← Back
Two family converted from one family
10402 215 STREET
QUEENS · BIN 4239141
💬 Discuss this project
1935Year Built
2Stories
B3Building Class
R3-2Zoning
2,398 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 210p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VARG CONSTRUCTION1407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/19/2024$1.4M—— → —$563/sf building
05/19/2023$483K—THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A. AS → 11136 LEFFERTS BLVD LLC$201/sf building
03/01/2023$496K—— → —$207/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.812/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor1007/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781612/22/2023
TRIANGLE INSPECTION & TES7495212/22/2023
Building Lifecycle
All (60)Filed (8)Permit Issued (5)Signed Off (4)Violation (1)Inspection (8)Objection (4)Special Inspection (30)
07/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/26/2024
Signed off — Alteration CO
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00896369-I1
Q00896369-S1
01/25/2024
Signed off — Alteration CO
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00896369-I1
Q00896369-S2
01/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/17/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT APPLICATION TO BE FILED. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00883324-I1
01/17/2024
Special inspection requirement — Masonry
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
01/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Metering
CHRISTIAN LOZADA
01/17/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
01/11/2024
Signed off — Alteration CO
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00896369-I1
Q00896369-S3
01/10/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/26/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/22/2023
Filed — Alteration CO
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00896369-I1
Q00896369-P3
12/22/2023
Filed — Alteration CO
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00896369-I1
Q00896369-P2
12/22/2023
Filed — Alteration CO
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00896369-I1
Q00896369-P1
12/01/2023
Permit issued — Curb Cut
Q00896369-S3-CC
11/29/2023
Violation issued (HPD, closed)
I
10/23/2023
Permit issued — Mechanical Systems
Q00896369-S2-MS
10/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/20/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/20/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/18/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/10/2023
Permit issued — Plumbing
Q00896369-S1-PL
10/02/2023
Objection resolved — Addressed
09/19/2023
Permit issued — General Construction
Q00896369-I1-GC-CX
09/19/2023
Objection raised — Scope
09/14/2023
Filed — Alteration CO
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00896369-I1
Q00896369-S1
09/14/2023
Filed — Alteration CO
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00896369-I1
Q00896369-S2
09/14/2023
Filed — Alteration CO
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00896369-I1
Q00896369-S3
09/14/2023
Objection resolved — Addressed
08/01/2023
Objection raised — Accessibility
07/18/2023
Filed — Alteration CO
FILED HEREWITH MECHANICAL WORK TYPE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00896369-I1
Q00896369-I1
06/22/2023
Permit issued — Construction Fence
Q00883324-I1-FN
06/07/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT APPLICATION TO BE FILED. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00883324-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJ&J DESIGNS INC12/01/2023
DOB NOWMechanical SystemsSigned-offJ&J DESIGNS INC10/23/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR10/10/2023
DOB NOWGeneral ConstructionPermit IssuedJ&J DESIGNS INC09/19/2023
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC06/22/2023
1 project · most recent 12/22/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/22/2023Signed-offJ&J DESIGNS INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman GSXN3N3610AA 36,000 BTU · Condensing Unit ×2
GSXN3N6010AA 60,000 BTU · Condensing Unit ×2
Heating
Goodman GM9S800603BN 60,000 BTU · Furnace ×2
GM9S921005CN 100,000 BTU · Furnace ×2
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×10
Delta Breeze SMT150 150 CFM · Exhaust Fan ×4
1 project · most recent 12/22/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/22/2023Signed-offINFINITI ESC PLUMBING CORGas, Storm, Water/Sanitary
1 project · most recent 10/18/2023
General Wiring
FiledStatusContractorScope
10/18/2023CompleteAYYUB ELECTRIC CORPGeneral Wiring
1 project · most recent 12/22/2023
Steel Wood
FiledStatusContractorScope
12/22/2023Signed-offJ&J DESIGNS INCSteel, Wood
1 project · most recent 12/22/2023
Earthwork
FiledStatusContractorScope
12/22/2023Signed-offJ&J DESIGNS INCEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/10/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
12/26/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
10/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/20/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/20/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
01/17/2024Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
01/17/2024Excavations - Sheeting, Shoring, and BracingCHRISTIAN LOZADAspecial
01/17/2024Structural Wood FrameCHRISTIAN LOZADAprogress
01/17/2024FinalCHRISTIAN LOZADAprogress
01/17/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
01/17/2024Footing and FoundationCHRISTIAN LOZADAprogress
01/17/2024Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
01/17/2024Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
01/17/2024Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
01/17/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
01/17/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
01/17/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
01/17/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
01/17/2024Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
01/17/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
01/17/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
01/17/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
01/17/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
01/17/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
01/17/2024MeteringCHRISTIAN LOZADAenergy_progress
01/17/2024MasonryCHRISTIAN LOZADAspecial
01/17/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
01/17/2024Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
01/17/2024Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
01/17/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
Latest 25 of 97.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q00883324-I1Request digital key ↗
08/24/2026Q00896369-S1Request digital key ↗
08/24/2026Q00896369-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00896369-I1Open ↗
08/13/2026Q00896369-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00896369-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026Q00896369-P1Open ↗
09/19/2026Q00896369-P3Open ↗
09/19/2026Q00896369-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026Q00896369-P1Open ↗
09/23/2026Q00896369-P1Open ↗
09/19/2026Q00896369-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q00883324-I1Open ↗
08/24/2026Q00896369-I1Open ↗
08/24/2026Q00896369-S1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00896369-P1Open ↗
08/13/2026Q00896369-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q00896369-S1Open ↗
08/24/2026Q00896369-I1Open ↗
08/24/2026Q00896369-P3Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q00896369-I1Open ↗
08/13/2026Q00896369-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00896369-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/13/2026Q00896369-P1Open ↗
08/13/2026Q00896369-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00896369-I1Open ↗
08/13/2026Q00896369-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00896369-P1Open ↗
08/13/2026Q00896369-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/24/2026Q00896369-I1Open ↗
08/24/2026Q00896369-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00896369-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00896369-I1Open ↗