Museum
1048 5 AVENUE
MANHATTAN · BIN 1046843
💬 Discuss this project
1914Year Built
5Stories
P7Building Class
R10Zoning
21,294 sfGross Floor Area
0Units
0 Open Violations
Museum · 4,750 sf lot · 4.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction14p · 8 filings · 20 docs
Bulkhead1p · 1 filing · 9 docs
Floor 5Under Construction29p · 3 filings · 20 docs
Floor 41p · 1 filing · 11 docs
Floor 3
Floor 21p · 1 filing · 11 docs
Floor 11p · 1 filing · 6 docs
CellarUnder Construction31p · 4 filings · 20 docs
Sub-CellarUnder Construction35p · 2 filings · 20 docs
Basement4p · 3 filings · 20 docs
Sub-BasementUnder Construction5p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEUE GALERIE NEW YORK2209/23/2026
PRESERV BUILDING RESTORATION MANAGE609/13/2026
NEUE GALERIE3807/08/2026
CANIDO BASONAS CONSTRUCTION903/22/2026
SKYLINE SCAFFOLDING GROUP503/22/2026
SABARSKY SERGE CORP103/22/2026
SPIRE SCAFFOLDING & HOISTING CORP103/22/2026
1050 FIFTH AVE203/21/2026
1048 FIFTH AVENUE403/21/2026
1049 FIFTH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS603/21/2026
CODE1803/21/2026
A1 EXPEDITING SERVICE1203/21/2026
ELIZABETH ROBERTS ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPIRE SCAFFOLDING & HOISTGeneral Contractor707/08/2026
CANIDO BASONAS CONSTRUCTIGeneral Contractor603/21/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor603/21/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor507/08/2026
EUROSTRUCT INCGeneral Contractor507/08/2026
PRESERV BLD RESTOR MGT INGeneral Contractor406/28/2026
JT MAGEN & COMPANY INCGeneral Contractor407/08/2026
THE METRO GROUP PLBG LLCPlumbing207/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor204/09/2026
THE METRO GROUP, INCGeneral Contractor207/14/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
JOSEPH BRAMANElectrical103/21/2026
SAMIRO SERVICES INCGeneral Contractor107/22/2026
GREGORY PAPANTONIOUElectrical103/21/2026
BIG SHOT ELECTRIC CORP.Electrical103/22/2026
ANTHONY RANIERIElectrical103/21/2026
ASHLAND PLUMBING CORPPlumbing107/08/2026
APPLE RESTORATION & WATERPROOFGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC6781608/13/2026
KONOSKI ENGINEERING PLLC9111107/16/2026
360 ENGINEERING P.C.7496108/19/2022
NY RESTORATION TECHNOLOGY6187201/28/2021
Building Lifecycle
All (179)Filed (43)Permit Issued (32)Signed Off (15)Violation (25)Inspection (8)Objection (26)Special Inspection (30)
09/22/2026
Permit issued — Boiler Equipment
M01263203-S1-BE
08/13/2026
Filed — Alteration
AC UNITS TO BE REFURBISHED & REBUILT.HUMIDIFIERS TO BE REMOVED & REPLACED ON THE 5TH FL.GAS BOILER AND ASSOCIATED PIPING TO BE REMOVED. PIPING AND ELECTRIC BOILER TO BE RECONNECTED.BASE BUILDING HOT WATER PUMPS TO BE ADDED WITH ALL NECESSARY PIPING SUBCEL
M01393937-P2
08/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01411353-P1
08/06/2026
Filed — Alteration
AC UNITS TO BE REFURBISHED & REBUILT.HUMIDIFIERS TO BE REMOVED & REPLACED ON THE 5TH FL.GAS BOILER AND ASSOCIATED PIPING TO BE REMOVED. PIPING AND ELECTRIC BOILER TO BE RECONNECTED.BASE BUILDING HOT WATER PUMPS TO BE ADDED WITH ALL NECESSARY PIPING SUBCEL
M01393937-P1
08/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/28/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01348194-P2
07/23/2026
Special inspection requirement — Final
Annabelle Selldorf
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
07/21/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01348193-P2
07/20/2026
Permit issued — Mechanical Systems
M01386736-I1-MS
07/16/2026
Filed — Alteration
Filing herewith for Installation of Grease Exhaust Duct (12 GA Black Iron), Type-I Hoods & PCU at Cellar Kitchen.
