← Back
Four families
1040 LONGFELLOW AVENUE
BRONX · BIN 2006262
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R7-1Zoning
3,200 sfGross Floor Area
4Units
Rent Stabilized158 Open Violations ▸
Four families · Owner of record: 1040 LONGFELLOW LLC · 2,500 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Floor 224p · 1 filing · 20 docs
Floor 124p · 1 filing · 20 docs
Cellar3p · 1 filing · 6 docs
Basement27p · 1 filing · 20 docs
1 job · most recent 06/08/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/08/2026Signed-off1 ALEXANDERS GROUP INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXS12LVJU 60,000 BTU · Heat Pump Outdoor ×5
2MXS18NMVJUA 72,000 BTU · Heat Pump Outdoor ×4
Ventilation
Nutone AEN110 110 CFM ×10
QTXEN150 150 CFM · Exhaust Fan ×10
3 jobs · most recent 06/08/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/08/2026Signed-offHORBRIDGE PLUMBING & HEATWater/Sanitary
11/23/2020Permit IssuedZONE PLUMBING & HEATING CGas, Water/Sanitary
———Gas, Water/Sanitary
3 jobs · most recent 12/27/2025
General Wiring
FiledStatusContractorScope
12/27/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
06/25/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
05/22/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 job · most recent 06/08/2026
Wood
FiledStatusContractorScope
06/08/2026Signed-off1 ALEXANDERS GROUP INCWood
Building Lifecycle
All (142)Filed (13)Permit Issued (7)Signed Off (4)Violation (60)Inspection (12)Objection (16)Special Inspection (30)
06/24/2026
Special inspection requirement — Air barrier - visual inspection
RAFI HAMID
06/24/2026
Special inspection requirement — Metering
RAFI HAMID
06/24/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
RAFI HAMID
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFI HAMID
06/24/2026
Special inspection requirement — Maintenance information
RAFI HAMID
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
06/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
RAFI HAMID
06/24/2026
Special inspection requirement — Interior lighting power
RAFI HAMID
06/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
RAFI HAMID
06/24/2026
Special inspection requirement — Fenestration areas
RAFI HAMID
06/24/2026
Special inspection requirement — Permanent certificate
RAFI HAMID
06/24/2026
Special inspection requirement — Insulation placement and R values
RAFI HAMID
06/24/2026
Special inspection requirement — Fenestration air leakage
RAFI HAMID
06/20/2026
Violation issued (HPD, open)
B
06/08/2026
Filed — Alteration CO
Filing SP application subsequent to the primary approved application X01097618-I1
X01097618-P6
06/04/2026
Special inspection requirement — Insulation placement and R values
RAFI HAMID
06/04/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
RAFI HAMID
06/04/2026
Special inspection requirement — Metering
RAFI HAMID
06/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
RAFI HAMID
06/04/2026
Special inspection requirement — Air barrier - visual inspection
RAFI HAMID
06/04/2026
Special inspection requirement — Maintenance information
RAFI HAMID
06/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
RAFI HAMID
06/04/2026
Special inspection requirement — Interior lighting power
RAFI HAMID
06/04/2026
Special inspection requirement — Permanent certificate
RAFI HAMID
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
06/04/2026
Special inspection requirement — Fenestration air leakage
RAFI HAMID
06/04/2026
Special inspection requirement — Fenestration areas
RAFI HAMID
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFI HAMID
04/22/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/09/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/12/2026
Filed — Alteration CO
Filing SP application subsequent to the primary approved application X01097618-I1
X01097618-P5
03/12/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
RAFI HAMID
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFI HAMID
03/12/2026
Special inspection requirement — Metering
RAFI HAMID
03/12/2026
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
01/31/2026
Violation issued (HPD, open)
C
01/31/2026
Violation issued (HPD, closed)
C
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/30/2025
Signed off — Alteration CO
Filing SP application subsequent to the primary approved application X01097618-I1
X01097618-S4
07/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/03/2025
Signed off — Alteration CO
Filing SP application subsequent to the primary approved application X01097618-I1
X01097618-S3
07/03/2025
Signed off — Alteration CO
Filing SP application subsequent to the primary approved application X01097618-I1
X01097618-S1
07/03/2025
Signed off — Alteration CO
Filing SP application subsequent to the primary approved application X01097618-I1
X01097618-S2
06/18/2025
Filed — Alteration CO
Filing SP application subsequent to the primary approved application X01097618-I1
X01097618-P4
06/05/2025
Violation issued (HPD, closed)
A
05/27/2025
Filed — Alteration CO
Filing SP application subsequent to the primary approved application X01097618-I1
X01097618-P3
05/27/2025
Permit issued — Structural
X01097618-S1-ST
05/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2025
Filed — Alteration CO
Filing SP application subsequent to the primary approved application X01097618-I1
X01097618-S1
05/06/2025
Filed — Alteration CO
Filing SP application subsequent to the primary approved application X01097618-I1
X01097618-P2
04/24/2025
Filed — Alteration CO
Filing SP application subsequent to the primary approved application X01097618-I1
X01097618-P1
02/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2025
Permit issued — Plumbing
X01097618-S3-PL
01/22/2025
Permit issued — Sprinklers
