← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Prospect Pointe
1042 PRESIDENT STREET · BIN 3428914
💬 Discuss this project
2023Year Built
8Stories
D1Building Class
R6Zoning
35,571 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized1 Active Violation ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: President Lofts · 8,610 sf lot · 4.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsNew Building HVAC Work4 filings
RoofTemporary suspended scaffolding installation1p · 2 filings
Floor 11 filing · 2 docs
Site & exteriorConstruction fence installation3 filings · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/09/2021$1.6M—Private party → PRESIDENT LOFTS 2 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Advanced Engineering & Inspection1007/26/2023
Skyline Rigging102/13/2023
Ashraf412/13/2022
Titan Engineers211/15/2022
S. Wieder Architect210/27/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting 4 U1403/21/2026
Platinum Services NY603/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Park Management USAGeneral Contractor907/08/2026
Park Management USAScaffold407/08/2026
Platinum Services NYScaffold207/08/2026
Pipe Solutions AdvisPlumbing207/08/2026
DoriaScaffold203/21/2026
Piping & Plumbing SolutionsFire Protection107/08/2026
Power Direct ElectricGeneral Contractor103/22/2026
S Wieder Architect P CGeneral Contractor103/22/2026
Power Direct ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161207/26/2023
Skyline Rigging7880102/13/2023
Building Lifecycle
05/11/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
12/30/2025
§ 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL…
HPD violation · closed
10/22/2025
Elevator Category 1 inspection report filed
09/04/2023
Signed off — Alteration
B00403316-I1
08/25/2023
Signed off — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION TO NEW BUILDING JOB #321592709.
B00502753-I1
114 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPark Management USA07/10/2023
DOB NOWMechanical SystemsSigned-offPark Management USA06/07/2023
DOB NOWStructuralSigned-offPark Management USA05/01/2023
DOB NOWPlumbingSigned-offPipe Solutions Advis04/26/2023
DOB NOWProtection and Mechanical MethodsSigned-offDoria02/13/2023
DOB NOWSprinklersSigned-offEmpire Plumbing01/26/2023
DOB NOWConstruction FenceSigned-offPark Management USA01/20/2023
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY12/14/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY09/30/2022
DOB NOWPlumbingSigned-offPipe Solutions Advis09/14/2022
DOB NOWStructuralSigned-offPark Management USA05/03/2022
DOB NOWConstruction FenceSigned-offPark Management USA12/23/2021
BIS—ISSUEDPark Management USA05/01/2023
BIS—ISSUEDPark Management USA03/31/2023
BIS—ISSUEDPark Management USA03/30/2022
BIS—ISSUEDPark Management USA01/18/2022
3 projects · most recent 07/25/2023
General Wiring
FiledStatusContractorScope
07/25/2023CompletePower Direct ElectricGeneral Wiring
10/18/2022CompleteStar Electrical Contractors—
03/25/2022CompletePower Direct Electric—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/20/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
07/19/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
07/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/18/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
07/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/04/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/21/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/21/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/20/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
08/02/2023Post-installed AnchorsFAHAD FATEHspecial
08/02/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/02/2023Sprinkler SystemsFAHAD FATEHspecial
07/23/2023Sprinkler SystemsFAHAD FATEHspecial
07/23/2023Post-installed AnchorsFAHAD FATEHspecial
07/23/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/14/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/14/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
06/14/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/14/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
06/14/2023Maintenance informationFAHAD FATEHenergy_progress
06/14/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/14/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/13/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/13/2023Post-installed AnchorsFAHAD FATEHspecial
06/13/2023Sprinkler SystemsFAHAD FATEHspecial
05/19/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/19/2023Shutoff dampersFAHAD FATEHenergy_progress
05/19/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/19/2023Heating SystemsFAHAD FATEHspecial
05/19/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/19/2023Mechanical SystemsFAHAD FATEHspecial
05/19/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
05/19/2023FinalFAHAD FATEHprogress
05/19/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
Latest 25 of 50.
186 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account