M01386736-I1
07/13/2026
Permit issued — General Construction
M01393937-I1-GC
06/23/2026
Permit issued — Plumbing
M01393937-S2-PL
06/23/2026
Permit issued — Mechanical Systems
M01393937-S1-MS
06/12/2026
Permit issued — Protection and Mechanical Methods
M01412479-I1-PMM
06/12/2026
Permit issued — Protection and Mechanical Methods
M01411353-I1-PMM
06/10/2026
Permit issued — Protection and Mechanical Methods
M01410274-I1-PMM
06/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01411353-I1
06/08/2026
Filed — Alteration
M01412479-I1
06/08/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SHANTY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01410274-I1
06/01/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01348194-P1
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/28/2026
Objection resolved — Addressed
05/27/2026
Objection raised — Admin
05/27/2026
Objection raised — Admin
05/27/2026
Objection raised — Scope
05/26/2026
Objection raised — Admin
05/12/2026
Filed — Alteration
AC UNITS TO BE REFURBISHED & REBUILT.HUMIDIFIERS TO BE REMOVED & REPLACED ON THE 5TH FL.GAS BOILER AND ASSOCIATED PIPING TO BE REMOVED. PIPING AND ELECTRIC BOILER TO BE RECONNECTED.BASE BUILDING HOT WATER PUMPS TO BE ADDED WITH ALL NECESSARY PIPING SUBCEL
M01393937-S2
05/12/2026
Filed — Alteration
AC UNITS TO BE REFURBISHED & REBUILT.HUMIDIFIERS TO BE REMOVED & REPLACED ON THE 5TH FL.GAS BOILER AND ASSOCIATED PIPING TO BE REMOVED. PIPING AND ELECTRIC BOILER TO BE RECONNECTED.BASE BUILDING HOT WATER PUMPS TO BE ADDED WITH ALL NECESSARY PIPING SUBCEL
M01393937-S1
05/06/2026
Filed — Alteration
AC UNITS TO BE REFURBISHED & REBUILT.HUMIDIFIERS TO BE REMOVED & REPLACED ON THE 5TH FL.GAS BOILER AND ASSOCIATED PIPING TO BE REMOVED. PIPING AND ELECTRIC BOILER TO BE RECONNECTED.BASE BUILDING HOT WATER PUMPS TO BE ADDED WITH ALL NECESSARY PIPING SUBCEL
M01393937-I1
05/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01348193-P1
04/28/2026
Special inspection requirement — Final
Ari Kamo
04/28/2026
Special inspection requirement — Post-installed Anchors
Ari Kamo
04/28/2026
Special inspection requirement — Heating Systems
Ari Kamo
04/28/2026
Special inspection requirement — Mechanical Systems
Ari Kamo
04/23/2026
Permit issued — General Construction
M01268869-I1-GC
04/23/2026
Permit issued — Plumbing
M01263203-I1-PL
04/23/2026
Permit issued — Boiler Equipment
M01263203-S1-BE
04/13/2026
Special inspection requirement — Maintenance information
christopher konoski
04/13/2026
Special inspection requirement — Ventilation and air distribution system
christopher konoski
04/13/2026
Special inspection requirement — Duct leakage testing, insulation and design
christopher konoski
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
christopher konoski
04/13/2026
Special inspection requirement — Mechanical Systems
christopher konoski
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
christopher konoski
04/13/2026
Special inspection requirement — Final
christopher konoski
03/17/2026
Special inspection requirement — Post-installed Anchors
Ari Kamo
03/17/2026
Special inspection requirement — Final
Nathanael Morejon
03/06/2026
Filed — Alteration
