← Back
Two family frame
1043 WOODROW ROAD
STATEN ISLAND · Arden Heights-Rossville · BIN 5079658
💬 Discuss this project
2005Year Built
3Stories
B2Building Class
R3XZoning
9,288 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · 11,120 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
Electrical
Roof3p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC110/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/28/2025
Building Lifecycle
All (11)Filed (1)Permit Issued (1)Signed Off (1)Violation (3)Special Inspection (5)
01/26/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01309278-I1
11/06/2025
Permit issued — Solar
S01309278-I1-SL
10/28/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01309278-I1
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/27/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/27/2025
Special inspection requirement — Final
Walid Abdulla
10/27/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/07/2009
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
06/08/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/06/2025
BIS—ISSUEDMAC ELECTRICAL CONTRACTOR INC06/09/2006
BIS—ISSUEDMAC ELECTRICAL CONTRACTOR INC02/02/2006
BISEQISSUEDMAC ELECTRICAL CONTRACTOR INC02/02/2006
BIS—ISSUEDMAC ELECTRICAL CONTRACTOR INC12/29/2005
BISEQISSUEDMAC ELECTRICAL CONTRACTOR INC12/29/2005
BISPLISSUEDPLUMBING NYC INC08/22/2005
BIS—ISSUEDMAC ELECTRICAL CONTRACTOR INC03/21/2005
BISEQISSUEDMAC ELECTRICAL CONTRACTOR INC03/21/2005
BISEQISSUEDMAC ELECTRICAL CONTRACTOR INC11/22/2004
BIS—ISSUEDRELIABLE CONSTRUCTION OF SI INC12/03/1999
BISEQISSUEDRELIABLE CONSTRUCTION OF SI INC12/03/1999
1 project · most recent 10/28/2025
FiledStatusContractorScope
10/28/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/27/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/27/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/27/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/27/2025FinalWalid Abdullaprogress
10/27/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026S01309278-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026S01309278-I1Open ↗
08/23/2026S01309278-I1Open ↗
08/23/2026S01309278-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026S01309278-I1Open ↗
08/23/2026S01309278-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01309278-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01309278-I1Open ↗