BuildNYC
Elevator apt, semi-fireproof with stores
Prosper Brooklyn
1042 ATLANTIC AVENUE · BIN 3429784
💬 Discuss this project
2024Year Built
17Stories
D7Building Class
C6-3AZoning
206,692 sfGross Floor Area
238Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: Emp Atlantic Property Owner · 24,000 sf lot · 8.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsUnder Construction2 filings
RoofSidewalk shed4p · 2 filings
Floor 19Sidewalk shed1p · 1 filing
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9EMP Capital2p · 1 filing
Floor 8
Floor 7Unit 7C
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2EMP Capital2p · 1 filing
Floor 1EMP Capital3p · 1 filing
CellarEMP Capital2p · 2 filings
Site & exteriorHeavy duty sidewalk shed installationUnder Construction8 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Emp Atlantic Property Owner103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Associates1104/01/2026
Tohfaz Uddin PE1801/16/2026
Issac & Stern Architects2012/03/2025
Amal Hassan Hassan208/21/2025
KSK Construction Group106/25/2025
KZ Engineering105/22/2024
Ashraf105/09/2023
Richard Wainer Architect105/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design803/21/2026
Synergy Building Consultants803/21/2026
Green Studio203/21/2026
Advanced Builders Services3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Precision Hoist & Scaffo*Scaffold3207/08/2026
Countywide BuildersGeneral Contractor2907/08/2026
The Big ICFire Protection1010/04/2026
Countywide BuildersScaffold607/08/2026
Kings County ServicesGeneral Contractor407/08/2026
Prime Piping & HeatingPlumbing307/08/2026
Nash Electric ServicesElectrical203/22/2026
Kings County ServicesScaffold107/08/2026
Platinum Services NYScaffold107/08/2026
Big ICGeneral Contractor103/21/2026
Denali ElectricElectrical103/21/2026
Wachnachter PeterGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma91682904/01/2026
Urban Integrations7993208/21/2025
Tohfaz Uddin P.E2001608/01/2025
Big Apple Group NY1258206/25/2025
KZ Engineering4665105/22/2024
Building Lifecycle
All (245)Filed (53)Permit Issued (62)Signed Off (12)Violation (46)Inspection (23)Objection (16)Special Inspection (30)Tax Incentive (3)
06/15/2027
421-a(16) construction completed
10/15/2026
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01017355-I1
10/15/2026
Signed off — New Building
Proposed nineteen (19) story + cellar mixed-use building. (Cellar, 001-017 construction floors, 18C/PT1M, 19C/PT2M).
B00715375-S5
06/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
06/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
06/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
06/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
06/13/2026
Special inspection requirement — Maintenance information
Soorjbally Harilall
06/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
06/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
06/04/2026
Objection resolved — Addressed
04/26/2026
Objection raised — Other
04/17/2026
Objection resolved — Addressed
04/15/2026
Objection raised — Other
04/01/2026
Filed — New Building
Proposed nineteen (19) story + cellar mixed-use building. (Cellar, 001-017 construction floors, 18C/PT1M, 19C/PT2M).
B00715375-B7
03/31/2026
Signed off — New Building
Proposed nineteen (19) story + cellar mixed-use building. (Cellar, 001-017 construction floors, 18C/PT1M, 19C/PT2M).
B00715375-Z1
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
03/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
03/31/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
03/31/2026
Special inspection requirement — Maintenance information
Soorjbally Harilall
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
03/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
03/27/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/12/2026
Permit issued — Sidewalk Shed
B01017350-I1-SH
03/12/2026
Permit issued — Supported Scaffold
B01017353-I1-SF
03/12/2026
Permit issued — Construction Fence
B01017355-I1-FN
03/11/2026
Permit issued — Standpipe
B00715375-S7-EW-SP
03/10/2026
Permit issued — Sprinklers
B00715375-S7-EW-SD
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
03/10/2026
Violation issued (FDNY_ORDER, closed)
02/12/2026
Permit issued — Curb Cut
B00715375-Z1-CC
02/08/2026
Violation issued (ECB, closed)
Construction
01/24/2026
Permit issued — Plumbing
B00715375-S3-PL
01/20/2026
Signed off — New Building
Proposed nineteen (19) story + cellar mixed-use building. (Cellar, 001-017 construction floors, 18C/PT1M, 19C/PT2M).
