← Back
Building
1048 FLUSHING AVENUE
BIN 3838398
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanical
Roof8p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Penthouse2p · 1 filing · 20 docs
Floor 41p · 1 filing · 8 docs
Floor 33p · 2 filings · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 11p · 1 filing · 8 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY BUILDERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHER ARCHITECT408/27/2024
ASHRAF CORP208/22/2023
NY BUILDING ASSOCIATES INC102/17/2023
ZEE STRUCTURAL ENGINEERING601/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC PERMIT SERVICES1403/21/2026
XH&RC PLUMBING AND HEATING INC603/21/2026
MISTER EXPEDITER103/21/2026
DANICO SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GBI CONTRACTING, LLCGeneral Contractor707/08/2026
RRP PLUMBING CORPFire Protection207/08/2026
ASSURED BUILDERS INCGeneral Contractor207/08/2026
BEN MANAGEMENT 1 CORPGeneral Contractor107/08/2026
LAKHI GENERAL CONTRACTORGeneral Contractor107/08/2026
MOD CONSULTANTS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519808/27/2024
HRF SERVICES CORP5616108/22/2023
Building Lifecycle
All (64)Filed (13)Permit Issued (12)Signed Off (6)Inspection (2)Objection (1)Special Inspection (30)
06/30/2025
Signed off — New Building
PAA for proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI) scope of work
B00685330-S2
06/17/2025
Permit issued — Mechanical Systems
B00685330-S2-MS
04/29/2025
Signed off — Alteration
Filing For Soe work in concoction with NB job#B00685330
B00743156-I1
02/28/2025
Signed off — Alteration
Filing For Foundation work in concoction with NB job#B00685330
B00743134-S1
02/27/2025
Signed off — Alteration
Installing 8 foot high construction fence around property
B00747738-I1
02/27/2025
Signed off — Alteration
Filing For Foundation work in concoction with NB job#B00685330
B00743134-I1
10/28/2024
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
B00833470-I1
09/26/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/23/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
09/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
09/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
09/09/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
09/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
09/09/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
09/09/2024
Special inspection requirement — Preliminary
Younes Abouyaala
09/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/09/2024
Special inspection requirement — Final
NAVEEN KUMAR
09/09/2024
Special inspection requirement — Shutoff dampers
Younes Abouyaala
08/27/2024
Filed — New Building
PAA for proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI) scope of work
B00685330-P4
08/15/2024
Filed — New Building
PAA for proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI) scope of work
B00685330-P3
07/23/2024
Special inspection requirement — Maintenance information
Younes Abouyaala
07/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
07/23/2024
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/23/2024
Special inspection requirement — Air barrier — testing
Younes Abouyaala
07/23/2024
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/23/2024
Special inspection requirement — Exterior lighting power
Younes Abouyaala
07/23/2024
Special inspection requirement — Interior lighting power
Younes Abouyaala
07/23/2024
Special inspection requirement — Lighting controls
Younes Abouyaala
07/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/23/2024
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
07/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
07/23/2024
Special inspection requirement — Metering
Younes Abouyaala
07/23/2024
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/23/2024
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
07/23/2024
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
07/03/2024
Filed — New Building
PAA for proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI) scope of work
B00685330-P2
07/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/15/2024
Permit issued — Sprinklers
B00685330-S1-EW-SP
08/23/2023
Permit issued — Supported Scaffold
B00917115-I1-SF
08/22/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00917115-I1
06/19/2023
Filed — New Building
PAA for proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI) scope of work
B00685330-P1
05/31/2023
Permit issued — Construction Fence
B00747738-I1-FN
04/27/2023
Permit issued — Sprinklers
B00685330-S1-EW-SP
02/27/2023
Permit issued — Sidewalk Shed
B00833470-I1-SH
02/24/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
B00833470-I1
02/17/2023
Filed — New Building
PAA for proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI) scope of work
B00685330-S2
01/29/2023
Filed — Alteration
Filing For Foundation work in concoction with NB job#B00685330
B00743134-P1
09/15/2022
Permit issued — Support of Excavation
B00743156-I1-SE
09/14/2022
Permit issued — Structural
B00743134-S1-ST
09/01/2022
Filed — Alteration
Filing For Foundation work in concoction with NB job#B00685330
