← Back
Over six families without stores
1045 64 STREET
BROOKLYN · BIN 3141758
💬 Discuss this project
1927Year Built
3Stories
C1Building Class
R5BZoning
10,320 sfGross Floor Area
12Units
Rent Stabilized90 Open Violations 89 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · 4,042 sf lot · 2.55 FAR built · Flood zone X
Locations of Work
Architecture
Floor 33p · 2 filings · 14 docs
Floor 2
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/01/2024$531K—Private party → Private party$51/sf building
07/10/2024$2.1M—ENDURANCE HOLDINGS GROUP, LLC → Private party$206/sf building
08/04/2014$1.6M—MENASHE SCHWARTZ TRUSTEE OF 1045 64TH ST IRREV TR → ENDURANCE HOLDINGS GROUP LLC$150/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIAN ENGINEERING PLLC308/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK CREATIVE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIRST STAR CONSTRUCTION *General Contractor303/21/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397308/07/2025
Building Lifecycle
All (82)Filed (3)Permit Issued (2)Signed Off (2)Violation (60)Inspection (3)Objection (6)Special Inspection (6)
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, open)
B
05/01/2026
Violation issued (HPD, open)
A
03/27/2026
Violation issued (HPD, open)
B
03/27/2026
Violation issued (HPD, open)
B
03/27/2026
Violation issued (HPD, open)
C
03/27/2026
Violation issued (HPD, open)
C
03/27/2026
Violation issued (HPD, open)
B
03/27/2026
Violation issued (HPD, open)
B
03/27/2026
Violation issued (HPD, open)
C
03/27/2026
Violation issued (HPD, open)
A
03/27/2026
Violation issued (HPD, open)
A
03/27/2026
Violation issued (HPD, open)
C
03/27/2026
Violation issued (HPD, closed)
C
03/27/2026
Violation issued (HPD, open)
B
03/27/2026
Violation issued (HPD, open)
C
03/26/2026
Violation issued (HPD, open)
A
03/26/2026
Violation issued (HPD, open)
B
03/26/2026
Violation issued (HPD, open)
B
03/26/2026
Violation issued (HPD, open)
B
03/26/2026
Violation issued (HPD, open)
B
03/26/2026
Violation issued (HPD, open)
A
03/26/2026
Violation issued (HPD, open)
A
03/26/2026
Violation issued (HPD, closed)
C
03/26/2026
Violation issued (HPD, closed)
C
03/26/2026
Violation issued (HPD, open)
A
03/26/2026
Violation issued (HPD, open)
B
03/26/2026
Violation issued (HPD, open)
B
03/25/2026
Violation issued (HPD, closed)
C
03/25/2026
Violation issued (HPD, open)
B
03/25/2026
Violation issued (HPD, open)
B
03/25/2026
Violation issued (HPD, closed)
C
03/25/2026
Violation issued (HPD, open)
B
03/25/2026
Violation issued (HPD, open)
B
03/25/2026
Violation issued (HPD, open)
C
03/25/2026
Violation issued (HPD, open)
B
03/25/2026
Violation issued (HPD, open)
B
03/25/2026
Violation issued (HPD, open)
B
03/25/2026
Violation issued (HPD, open)
B
03/25/2026
Violation issued (HPD, closed)
C
03/25/2026
Violation issued (HPD, open)
B
11/19/2025
Violation issued (HPD, open)
I
10/01/2025
Signed off — Alteration
FILED THIS APPLICATION TO REPLACE 1 SINK, 1 LAV, 1 TOILET & 1 SHOWER AT 3RD FL APT #C4, NO GAS WORK INVOLVE. GENERAL CONSTRUCTION WILL FILING SEPARATE APPLICATION JOB#B01229893, NO CHANGE IN USE, EGRESS, OCCUPANCY AND BULK.
B01234047-I1
09/19/2025
Signed off — Alteration
MINOR INTERIOR RENOVATION ON 3RD FLOOR APT#4C, TO INSTALL VINYL PLANK FLOORING OVER EXISTING VINYL FLOOR. PL WORK WILL FILED SEPARATE APPLICATION #B01234047 ,NO CHANGE TO USE,EGRESS OR OCCUPANCY
B01229893-I1
09/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/04/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
JIAN DENG
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
08/14/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
08/07/2025
Filed — Alteration
MINOR INTERIOR RENOVATION ON 3RD FLOOR APT#4C, TO INSTALL VINYL PLANK FLOORING OVER EXISTING VINYL FLOOR. PL WORK WILL FILED SEPARATE APPLICATION #B01234047 ,NO CHANGE TO USE,EGRESS OR OCCUPANCY
B01229893-P1
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
08/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
07/22/2025
Permit issued — Plumbing
B01234047-I1-PL
06/30/2025
Permit issued — General Construction
B01229893-I1-GC
06/25/2025
Objection resolved — Addressed
06/25/2025
Objection resolved — Addressed
06/14/2025
Objection resolved — Addressed
06/13/2025
Objection raised — Plumbing
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW PLUMBING INC07/22/2025
DOB NOWGeneral ConstructionSigned-offFIRST STAR CONSTRUCTION *06/30/2025
1 project · most recent 07/14/2025
General Wiring
FiledStatusContractorScope
07/14/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/04/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/14/2025Tenant Protection Plan ComplianceJIAN DENGspecial
08/14/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
08/14/2025Energy Code Compliance InspectionsJIAN DENGprogress
08/05/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
08/05/2025Tenant Protection Plan Compliance—special
08/05/2025Energy Code Compliance InspectionsJIAN DENGprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01229893-I1Request digital key ↗
08/21/2026B01229893-P1Request digital key ↗
08/21/2026B01234047-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01229893-I1Open ↗
08/21/2026B01229893-P1Open ↗
08/21/2026B01234047-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026B01229893-P1Open ↗
08/22/2026B01229893-I1Open ↗
08/22/2026B01229893-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B01229893-P1Open ↗
08/22/2026B01229893-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01229893-P1Open ↗
08/21/2026B01229893-I1Open ↗
08/21/2026B01234047-I1Open ↗