B00715375-S2
01/16/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01017353-P5
01/16/2026
Permit issued — General Construction
B00715375-I1-GC
01/05/2026
Signed off — Alteration
B01268873-I1
12/30/2025
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01017353-P4
12/29/2025
Signed off — Alteration
Installation of a suspended scaffold for facade inspection only as per plan submitted.
B01256205-I1
12/23/2025
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
12/23/2025
Special inspection requirement — Lighting controls
Soorjbally Harilall
12/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
12/23/2025
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
12/23/2025
Special inspection requirement — Metering
Soorjbally Harilall
12/23/2025
Special inspection requirement — Vestibules
Soorjbally Harilall
12/23/2025
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
12/23/2025
Special inspection requirement — Air barrier continuity plan testing
Soorjbally Harilall
12/23/2025
Special inspection requirement — Fenestration areas
Soorjbally Harilall
12/23/2025
Special inspection requirement — Interior lighting power
Soorjbally Harilall
12/23/2025
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
12/23/2025
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
12/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
Latest 60 of 245 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPrecision Hoist & Scaffo*03/12/2026
DOB NOWSupported ScaffoldPermit IssuedPrecision Hoist & Scaffo*03/12/2026
DOB NOWConstruction FenceSigned-offPrecision Hoist & Scaffo*03/12/2026
DOB NOWSprinklersPermit IssuedThe Big IC03/11/2026
DOB NOWStandpipePermit IssuedThe Big IC03/10/2026
DOB NOWCurb CutSigned-offCountywide Builders02/12/2026
DOB NOWPlumbingPermit IssuedPrime Piping & Heating01/24/2026
DOB NOWGeneral ConstructionPermit IssuedCountywide Builders01/16/2026
DOB NOWSuspended ScaffoldSigned-offPrecision Hoist & Scaffo*10/28/2025
DOB NOWSuspended ScaffoldSigned-offPrecision Hoist & Scaffol08/19/2025
DOB NOWSprinklersPermit IssuedThe Big IC06/16/2025
DOB NOWStandpipePermit IssuedThe Big IC06/12/2025
DOB NOWGeneral ConstructionPermit IssuedCountywide Builders05/20/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPrecision Hoist & Scaffo*04/15/2025
DOB NOWStandpipeSigned-offThe Big IC04/09/2025
DOB NOWConstruction FenceSigned-offCountywide Builders04/01/2025
DOB NOWConstruction FenceSigned-offPrecision Hoist & Scaffo*03/13/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPrecision Hoist & Scaffo*03/13/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPrecision Hoist & Scaffo*03/12/2025
DOB NOWSupported ScaffoldPermit IssuedPrecision Hoist & Scaffo*03/12/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPrecision Hoist & Scaffo*03/12/2025
DOB NOWSidewalk ShedPermit IssuedPrecision Hoist & Scaffo*03/12/2025
DOB NOWMechanical SystemsPermit IssuedCountywide Builders02/18/2025
DOB NOWStructuralPermit IssuedCountywide Builders01/07/2025
DOB NOWGeneral ConstructionPermit IssuedCountywide Builders01/07/2025
DOB NOWPlumbingPermit IssuedPrime Piping & Heating01/02/2025
DOB NOWStandpipePermit IssuedThe Big IC12/31/2024
DOB NOWFoundationSigned-offCountywide Builders09/03/2024
DOB NOWStructuralPermit IssuedCountywide Builders09/03/2024
DOB NOWSupport of ExcavationSigned-offCountywide Builders08/28/2024
DOB NOWFoundationSigned-offCountywide Builders08/28/2024
DOB NOWGeneral ConstructionPermit IssuedCountywide Builders08/08/2024
DOB NOWSuspended ScaffoldSigned-offPrecision Hoist & Scaffo*06/26/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedPrecision Hoist & Scaffo*04/12/2024
DOB NOWStandpipeSigned-offThe Big IC04/09/2024
DOB NOWStandpipePermit IssuedThe Big IC04/09/2024
DOB NOWSprinklersPermit IssuedThe Big IC04/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offPrecision Hoist & Scaffo*04/03/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedPrecision Hoist & Scaffo*03/14/2024
DOB NOWSidewalk ShedPermit IssuedPrecision Hoist & Scaffo*03/13/2024
+ 14 more permits on file
1 project · most recent 04/01/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/01/2026Signed-offCountywide BuildersAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Daikin RK12NMVJU. 10,900 BTU · Condensing Unit ×4
Heat / Cool
Daikin RXTQ36TBVJUA 36,000 BTU · Vrf Outdoor ×34
REYQ144XATJB 144,000 BTU · Vrf Outdoor ×23
REYQ120XATJB 120,000 BTU · Vrf Outdoor ×14
REYQ96XATJB. 96,000 BTU · Vrf Outdoor ×5
REYQ168XATJB 164,000 BTU · Vrf Outdoor ×3
RXYQ144AATJA 144,000 BTU · Vrf Outdoor ×2
