← Back
BuildNYC
Two family frame
1043 WOODROW ROAD
STATEN ISLAND · BIN 5079658
💬 Discuss this project
2005Year Built
3Stories
B2Building Class
R3XZoning
9,288 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 11,120 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation3p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering110/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation ServiceGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272110/28/2025
Building Lifecycle
01/26/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01309278-I1
11/06/2025
Permit issued — Solar
S01309278-I1-SL
10/28/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01309278-I1
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
10/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
13 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service11/06/2025
BIS—ISSUEDMac Electrical Contractor06/09/2006
BIS—ISSUEDMac Electrical Contractor02/02/2006
BISEQISSUEDMac Electrical Contractor02/02/2006
BIS—ISSUEDMac Electrical Contractor12/29/2005
BISEQISSUEDMac Electrical Contractor12/29/2005
BISPLISSUEDPlumbing NYC08/22/2005
BIS—ISSUEDMac Electrical Contractor03/21/2005
BISEQISSUEDMac Electrical Contractor03/21/2005
BISEQISSUEDMac Electrical Contractor11/22/2004
BIS—ISSUEDReliable Construction of SI12/03/1999
BISEQISSUEDReliable Construction of SI12/03/1999
1 project · most recent 10/28/2025
FiledStatusContractorScope
10/28/2025CompleteSunrun Solar Electl—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/27/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/27/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/27/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/27/2025FinalWalid Abdullaprogress
10/27/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account