← Back
Three families
105 1/2 ROGERS AVENUE
BROOKLYN · Crown Heights (North) · BIN 3031190
💬 Discuss this project
1930Year Built
3Stories
C0Building Class
R6AZoning
2,565 sfGross Floor Area
3Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 105 A ROGERS LLC · 1,703 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Roof9p · 1 filing · 15 docs
Floor 39p · 2 filings · 20 docs
Floor 211p · 2 filings · 20 docs
Floor 110p · 2 filings · 20 docs
Cellar10p · 2 filings · 20 docs
Site & exterior3p · 1 filing · 2 docs
Filed — no permit issued4p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
105 A ROGERS LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/22/2015$710K—Private party → 105A ROGERS AVE CORP$277/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KING DAVID ARCHITECTURE PC706/03/2024
ASHRAF CORP104/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STATELINE BUILDERS INCGeneral Contractor903/21/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
LAKHI GENERAL CONTRACTORGeneral Contractor107/08/2026
MORELL BUILDERS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616606/03/2024
Building Lifecycle
All (73)Filed (8)Permit Issued (7)Signed Off (1)Violation (21)Inspection (6)Special Inspection (30)
05/05/2026
Violation issued (HPD, closed)
A
06/10/2025
Violation issued (HPD, closed)
A
02/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/29/2025
Permit issued — Plumbing
B00772564-I1-PL
11/27/2024
Violation issued (HPD, closed)
I
10/23/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/12/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
06/12/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/12/2024
Special inspection requirement — Final
FAHAD FATEH
06/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
06/12/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
06/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
06/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
06/03/2024
Filed — Alteration
FILING FOR MECHANICAL WORK IN CONJUNCTION W/ DOB# B00746393-I1
B00772570-P1
05/28/2024
Permit issued — General Construction
B00746393-I1-GC
05/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
05/28/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/28/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/28/2024
Special inspection requirement — Final
FAHAD FATEH
05/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
05/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
05/28/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
04/11/2024
Violation issued (HPD, closed)
A
04/08/2024
Filed — Alteration
FILING PLUMBING WORKTYPE IN CONJUNCTION W/ DOB# B00746393-I1
B00772564-P1
03/19/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/19/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
03/19/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
03/19/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/19/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
03/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
03/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/04/2024
Filed — Alteration
SCOPE OF WORK: PROPOSED INTERIOR RENOVATIONS FOR EXISTING 3 FAMILY 3 STORY BUILDING WITH CELLAR. NO CHANGE IN OCCUPANCY, USE, EGRESS. And to address violation number V 073120CE0801DG AND ECB VIOLATION# 35499805K
B00746393-P2
02/29/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
02/29/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/29/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
02/29/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
02/29/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
11/08/2023
Permit issued — General Construction
B00746393-I1-GC
09/01/2023
Signed off — Alteration
INSTALLATION HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. HEAVY DUTY SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUIILDING CODE.
B00860374-I1
05/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2023
Permit issued — Sidewalk Shed
B00860374-I1-SH
04/20/2023
Filed — Alteration
INSTALLATION HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. HEAVY DUTY SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUIILDING CODE.
