← Back
Elevator apt, semi-fireproof with stores
1047 OGDEN AVENUE
BRONX · Highbridge · BIN 2130857
💬 Discuss this project
2022Year Built
7Stories
D7Building Class
R7-1Zoning
45,116 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized16 Open Violations ▸
Elevator apt, semi-fireproof with stores · Owner of record: OGDEN EQUITY LLC · 7,000 sf lot · 6.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Roof108p · 2 filings · 20 docs
Floor 7107p · 2 filings · 20 docs
Floor 6100p · 2 filings · 20 docs
Floor 595p · 2 filings · 20 docs
Floor 4106p · 2 filings · 20 docs
Floor 395p · 2 filings · 20 docs
Floor 299p · 2 filings · 20 docs
Floor 1124p · 2 filings · 20 docs
Cellar97p · 2 filings · 20 docs
Site & exterior79p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZLB603/22/2026
OWNERS REP507/08/2026
SKYWARD DEVELOPERS403/22/2026
OGDEN EQUITY LLC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIKOLAI KATZ ARCHITECT601/03/2024
FL&M ENGINEERING DESIGN &INSPECTION205/05/2023
CHOSEN MEP, CORP.403/23/2023
SH ENGINEERING PLLC305/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2403/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYWARD DEVELOPERS INCGeneral Contractor2607/08/2026
HIVOLTS ELECTRICAL INC 004090General Contractor303/22/2026
MANHATTAN D ENTERPRISESGeneral Contractor207/08/2026
NIKOLAI KATZElectrical103/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
STAR ELECL CONTRACTORS C 003267General Contractor103/22/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161001/03/2024
Building Lifecycle
All (110)Filed (14)Permit Issued (12)Signed Off (6)Violation (2)Inspection (16)Objection (30)Special Inspection (30)
05/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/22/2024
Special inspection requirement — Metering
FAHAD FATEH
02/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
02/22/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
02/22/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
02/22/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
02/22/2024
Special inspection requirement — Air barrier — testing
FAHAD FATEH
02/22/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
02/22/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
02/22/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
02/22/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
02/22/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
02/22/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
02/22/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
02/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/22/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/22/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
02/22/2024
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
02/21/2024
Objection resolved — Addressed
01/17/2024
Objection raised — Other
01/03/2024
Filed — New Building
INSTALLATION OF CURB CUT
X00579827-P6
12/14/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
12/14/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
12/14/2023
Special inspection requirement — Metering
FAHAD FATEH
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/14/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
12/14/2023
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
12/14/2023
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
12/14/2023
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
12/14/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
12/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
12/14/2023
Special inspection requirement — Interior lighting power
FAHAD FATEH
12/14/2023
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
06/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/15/2023
Signed off — New Building
INSTALLATION OF CURB CUT
X00579827-S2
06/14/2023
Signed off — New Building
INSTALLATION OF CURB CUT
X00579827-S3
06/13/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/07/2023
Signed off — New Building
INSTALLATION OF CURB CUT
X00579827-S1
06/05/2023
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00869487-I1
06/05/2023
Permit issued — Curb Cut
X00579827-S3-CC
06/02/2023
Permit issued — Mechanical Systems
X00579827-S2-MS
05/06/2023
Permit issued — Supported Scaffold
X00869487-I1-SF
05/06/2023
Permit issued — Sidewalk Shed
X00869487-I1-SH
05/05/2023
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00869487-I1
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/28/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/28/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/26/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/17/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/23/2023
Filed — New Building
INSTALLATION OF CURB CUT
X00579827-P4
03/22/2023
Filed — New Building
INSTALLATION OF CURB CUT
X00579827-P5
03/22/2023
Signed off — New Building
INSTALLATION OF CURB CUT
X00579827-S5
03/14/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/08/2023
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION, ROOF OF PROTECTION AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00764236-I1
03/01/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/08/2023
Permit issued — Construction Fence
X00579827-S5-FN
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSKYWARD DEVELOPERS INC06/05/2023
DOB NOWMechanical SystemsSigned-offSKYWARD DEVELOPERS INC06/02/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES05/06/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES05/06/2023
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC02/08/2023
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC12/21/2022
DOB NOWGeneral ConstructionPermit IssuedSKYWARD DEVELOPERS INC08/10/2022
