← Back
BuildNYC
Primarily 2 family with 1 store or office
105-07 NORTHERN BOULEVARD
QUEENS · East Elmhurst · BIN 4042143
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
R6AZoning
3,610 sfGross Floor Area
3Units
Rent Stabilized7 Active Violations ▸
Primarily 2 family with 1 store or office · 2,207 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11 filing
Site & exterior1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Korman Design & Build409/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kenny Lee Architect403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Korman Design & Buildspecialty_contractor107/08/2026
I Do Plumbing & HeatingPlumbing107/08/2026
De Jesus Stucco & GeneralGeneral Contractor107/29/2013
Ideal Fire ControlFire Protection107/15/1992
Master Fire Prevention SystemFire Protection110/13/2005
Precision Plumbing ServicesPlumbing108/30/2013
TW Plumbing & HeatingPlumbing109/02/2014
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Korman Design & Build2055409/29/2022
Building Lifecycle
05/07/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
12/03/2025
Boiler inspection report filed
Initial · no defects · Accepted
06/12/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
12/02/2024
Boiler inspection report filed
Initial · no defects · Accepted
12/02/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
64 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Korman Design & Build—
DOB NOW—I Do Plumbing & Heating—
BIS—TW Plumbing & Heating—
BIS—Precision Plumbing Services—
BIS—De Jesus Stucco & General—
BIS—Master Fire Systems—
BIS—Ideal Fire Control—
BIS—W.C.L. Construction—
BIS—W.C.L. Construction—
Nothing on file for this building.
Nothing on file for this building.
86 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account