RXTQ48TBVJUA 48,000 BTU · Vrf Outdoor ×1
RXYQ120AATJA 120,000 BTU · Vrf Outdoor ×1
RXYQ168AATJA 168,000 BTU · Vrf Outdoor ×1
RXYQ192AATJA. 192,000 BTU · Vrf Outdoor ×1
RXYYQ96AATJA 96,000 BTU · Vrf Outdoor ×1
Lg ARUN024GSS4 24,000 BTU · Vrf Outdoor ×1
ARUN048GSS4 48,000 BTU · Vrf Outdoor ×1
Ventilation
Renewaire HE1XINH 800 CFM · Erv ×3
Lg U-ERV-1800 1,450 CFM · Erv ×1
U-ERV-600 690 CFM · Erv ×1
1 project · most recent 04/01/2026
Sprinkler System
FiledStatusContractorScope
04/01/2026Permit IssuedThe Big ICSprinkler System
1 project · most recent 04/01/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/01/2026Permit IssuedPrime Piping & HeatingGas, Storm, Water/Sanitary
10 projects · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026CompleteCounty Electrical Contractor IGeneral Wiring
01/08/2026CompleteDenali Electric—
09/06/2024Permit IssuedDenali Electric—
06/18/2024Permit IssuedStar Electrical Contractors—
03/19/2024CompleteCounty Electrical Contractor I—
03/18/2024CompleteCounty Electrical Contractor I1 meters
03/14/2024Permit IssuedNash Electric Services—
03/14/2024Permit IssuedNash Electric Services—
03/14/2024Permit IssuedNash Electric Services—
05/02/2023CompleteIlluminous ElectricGeneral Wiring
1 project · most recent 04/01/2026
Concrete
FiledStatusContractorScope
04/01/2026Permit IssuedThe Big ICConcrete
4 projects · most recent 04/01/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
04/01/2026Permit IssuedThe Big ICFence
01/16/2026Permit IssuedPrecision Hoist & Scaffo*Scaffold
05/07/2025Permit IssuedPrecision Hoist & Scaffo*Sidewalk Shed
03/12/2024Signed-offPrecision Hoist & Scaffo*Fence
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
03/27/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
11/13/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
07/29/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
07/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/30/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
06/17/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/17/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/10/2025Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
06/10/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/29/2025Fail-Final CND-Occupancy InspectionFailView ↗
04/21/2025Fail-Final CND-Occupancy InspectionFailView ↗
08/30/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
08/01/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/21/2024Pass-Final PL - UndergroundPassView ↗
06/03/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
06/03/2024Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
05/15/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/15/2024Certified StandPipe - SD - Fire StandPipe - SD - RoughingCertifiedView ↗
05/15/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
02/21/2024Pass-Final PL - UndergroundPassView ↗
02/08/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/13/2026Maintenance informationSoorjbally Harilallenergy_progress
06/13/2026Energy Code Compliance InspectionsSoorjbally Harilallprogress
06/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
06/13/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
06/13/2026HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
06/13/2026HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
06/13/2026HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
03/31/2026Maintenance informationSoorjbally Harilallenergy_progress
03/31/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
03/31/2026HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
03/31/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
03/31/2026HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
03/31/2026HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
03/31/2026Energy Code Compliance InspectionsSoorjbally Harilallprogress
12/23/2025MeteringSoorjbally Harilallenergy_progress
12/23/2025Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
12/23/2025Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
12/23/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
12/23/2025Wall Panels, Curtain Walls, and VeneersSOORJBALLY HARILALLspecial
12/23/2025VestibulesSoorjbally Harilallenergy_progress
12/23/2025Air barrier continuity plan testingSoorjbally Harilallenergy_progress
12/23/2025Exterior lighting powerSoorjbally Harilallenergy_progress
12/23/2025Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
12/23/2025Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
12/23/2025Lighting controlsSoorjbally Harilallenergy_progress
Latest 25 of 150.