X01097618-S4-EW-SP
12/17/2024
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
12/17/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
Latest 60 of 142 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SR EQUITIES1709/13/2026
0WNERS REP507/08/2026
1040 LONGFELLOW LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/10/2024$1.1M—Private party → 1040 LONGFELLOW LLC$344/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES906/08/2026
AG ENGINEERING PLLC105/06/2025
VASILIOS ARTEMIOU PE110/29/2024
N Y ARCHITECTS INC.211/23/2020
RICHARD DELUCIA, ARCHITECT1—
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
1 ALEXANDERS GROUP INCGeneral Contractor903/21/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
DOUG'S PLBG & HTG SERV COPlumbing107/08/2026
DYNAMIC PLBNG SPRKR CORPlumbing103/22/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYED ENGINEERING, P.C.70541106/08/2026
AA BUILDING & INSPECTION1519105/06/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-off1 ALEXANDERS GROUP INC05/27/2025
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT01/27/2025
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL01/22/2025
DOB NOWGeneral ConstructionPermit Issued1 ALEXANDERS GROUP INC12/11/2024
DOB NOWMechanical SystemsSigned-off1 ALEXANDERS GROUP INC12/11/2024
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C03/07/2022
DOB NOWPlumbingPermit IssuedDOUG'S PLBG & HTG SERV CO08/24/2020
BISOTISSUEDJ.M.C. CONTRACTING CORP12/31/2021
BISOTISSUEDJ.M.C. CONTRACTING CORP11/15/2021
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/22/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/09/2026Fail-Final CND-Occupancy InspectionFailView ↗
07/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
12/17/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/11/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
06/24/2026Fire-Resistance Rated ConstructionRAFI HAMIDprogress
06/24/2026Fenestration air leakageRAFI HAMIDenergy_progress
06/24/2026Maintenance informationRAFI HAMIDenergy_progress
06/24/2026Insulation placement and R valuesRAFI HAMIDenergy_progress
06/24/2026MeteringRAFI HAMIDenergy_progress
06/24/2026Permanent certificateRAFI HAMIDenergy_progress
06/24/2026Fenestration and door U-factor and product ratingsRAFI HAMIDenergy_progress
06/24/2026Fenestration areasRAFI HAMIDenergy_progress
06/24/2026Air barrier - visual inspectionRAFI HAMIDenergy_progress
06/24/2026Interior lighting powerRAFI HAMIDenergy_progress
06/24/2026Exterior Insulation and Finish Systems (EIFS)RAFI HAMIDspecial
06/24/2026Fire-Resistant Penetrations and JointsRAFI HAMIDspecial
06/24/2026Energy Code Compliance InspectionsRAFI HAMIDprogress
06/04/2026MeteringRAFI HAMIDenergy_progress
06/04/2026Insulation placement and R valuesRAFI HAMIDenergy_progress
06/04/2026Fenestration areasRAFI HAMIDenergy_progress
06/04/2026Fenestration air leakageRAFI HAMIDenergy_progress
06/04/2026Permanent certificateRAFI HAMIDenergy_progress
06/04/2026Interior lighting powerRAFI HAMIDenergy_progress
06/04/2026Exterior Insulation and Finish Systems (EIFS)RAFI HAMIDspecial
06/04/2026Fire-Resistant Penetrations and JointsRAFI HAMIDspecial
06/04/2026Energy Code Compliance InspectionsRAFI HAMIDprogress
06/04/2026Fire-Resistance Rated ConstructionRAFI HAMIDprogress
06/04/2026Maintenance informationRAFI HAMIDenergy_progress
06/04/2026Air barrier - visual inspectionRAFI HAMIDenergy_progress
Latest 25 of 89.
▾Documents — 161 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch11
08/20/2026X01097618-P2Contact architect ↗
08/20/2026X01097618-P1Contact architect ↗
08/20/2026X01097618-S4Contact architect ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/26/2026X00437541-I1Contact architect ↗
08/25/2026X00380609-I1Contact architect ↗
08/15/2026X00380609-P1Contact architect ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION8
11/03/2025240296666Open ↗
09/30/2025240296666Open ↗
09/16/2025240296666Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION1
11/15/2021240296666Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/13/2026X01097618-P4Open ↗
08/13/2026X01097618-P2Open ↗
08/13/2026X01097618-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications106
▸DOB NOWProgress Inspector Seal & Signature69
09/29/2026X01097618-S1Open ↗
09/29/2026X01097618-S1Open ↗
08/30/2026X01097618-S3Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/29/2026X01097618-S1Open ↗
09/29/2026X01097618-S1Open ↗
08/30/2026X01097618-S3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026X00437541-I1Open ↗
08/25/2026X00380609-I1Open ↗
08/25/2026X00380609-P1Open ↗
Showing 3 of 14 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/15/2020240296666Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/15/2020240296666Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/15/2020240296666Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/26/2026X00437541-I1Open ↗
08/25/2026X00380609-I1Open ↗
08/25/2026X00380609-P1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/15/2020240296666Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/15/2020240296666Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/03/2021240296666Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/03/2021240296666Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/15/2020240296666Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
12/15/2020240296666Open ↗
▸BISADDITIONAL INFORMATION1
09/14/2021240296666Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification5
08/20/2026X01097618-P2Open ↗
08/20/2026X01097618-I1Open ↗
08/20/2026X01097618-P4Open ↗
Showing 3 of 5 on file for this type
▸BISSupporting Document: Fee Deferment1
11/15/2021240296666Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01097618-I1Open ↗