B00860374-I1
03/24/2023
Violation issued (HPD, closed)
A
03/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/09/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/27/2022
Permit issued — Plumbing
B00772564-I1-PL
11/14/2022
Permit issued — General Construction
B00746393-I1-GC
09/28/2022
Permit issued — General Construction
B00746393-I1-GC
09/04/2022
Filed — Alteration
SCOPE OF WORK: PROPOSED INTERIOR RENOVATIONS FOR EXISTING 3 FAMILY 3 STORY BUILDING WITH CELLAR. NO CHANGE IN OCCUPANCY, USE, EGRESS. And to address violation number V 073120CE0801DG AND ECB VIOLATION# 35499805K
B00746393-P1
08/18/2022
Filed — Alteration
FILING PLUMBING WORKTYPE IN CONJUNCTION W/ DOB# B00746393-I1
B00772564-I1
08/18/2022
Filed — Alteration
FILING FOR MECHANICAL WORK IN CONJUNCTION W/ DOB# B00746393-I1
B00772570-I1
06/15/2022
Filed — Alteration
SCOPE OF WORK: PROPOSED INTERIOR RENOVATIONS FOR EXISTING 3 FAMILY 3 STORY BUILDING WITH CELLAR. NO CHANGE IN OCCUPANCY, USE, EGRESS. And to address violation number V 073120CE0801DG AND ECB VIOLATION# 35499805K
B00746393-I1
03/01/2022
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
I
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC01/29/2025
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC05/28/2024
DOB NOWGeneral ConstructionPermit IssuedSTATELINE BUILDERS INC11/08/2023
DOB NOWSidewalk ShedSigned-offLAKHI GENERAL CONTRACTOR04/21/2023
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC12/27/2022
DOB NOWGeneral ConstructionPermit IssuedSTATELINE BUILDERS INC11/14/2022
DOB NOWGeneral ConstructionPermit IssuedSTATELINE BUILDERS INC09/28/2022
1 project · most recent 06/03/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2024——Ventilation Systems
Ventilation
Ventline V2262-100 75 CFM · Exhaust Fan ×5
Gree GMV-36WL/C-T(U) 36,000 BTU · Vrf Outdoor ×3
GMV-24WL/C-T(U) 24,000 BTU · Vrf Outdoor ×1
Panasonic FV-15VQ5 150 CFM · Exhaust Fan ×3
1 project · most recent 04/08/2024
Gas Water/Sanitary
FiledStatusContractorScope
04/08/2024Permit IssuedORBIT PLBG & HTG INCGas, Water/Sanitary
2 projects · most recent 11/14/2023
General Wiring
FiledStatusContractorScope
11/14/2023Permit IssuedK.N.C ELECTRIC INC—
02/22/2023CompleteRONEY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/23/2024Fail-Final General Construction Non-Directive 14FailView ↗
05/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
06/12/2024Mechanical SystemsFAHAD FATEHspecial
06/12/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
06/12/2024FinalFAHAD FATEHprogress
06/12/2024HVAC-R and service water piping design and insulation—energy_progress
06/12/2024Shutoff dampersFAHAD FATEHenergy_progress
06/12/2024HVAC-R and service water heating equipment—energy_progress
06/12/2024HVAC-R and service water heating system controls—energy_progress
05/28/2024HVAC-R and service water heating system controls—energy_progress
05/28/2024Mechanical SystemsFAHAD FATEHspecial
05/28/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
05/28/2024FinalFAHAD FATEHprogress
05/28/2024HVAC-R and service water heating equipment—energy_progress
05/28/2024HVAC-R and service water piping design and insulation—energy_progress
05/28/2024Shutoff dampersFAHAD FATEHenergy_progress
03/19/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
03/19/2024Exterior lighting powerFAHAD FATEHenergy_progress
03/19/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
03/19/2024Interior lighting powerFAHAD FATEHenergy_progress
03/19/2024Lighting controlsFAHAD FATEHenergy_progress
03/19/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/19/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
03/19/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/29/2024Exterior lighting powerFAHAD FATEHenergy_progress
02/29/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/29/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 38.
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/28/2026B00772570-I1Request digital key ↗
08/28/2026B00772570-P1Request digital key ↗
08/27/2026B00860374-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026B00772570-P1Open ↗
08/28/2026B00772570-I1Open ↗
08/27/2026B00860374-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B00746393-I1Open ↗
08/29/2026B00772570-I1Open ↗
08/29/2026B00772570-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00746393-I1Open ↗
08/29/2026B00772570-I1Open ↗
08/28/2026B00746393-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B00772570-P1Open ↗
08/28/2026B00772570-I1Open ↗
08/25/2026B00746393-P1Open ↗
Showing 3 of 7 on file for this type