B00743134-S1
08/04/2022
Objection raised — Zoning
07/27/2022
Filed — Alteration
Structural work type filed in conjunction with NB job number B00685330
B00769266-I1
07/13/2022
Permit issued — Support of Excavation
B00743156-I1-SE
07/13/2022
Permit issued — Construction Fence
B00747738-I1-FN
06/14/2022
Permit issued — Foundation
B00743134-I1-FO
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMOD CONSULTANTS LLC06/17/2025
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.05/15/2024
DOB NOWSupported ScaffoldPermit IssuedGBI CONTRACTING, LLC08/23/2023
DOB NOWConstruction FenceSigned-offGBI CONTRACTING, LLC05/31/2023
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.04/27/2023
DOB NOWSidewalk ShedSigned-offLAKHI GENERAL CONTRACTOR02/27/2023
DOB NOWSupport of ExcavationSigned-offASSURED BUILDERS INC09/15/2022
DOB NOWStructuralSigned-offGBI CONTRACTING, LLC09/14/2022
DOB NOWSupport of ExcavationSigned-offGBI CONTRACTING, LLC07/13/2022
DOB NOWConstruction FenceSigned-offBEN MANAGEMENT 1 CORP07/13/2022
DOB NOWFoundationSigned-offGBI CONTRACTING, LLC06/14/2022
DOB NOWConstruction FenceSigned-offASSURED BUILDERS INC06/10/2022
1 project · most recent 04/05/2023
General Wiring Lighting
FiledStatusContractorScope
04/05/2023CompleteSAFEWAY CONSTRUCTION, INCGeneral Wiring, Lighting
1 project · most recent 07/27/2022
Steel Concrete Masonry
FiledStatusContractorScope
07/27/2022——Steel, Concrete, Masonry
1 project · most recent 08/22/2023
Scaffold
FiledStatusContractorScope
08/22/2023Permit IssuedGBI CONTRACTING, LLCScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/23/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
09/09/2024Mechanical SystemsYounes Abouyaalaspecial
09/09/2024Maintenance informationYounes Abouyaalaenergy_progress
09/09/2024Shutoff dampersYounes Abouyaalaenergy_progress
09/09/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
09/09/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
09/09/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
09/09/2024PreliminaryYounes Abouyaalaprogress
09/09/2024FinalNAVEEN KUMARprogress
09/09/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/09/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/23/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/23/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/23/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/23/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/23/2024Exterior lighting powerYounes Abouyaalaenergy_progress
07/23/2024Fenestration air leakageYounes Abouyaalaenergy_progress
07/23/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
07/23/2024Fenestration areasYounes Abouyaalaenergy_progress
07/23/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/23/2024Air barrier — testing Younes Abouyaalaenergy_progress
07/23/2024Lighting in dwelling unitsYounes Abouyaalaenergy_progress
07/23/2024MeteringYounes Abouyaalaenergy_progress
07/23/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/23/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/23/2024Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
Latest 25 of 69.
▾Documents — 121 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/29/2026B00743134-P1Request digital key ↗
08/29/2026B00743134-S1Request digital key ↗
08/29/2026B00743134-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00685330-P4Open ↗
08/13/2026B00685330-P6Open ↗
08/13/2026B00685330-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B00685330-P6Open ↗
08/13/2026B00685330-P4Open ↗
08/13/2026B00685330-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00685330-I1Open ↗
▸Seals & Professional Certifications65
▸DOB NOWProgress Inspector Seal & Signature41
09/23/2026B00743134-S1Open ↗
09/02/2026B00685330-P2Open ↗
09/01/2026B00685330-P4Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/29/2026B00743134-S1Open ↗
08/29/2026B00747738-I1Open ↗
08/27/2026B00685330-P4Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B00743134-S1Open ↗
09/02/2026B00685330-P2Open ↗
09/01/2026B00685330-P4Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B00685330-P4Open ↗
08/13/2026B00685330-P6Open ↗
08/13/2026B00685330-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/27/2026B00685330-P5Open ↗
08/27/2026B00685330-P4Open ↗
08/27/2026B00685330-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00685330-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00685330-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00685330-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00685330-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00685330-S2Open ↗
▸Other Documents14
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00685330-P1Open ↗
08/13/2026B00685330-P4Open ↗
08/13/2026B00685330-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/27/2026B00685330-P5Open ↗
08/27/2026B00685330-P4Open ↗
08/27/2026B00685330-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026B00685330-P1Open ↗
08/13/2026B00685330-P4Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00743156-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00685330-I1Open ↗