRES | special |
| 07/28/2026 | Post-installed Anchors | HENRY TORRES | special |
| 07/08/2026 | Fire-Resistant Penetrations and Joints | HENRY TORRES | special |
| 03/04/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/04/2026 | Fire-Resistance Rated Construction | — | progress |
| 03/04/2026 | Final | — | progress |
| 02/05/2026 | Post-installed Anchors | GEORGE ANDERSEN | special |
| 02/05/2026 | Energy Code Compliance Inspections | GEORGE ANDERSEN | progress |
| 02/05/2026 | Duct leakage testing, insulation and design | GEORGE ANDERSEN | energy_progress |
| 02/05/2026 | Lighting controls | GEORGE ANDERSEN | energy_progress |
| 02/05/2026 | Final | GEORGE ANDERSEN | progress |
| 02/05/2026 | Fire-Resistant Penetrations and Joints | GEORGE ANDERSEN | special |
| 02/05/2026 | Sprinkler Systems | GEORGE ANDERSEN | special |
| 02/05/2026 | Post-installed Anchors | GEORGE ANDERSEN | special |