DOB NOWStructuralPermit IssuedSKYWARD DEVELOPERS INC06/23/2022
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN05/23/2022
DOB NOWPlumbingSigned-offA M B MECHANICAL INC05/23/2022
DOB NOWStructuralPermit IssuedSKYWARD DEVELOPERS INC03/29/2022
DOB NOWConstruction FenceSigned-offSKYWARD DEVELOPERS INC02/04/2022
1 project · most recent 01/03/2024
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/03/2024Signed-offSKYWARD DEVELOPERS INCAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Daikin RK09NMVJU 9,000 BTU · Condensing Unit ×1
Heat / Cool
Daikin RXS09LVJU 9,000 BTU · Heat Pump Outdoor ×1
RXS12LVJU 14,400 BTU · Heat Pump Outdoor ×1
RXYQ192TTJU 206,000 BTU · Vrf Outdoor ×1
RZQ24PVJU9 27,000 BTU · Heat Pump Outdoor ×1
4 projects · most recent 07/11/2023
General Wiring
FiledStatusContractorScope
07/11/2023CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
10/14/2022CompleteSTAR ELEC'L CONTRACTORS C—
06/22/2022CompleteSOLAS ELECTRICAL CORP—
05/12/2022CompleteHIVOLTS ELECTRICAL INC—
1 project · most recent 05/23/2022
Concrete
FiledStatusContractorScope
05/23/2022Permit IssuedSKYWARD DEVELOPERS INCConcrete
1 project · most recent 05/23/2022
Earthwork
FiledStatusContractorScope
05/23/2022Permit IssuedSKYWARD DEVELOPERS INCEarthwork
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
05/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/13/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
04/28/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/26/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/17/2023Pass-Final PL - UndergroundPassView ↗
03/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2022Pass-Final House ConnectionPassView ↗
12/14/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/13/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 140
DateRequirementInspectorRole
02/22/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
02/22/2024Fenestration areasFAHAD FATEHenergy_progress
02/22/2024Lighting controlsFAHAD FATEHenergy_progress
02/22/2024Interior lighting powerFAHAD FATEHenergy_progress
02/22/2024Fenestration air leakageFAHAD FATEHenergy_progress
02/22/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
02/22/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
02/22/2024Electrical motors and elevatorsFAHAD FATEHenergy_progress
02/22/2024MeteringFAHAD FATEHenergy_progress
02/22/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
02/22/2024Maintenance informationFAHAD FATEHenergy_progress
02/22/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
02/22/2024Air barrier — testing FAHAD FATEHenergy_progress
02/22/2024Exterior lighting powerFAHAD FATEHenergy_progress
02/22/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/22/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
02/22/2024Post-installed AnchorsFAHAD FATEHspecial
02/22/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/14/2023Post-installed AnchorsFAHAD FATEHspecial
12/14/2023Fenestration areasFAHAD FATEHenergy_progress
12/14/2023Protection of exposed foundation insulationFAHAD FATEHenergy_progress
12/14/2023Air barrier — testing FAHAD FATEHenergy_progress
12/14/2023Exterior lighting powerFAHAD FATEHenergy_progress
12/14/2023Lighting controlsFAHAD FATEHenergy_progress
12/14/2023Maintenance informationFAHAD FATEHenergy_progress
Latest 25 of 140.
▾Documents — 104 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/24/2026X00661703-P2Request digital key ↗
08/24/2026X00661703-P1Request digital key ↗
08/24/2026X00764236-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026X00579827-I1Open ↗
08/13/2026X00579827-P1Open ↗
08/13/2026X00579827-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026X00579827-P2Open ↗
08/13/2026X00579827-P1Open ↗
08/13/2026X00579827-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00579827-I1Open ↗
▸Seals & Professional Certifications46
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026X00579827-P1Open ↗
09/02/2026X00661703-P2Open ↗
09/02/2026X00661703-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026X00579827-P1Open ↗
09/02/2026X00661703-P2Open ↗
08/31/2026X00579827-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/24/2026X00661703-P1Open ↗
08/24/2026X00661703-P2Open ↗
08/24/2026X00661703-I1Open ↗
Showing 3 of 15 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026X00579827-P6Open ↗
08/13/2026X00579827-P1Open ↗
08/13/2026X00579827-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026X00579827-P6Open ↗
08/13/2026X00579827-P2Open ↗
08/13/2026X00579827-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00579827-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00579827-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00579827-I1Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00579827-S2Open ↗
08/13/2026X00579827-S1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00579827-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026X00661703-P2Open ↗
08/13/2026X00661703-P1Open ↗
08/13/2026X00661703-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00661703-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00661703-I1Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial4
08/13/2026X00579827-P6Open ↗
08/13/2026X00579827-P2Open ↗
08/13/2026X00579827-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026X00579827-P6Open ↗
08/13/2026X00579827-I1Open ↗
08/13/2026X00579827-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/23/2026X00579827-P2Open ↗
08/23/2026X00579827-P1Open ↗
08/23/2026X00579827-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X00579827-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00661703-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00579827-I1Open ↗