FACADE AND ROOF REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01268869-P1
03/03/2026
Special inspection requirement — Post-installed Anchors
03/03/2026
Special inspection requirement — Final
02/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/28/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/21/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01348193-I1
01/21/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01348194-I1
01/21/2026
Permit issued — Sidewalk Shed
M01348193-I1-SH
01/21/2026
Permit issued — Supported Scaffold
M01348194-I1-SF
01/20/2026
Objection resolved — Addressed
12/08/2025
Objection raised — Scope
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedRICHARD MORTMAN09/22/2026
DOB NOWMechanical SystemsPermit IssuedSAMIRO SERVICES INC07/20/2026
DOB NOWGeneral ConstructionPermit IssuedTHE METRO GROUP, INC07/13/2026
DOB NOWPlumbingPermit IssuedTHE METRO GROUP PLBG LLC06/23/2026
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC06/23/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN06/12/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN06/12/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN06/10/2026
DOB NOWGeneral ConstructionPermit IssuedPRESERV BLD RESTOR MGT IN04/23/2026
DOB NOWPlumbingPermit IssuedTHE METRO GROUP PLBG LLC04/23/2026
DOB NOWBoiler EquipmentPermit IssuedRICHARD MORTMAN04/23/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC01/21/2026
DOB NOWSupported ScaffoldPermit IssuedANDAMIO SCAFFOLDING LLC01/21/2026
DOB NOWBoiler EquipmentSigned-offRICHARD MORTMAN07/09/2024
DOB NOWMechanical SystemsSigned-offJT MAGEN & COMPANY INC11/14/2023
DOB NOWStructuralSigned-offJT MAGEN & COMPANY INC11/13/2023
DOB NOWGeneral ConstructionSigned-offAPPLE RESTORATION & WATER07/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offROCKLEDGE SCAFFOLD CORP07/05/2023
DOB NOWPlumbingSigned-offASHLAND PLUMBING CORP05/25/2023
DOB NOWSupported ScaffoldSigned-offROCKLEDGE SCAFFOLD CORP05/11/2023
DOB NOWGeneral ConstructionSigned-offJT MAGEN & COMPANY INC05/08/2023
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP04/21/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPIRE SCAFFOLDING & HOIST08/20/2022
DOB NOWConstruction FenceSigned-offSPIRE SCAFFOLDING & HOIST08/19/2022
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST08/19/2022
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP04/01/2022
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP04/01/2022
DOB NOWMechanical SystemsSigned-offEUROSTRUCT INC11/29/2021
DOB NOWMechanical SystemsSigned-offEUROSTRUCT INC03/17/2021
DOB NOWMechanical SystemsSigned-offEUROSTRUCT INC01/28/2021
DOB NOWSupported ScaffoldSigned-offCANIDO BASONAS CONSTRUCTI12/09/2020
DOB NOWSupported ScaffoldSigned-offCANIDO BASONAS CONSTRUCTI07/17/2020
BIS—ISSUEDC&M DRYWALL & ACOUSTIC CO03/25/2019
BISMHISSUEDWESTERMAN CONSTRUCTION CO07/26/2017
BISOTISSUEDWESTERMAN CONSTRUCTION CO07/26/2017
BISPLISSUEDMAC FELDER INC07/14/2016
BISOTISSUEDWESTERMAN CONSTRUCTION CO07/01/2016
BISMHISSUEDWESTERMAN CONSTRUCTION CO07/01/2016
BISOTISSUEDWESTERMAN CONSTRUCTION CO07/01/2016
BIS—ISSUEDNORTH SHORE NEON SIGN CO12/09/2010
+ 42 more permits on file