▾Documents — 376 on file (BIS + DOB NOW)
▸Plans & Drawings58
▸DOB NOWPlans/Sketch58
08/27/2026B00868508-I1Request digital key ↗
08/25/2026B01017343-I1Request digital key ↗
08/25/2026B01017347-I1Request digital key ↗
Showing 3 of 58 on file for this type
▸Applications & Permits25
▸DOB NOWDEP Stormwater Construction Permit7
08/22/2026B00715375-S4Open ↗
08/22/2026B00715375-P6Open ↗
Showing 2 of 7 on file for this type
▸BISWORK PERMIT APPLICATION6
11/21/2023322159472Open ↗
11/21/2023322159472Open ↗
11/09/2023322159472Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
12/13/2024340888686Open ↗
10/31/2024340888686Open ↗
10/22/2024322108394Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHPD - Permit Notice3
08/13/2026B00715375-S2Open ↗
Showing 1 of 3 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
11/01/2023340888686Open ↗
05/31/2023340888686Open ↗
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records36
▸DOB NOWRestrictive Declaration/Easement 122
08/14/2026B00715375-B7Open ↗
Showing 1 of 22 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/31/2023340888686Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications139
▸DOB NOWDPL-1: Design Professional Seal & Signature54
08/27/2026B00868508-I1Open ↗
08/25/2026B01017347-I1Open ↗
08/25/2026B01017355-I1Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWProgress Inspector Seal & Signature43
10/04/2026B00715375-B8Open ↗
10/04/2026B00715375-B8Open ↗
10/04/2026B00715375-B8Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature40
10/04/2026B00715375-B8Open ↗
10/04/2026B00715375-B8Open ↗
10/03/2026B01192684-I1Open ↗
Showing 3 of 40 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/31/2023340888686Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/31/2023340888686Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/22/2026B00715375-I1—
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist6
08/22/2026B00715375-B3Open ↗
08/22/2026B00715375-B2Open ↗
08/22/2026B00715375-A2Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
05/31/2023340888686Open ↗
▸BISSTREET TREE CHECKLIST1
05/31/2023340888686Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
05/10/2023322159472Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos35
▸DOB NOWOER: Notice to Proceed31
08/22/2026B00715375-P6Open ↗
08/22/2026B00715375-S4Open ↗
08/22/2026B00715375-S3Open ↗
Showing 3 of 31 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
11/01/2023340888686Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/10/2023322159472Open ↗
▸BISRODENT CONTROL1
05/10/2023322159472Open ↗
▸DOB NOWOER: Notice of Satisfaction1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT4
08/13/2026B00715375-P2Open ↗
08/13/2026B00715375-S2Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram2
08/13/2026B00715375-S2Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR5 Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION9
11/21/2023322159472Open ↗
11/09/2023322159472Open ↗
06/28/2023340888686Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS APPROVAL1
05/10/2023322159472Open ↗
▸BISSUPERSEDING LETTER1
11/01/2023322159472Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE4
11/21/2023322159472Open ↗
11/09/2023322159472Open ↗
11/01/2023322159472Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
11/21/2023322159472Open ↗
11/09/2023322159472Open ↗
11/01/2023322159472Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET3
01/24/2023322159472Open ↗
06/21/2022322108385Open ↗
06/21/2022322108394Open ↗
▸BISADDITIONAL INFORMATION3
12/17/2024340888686Open ↗
11/01/2024340888686Open ↗
11/01/2023340888686Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/31/2023340888686Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/31/2023340888686Open ↗
▸Other Documents31
▸DOB NOWProperty Ownership Certification7
08/22/2026B00715375-B3Open ↗
08/22/2026B00715375-B2Open ↗
08/22/2026B00715375-A2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
11/09/2023322159472Open ↗
11/01/2023322159472Open ↗
05/10/2023322159472Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type