← Back
Two family converted from one family
1042 HALL PLACE
BRONX · BIN 2005394
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R7-1Zoning
2,025 sfGross Floor Area
2Units
Rent Stabilized
Two family converted from one family · Owner of record: AMERICAN PRIDE GROUP, LLC · 1,128 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar3p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMERICAN PRIDE GROUP LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/21/2025$540K—— → —$267/sf building
12/15/2020$485K—— → —$240/sf building
06/15/2016$285K—— → —$141/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OMF ARCHITECT PC205/08/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COMPLEX DEVELOPMENT INCGeneral Contractor104/09/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OMF ARCHITECTS PC5900105/07/2025
Building Lifecycle
All (26)Filed (2)Permit Issued (2)Signed Off (2)Inspection (6)Objection (10)Special Inspection (4)
02/09/2026
Signed off — Alteration
Interior renovation of an existing two-family dwelling, including the addition and replacement of the existing skylight on the roof. The plumbing work will be done under a subsequent filing.
X01221343-S1
02/09/2026
Signed off — Alteration
Interior renovation of an existing two-family dwelling, including the addition and replacement of the existing skylight on the roof. The plumbing work will be done under a subsequent filing.
X01221343-I1
01/29/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/09/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/03/2025
Permit issued — Plumbing
X01221343-S1-PL
05/15/2025
Permit issued — General Construction
X01221343-I1-GC
05/14/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/13/2025
Objection raised — Plumbing
05/13/2025
Objection raised — Plumbing
05/12/2025
Objection raised — Other
05/12/2025
Objection raised — Other
05/12/2025
Objection raised — Other
05/08/2025
Filed — Alteration
Interior renovation of an existing two-family dwelling, including the addition and replacement of the existing skylight on the roof. The plumbing work will be done under a subsequent filing.
X01221343-S1
05/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
OSCAR FUERTES
05/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
OSCAR FUERTES
05/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
OSCAR FUERTES
05/08/2025
Special inspection requirement — Maintenance information
OSCAR FUERTES
05/07/2025
Filed — Alteration
Interior renovation of an existing two-family dwelling, including the addition and replacement of the existing skylight on the roof. The plumbing work will be done under a subsequent filing.
X01221343-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC06/03/2025
DOB NOWGeneral ConstructionSigned-offCOMPLEX DEVELOPMENT INC05/15/2025
1 project · most recent 10/21/2025
General Wiring
FiledStatusContractorScope
10/21/2025Permit IssuedDNR ELECTRIC INCORPORATEGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/29/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/09/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/08/2025HVAC-R and service water piping design and insulationOSCAR FUERTESenergy_progress
05/08/2025HVAC-R and service water heating equipmentOSCAR FUERTESenergy_progress
05/08/2025HVAC-R and service water heating system controlsOSCAR FUERTESenergy_progress
05/08/2025Maintenance informationOSCAR FUERTESenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026X01221343-S1Request digital key ↗
08/19/2026X01221343-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X01221343-I1Open ↗
08/13/2026X01221343-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026X01221343-S1Open ↗
08/24/2026X01221343-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01221343-S1Open ↗
08/13/2026X01221343-I1Open ↗