1 project · most recent 08/13/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2026Permit IssuedTHE METRO GROUP, INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
— UNIT #: 39LF06BA-CSBAGAAA9 165,000 BTU ×4
UNIT #: 39FL06AA-CLAAJJAA9 45,000 BTU ×2
UNIT #: 39FL15BA-CQBABEA19 170,000 BTU ×2
UNIT #: 39LF15BA-CQBABEA19 170,000 BTU ×2
UNIT #:39FL08BA-CQBAHIAB9. 77,000 BTU ×2
Trane FCBB020 200 CFM · Fan Coil Indoor ×2
Ventilation
Greenheck SQ-97-VG 100 CFM · Exhaust Fan ×2
SO-97-VG 1,750 CFM · Exhaust Fan ×1
2 projects · most recent 08/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/13/2026Permit IssuedTHE METRO GROUP PLBG LLCWater/Sanitary
09/04/2025Permit IssuedTHE METRO GROUP PLBG LLCGas
14 projects · most recent 07/08/2026
General Wiring
FiledStatusContractorScope
07/08/2026Permit IssuedH. & L. ELECTRIC INCGeneral Wiring
03/31/2026Permit IssuedTHE METRO GROUP ELECTRICGeneral Wiring
01/28/2026Permit IssuedBOROWIDE ELECT'L CONTR'S—
12/16/2025Permit IssuedNEE ELECTRICAL, LLC—
10/21/2025CompleteH. & L. ELECTRIC INCGeneral Wiring
11/19/2024CompleteC.FALCO ELETL CONT CORP—
03/20/2024CompleteC.FALCO ELETL CONT CORPGeneral Wiring
06/26/2023CompleteC.FALCO ELETL CONT CORPGeneral Wiring
04/20/2023CompleteANTHONY G FERRY INC—
06/27/2022CompleteNASH ELECTRIC SERVICES IN—
06/27/2022CompleteNASH ELECTRIC SERVICES IN—
06/14/2022CompleteH. & L. ELECTRIC INCGeneral Wiring
03/15/2022CompleteTOP SHELF ELECTRIC CORP—
07/09/2021CompleteBIG SHOT ELECTRIC CORP.General Wiring
2 projects · most recent 07/28/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/28/2026Permit IssuedANDAMIO SCAFFOLDING LLCScaffold
07/21/2026Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/28/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/15/2025Pass-Final Boiler Equipment Withdrawal InspectionPassView ↗
08/06/2024Pass-Final PL - UndergroundPassView ↗
08/31/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
07/23/2026FinalAnnabelle Selldorfprogress
07/23/2026Fire-Resistant Penetrations and JointsAri Kamospecial
04/28/2026FinalAri Kamoprogress
04/28/2026Post-installed AnchorsAri Kamospecial
04/28/2026Heating SystemsAri Kamospecial
04/28/2026Mechanical SystemsAri Kamospecial
04/13/2026Maintenance informationchristopher konoskienergy_progress
04/13/2026Ventilation and air distribution systemchristopher konoskienergy_progress
04/13/2026Duct leakage testing, insulation and designchristopher konoskienergy_progress
04/13/2026Fire-Resistant Penetrations and Jointschristopher konoskispecial
04/13/2026Mechanical Systemschristopher konoskispecial
04/13/2026Energy Code Compliance Inspectionschristopher konoskiprogress
04/13/2026Finalchristopher konoskiprogress
03/17/2026Post-installed AnchorsAri Kamospecial
03/17/2026FinalNathanael Morejonprogress
03/03/2026Post-installed Anchors—special
03/03/2026Final—progress
07/29/2025Post-installed AnchorsAri Kamospecial
07/29/2025Fire-Resistant Penetrations and JointsAri Kamospecial
05/29/2024Heating SystemsAri Kamospecial
05/29/2024Fire-Resistant Penetrations and JointsAri Kamospecial
05/29/2024Post-installed AnchorsAri Kamospecial
05/20/2024Post-installed AnchorsAri Kamospecial
05/20/2024FinalERIN FISHERprogress
01/18/2024Post-installed AnchorsAri Kamospecial
Latest 25 of 35.
