Three families
1046 MORRIS AVENUE
BRONX · BIN 2002380
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
R7-1Zoning
3,354 sfGross Floor Area
3Units
Rent Stabilized28 Open Violations 23 unresolved · 5 paperwork only ▸
Three families · 1,850 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction24p · 2 filings · 20 docs
Floor 3Under Construction26p · 2 filings · 20 docs
Floor 2Under Construction23p · 2 filings · 20 docs
Floor 1Under Construction23p · 1 filing · 18 docs
BasementUnder Construction26p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1046 MORRIS LLC203/22/2026
BUREAU OF DESIGN REVIEW203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/27/2026$1.1M—— → —$337/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB605/13/2026
XPDITE GROUP LLC105/04/2026
VASILIOS ARTEMIOU PE103/24/2026
PRAMODRAY SHAH, P.E.111/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)503/21/2026
XPDITE GROUP 103303/21/2026
XPDITE GROUP LLC 104203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor309/12/2026
POWER DIRECT ELECTRIC INCElectrical203/22/2026
QUALITY PIPING, INCFire Protection109/12/2026
NESS MECHANICAL P & H INCPlumbing109/12/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616503/24/2026
Building Lifecycle
All (132)Filed (9)Permit Issued (5)Violation (46)Objection (42)Special Inspection (30)
09/10/2026
Permit issued — Mechanical Systems
X01349818-S2-MS
09/10/2026
Permit issued — Plumbing
X01349818-S1-PL
09/10/2026
Permit issued — Sprinklers
X01349818-S3-EW-SP
08/24/2026
Permit issued — Construction Fence
X01401261-I1-FN
08/24/2026
Permit issued — General Construction
X01349818-I1-GC
07/28/2026
Objection resolved — Resolved
06/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/30/2026
Special inspection requirement — Ventilation and air distribution system
05/22/2026
Objection raised — Scope
05/18/2026
Objection raised — Scope
05/13/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR THE INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE
X01401261-I1
05/06/2026
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION X01349818-I1 TO INSTALL WET SPRINKLER SYSTEM IN THE ENTIRE BUILDING AND IN ACCORDANCE WITH NFPA 13R 2016 EDITION AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN
X01349818-S2
05/04/2026
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION X01349818-I1 TO INSTALL WET SPRINKLER SYSTEM IN THE ENTIRE BUILDING AND IN ACCORDANCE WITH NFPA 13R 2016 EDITION AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN
X01349818-S1
04/30/2026
Violation issued (HPD, open)
A
04/21/2026
Objection resolved — Addressed
04/21/2026
Objection resolved — Addressed
04/21/2026
Objection resolved — Resolved
04/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/21/2026
Special inspection requirement — Maintenance information
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/08/2026
Objection raised — Fire_Protection
04/08/2026
Objection raised — Fire_Protection
04/08/2026
Objection raised — Fire_Protection
04/08/2026
Objection raised — Fire_Protection
04/02/2026
Objection raised — Zoning
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
03/26/2026
Special inspection requirement — Maintenance information
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/24/2026
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION X01349818-I1 TO INSTALL WET SPRINKLER SYSTEM IN THE ENTIRE BUILDING AND IN ACCORDANCE WITH NFPA 13R 2016 EDITION AS MODIFIED BY NYC BC 2022 APPENDIX Q AS PER PLAN
X01349818-S3
03/19/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
03/12/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/11/2026
Objection resolved — Addressed
03/04/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
03/04/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
02/11/2026
Objection raised — Admin
02/11/2026
Objection raised — Structural
02/11/2026
Objection raised — Structural
02/11/2026
Objection raised — Structural
02/11/2026
Objection raised — Scope
02/11/2026
Objection raised — Structural
02/11/2026
Objection raised — Structural
02/11/2026
Objection raised — Structural
02/11/2026
Objection raised — Energy
02/11/2026
Objection raised — Plumbing
02/11/2026
Objection raised — Structural
02/03/2026
Violation issued (ECB, open)
Unknown
02/03/2026
Violation issued (ECB, open)
Construction
02/03/2026
Violation issued (ECB, open)
Construction
02/03/2026
Violation issued (ECB, open)
Construction
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBUILDERS GROUP USA INC09/10/2026
DOB NOWPlumbingPermit IssuedNESS MECHANICAL P & H INC09/10/2026
DOB NOWSprinklersPermit IssuedQUALITY PIPING, INC09/10/2026
DOB NOWConstruction FencePermit IssuedBUILDERS GROUP USA INC08/24/2026
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA INC08/24/2026
BIS—ISSUEDALMO GROUP CORPORATION04/11/2001
BISPLISSUEDCEGF & G PLUMBING CORP11/02/2000
BIS—ISSUEDALMO GROUP CORPORATION03/20/2000
1 project · most recent 05/06/2026
Sprinkler System
FiledStatusContractorScope
05/06/2026Permit IssuedQUALITY PIPING, INCSprinkler System
2 projects · most recent 05/06/2026
Water/Sanitary
FiledStatusContractorScope
05/06/2026Permit IssuedQUALITY PIPING, INC—
11/21/2025——Water/Sanitary
2 projects · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
12/16/2025Permit IssuedPOWER DIRECT ELECTRIC INC—
1 project · most recent 11/21/2025
Wood
FiledStatusContractorScope
11/21/2025——Wood
1 project · most recent 05/13/2026
Fence
FiledStatusContractorScope
05/13/2026Permit IssuedBUILDERS GROUP USA INCFence
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/30/2026Duct leakage testing, insulation and design—energy_progress
06/30/2026Ventilation and air distribution system—energy_progress
04/21/2026HVAC-R and service water piping design and insulation—energy_progress
04/21/2026HVAC-R and service water heating equipment—energy_progress
04/21/2026HVAC-R and service water heating system controls—energy_progress
04/21/2026Maintenance information—energy_progress
03/26/2026Energy Code Compliance Inspections—progress
03/26/2026Maintenance information—energy_progress
03/26/2026Fire-Resistant Penetrations and Joints—special
03/26/2026HVAC-R and service water piping design and insulation—energy_progress
03/26/2026HVAC-R and service water heating equipment—energy_progress
03/26/2026HVAC-R and service water heating system controls—energy_progress
03/19/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
03/19/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
03/04/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
03/04/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
03/04/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
01/27/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
01/27/2026Final—progress
01/27/2026Mechanical Systems—special
01/21/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
01/21/2026Permanent certificateSHAHRIAR QUAYYUMenergy_progress
01/21/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
01/21/2026MeteringSHAHRIAR QUAYYUMenergy_progress
01/21/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 41.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026X01006267-S4Request digital key ↗
08/21/2026X01006267-S1Request digital key ↗
08/21/2026X01006267-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026X01006267-S4Open ↗
08/21/2026X01006267-S2Open ↗
08/21/2026X01006267-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026X01006267-S1Open ↗
09/01/2026X01006267-S1Open ↗
08/27/2026X01006267-S4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X01006267-S1Open ↗
08/28/2026X01349818-S3Open ↗
08/27/2026X01006267-S4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/16/2026X01349818-I1Open ↗
08/13/2026X01006267-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026X01349818-S3Open ↗
08/16/2026X01349818-I1Open ↗
08/14/2026X01349818-S2Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/21/2026X01006267-I1Open ↗
08/16/2026X01349818-I1Open ↗