← Back
BuildNYC
Elevator cooperative
Chatterton
1041 PUGSLEY AVENUE · Castle Hill-Unionport · BIN 2025666
💬 Discuss this project
1963Year Built
15Stories
D4Building Class
R5Zoning
151,155 sfGross Floor Area
133Units
LL97 CoveredRent Stabilized8 Active Violations 6 unresolved · 2 paperwork only 2 likely answered 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · 56,975 sf lot · 2.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsPipe scaffold installation1 filing
Site & exteriorHeavy duty sidewalk shed installation2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Chatterton Terrace1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Scalar Architecture203/03/2020
Dooling & Company Architects111/20/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold2810/04/2026
Star Electrical ContractorsElectrical103/21/2026
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
04/05/2026
Boiler inspection report filed
Initial · no defects · Accepted
11/07/2025
Elevator Category 1 inspection report filed
06/05/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
06/03/2025
Boiler inspection report filed
Initial · no defects · Accepted
117 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/02/2022
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding03/16/2021
DOB NOWConstruction FenceSigned-offSpring Scaffolding03/04/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/03/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/15/2020
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding03/03/2020
DOB NOWConstruction FenceSigned-offSpring Scaffolding03/02/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding01/06/2020
DOB NOWConstruction FenceSigned-offSpring Scaffolding12/16/2019
DOB NOWConstruction FenceSigned-offSpring Scaffolding10/22/2019
DOB NOWSidewalk ShedSigned-offFine Mechanical12/27/2018
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/27/2018
DOB NOWConstruction FenceSigned-offSpring Scaffolding11/21/2018
DOB NOWSidewalk ShedSigned-offSpring Scaffolding11/20/2018
BISOTISSUEDQuality Building Constrution05/16/2022
BISOTISSUEDQuality Building Constrution07/30/2020
BISOTISSUEDQuality Building Constrution03/24/2020
BISEQISSUEDAdvanced Installations01/02/2007
BISOTISSUEDBellet Construction Co09/18/2006
BISOTISSUEDBarth Electrical Contractos01/30/2001
BISPLISSUEDSharp Plumbing07/29/1999
BISPLISSUEDJCC Construction07/12/1999
BISOTISSUEDLO Sardo General Contractors07/12/1999
BISOTISSUEDKullman Industries07/12/1999
BISFSISSUEDC C Controlled Combustion01/20/1999
BISPLISSUEDG.bassolino Plumbing12/07/1998
BISOTISSUEDC C Controlled Combustion12/07/1998
BISEQISSUEDProto Construction04/29/1993
BISOTISSUEDCentre Fence Co12/03/1991
1 project · most recent 11/14/2018
FiledStatusContractorScope
11/14/2018CompleteTop Shelf Electric—
Nothing on file for this building.
33 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account