▾Documents — 295 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch37
09/06/2026M00690704-I1Request digital key ↗
09/02/2026M00699381-I1Request digital key ↗
09/02/2026M00699384-I1Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00363376-I1Request digital key ↗
09/04/2026M00363376-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00427088-I1Request digital key ↗
09/04/2026M00427088-P1Request digital key ↗
▸Applications & Permits46
▸DOB NOWLPC Approval/Permit23
08/21/2026M01268869-I1Open ↗
08/17/2026M01393937-P1Open ↗
08/17/2026M01393937-P2Open ↗
Showing 3 of 23 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
11/27/2019104360282Open ↗
03/15/2019104360282Open ↗
03/05/2019102078396Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION7
03/26/2019104360282Open ↗
08/04/2017122730376Open ↗
08/04/2017122730376Open ↗
Showing 3 of 7 on file for this type
▸BISPLACE OF ASSEMBLY2
01/28/2020122786093Open ↗
06/28/2016122786093Open ↗
▸BISPLACE OF ASSEMBLY SIGN OFF1
01/28/2020122786093Open ↗
▸Seals & Professional Certifications84
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/04/2026M00363376-I1Open ↗
09/04/2026M00363376-P1Open ↗
09/04/2026M00427088-I1Open ↗
Showing 3 of 40 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
01/28/2020122786093Open ↗
11/27/2019122786093Open ↗
03/05/2019102078396Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M01048685-S1Open ↗
09/01/2026M00866816-P2Open ↗
09/01/2026M01393937-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M00866816-P2Open ↗
09/01/2026M01393937-S1Open ↗
09/01/2026M01268869-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/05/2019102078396Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/05/2019102078396Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/03/2019104360282Open ↗
04/18/2016122730376Open ↗
04/08/2016122730376Open ↗
▸BISEQUIPMENT USE PERMITS1
05/02/2018122730376Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/02/2018122730376Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
09/04/2026M00363376-I1Open ↗
09/04/2026M00363376-P1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/05/2016122730376Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/04/2026M00427088-P1Open ↗
09/04/2026M00427088-I1Open ↗
08/31/2026M00833134-I1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/14/2010120491538Open ↗
08/12/2010120438160Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/06/2016122730376Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/31/2026M00866816-I1Open ↗
▸Energy Compliance2
▸BISENERGY CODE 1ST REVIEW COMPLETE2
04/29/2016122730376Open ↗
04/08/2016122730376Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
03/11/2019102078396Open ↗
▸Approvals, Objections & Sign-offs51
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter24
08/31/2026M00800386-I1Open ↗
08/31/2026M00866816-I1Open ↗
08/31/2026M00866816-P1Open ↗
Showing 3 of 24 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
02/04/2021104360282Open ↗
10/26/2020104360282Open ↗
07/28/2020104360282Open ↗
Showing 3 of 12 on file for this type
▸BISLANDMARKS APPROVAL5
02/25/2020120491538Open ↗
05/02/2018122730376Open ↗
08/19/2016122786093Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/11/2020104360282Open ↗
01/28/2020122786093Open ↗
01/27/2020102811502Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF2
07/02/2020120491538Open ↗
02/21/2020104360282Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
10/14/2010120491538Open ↗
08/12/2010120438160Open ↗
▸BISSUPERSEDING LETTER1
11/27/2019104360282Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/21/2026M01268869-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
06/24/2025104360282Open ↗
07/02/2020120491538Open ↗
02/25/2020120491538Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/24/2025104360282Open ↗
▸Filing & Intake Forms19
▸BISBOROUGH INTAKE FORM8
04/20/2020104360282Open ↗
02/25/2020120491538Open ↗
01/27/2020102811502Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
03/11/2020104360282Open ↗
04/02/2019104360282Open ↗
04/17/2018122730376Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
04/08/2016122730376Open ↗
04/06/2016122730376Open ↗
04/06/2016122730376Open ↗
Showing 3 of 5 on file for this type
▸Other Documents12
▸DOB NOWProof of Historic Building12
08/21/2026M01268869-I1Open ↗
08/13/2026M00690704-I1Open ↗
08/13/2026M00801533-I1Open ↗
Showing 3 of 12 on file for this type