← Back
Two stories - detached, small or mid-size
105-17 103 DRIVE
QUEENS · BIN 4201591
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R4-1Zoning
1,429 sfGross Floor Area
1Units
4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,367 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/21/2020$750K—Private party → Private party$525/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP405/24/2024
TABRIZ GROUP ENTERPRISES108/01/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WCK ELECTRIC CORP.Electrical103/22/2026
VIC CONSTRUCTION LLCGeneral Contractor107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275405/24/2024
Building Lifecycle
All (34)Filed (5)Permit Issued (2)Signed Off (2)Violation (10)Inspection (4)Objection (6)Special Inspection (5)
01/27/2025
Signed off — Alteration
Q00771533-I1
06/20/2024
Signed off — Alteration
NEW THREE-PIECE BATHROOM FIXTURES, REPLACEMENT OF KITCHEN APPLIANCE LINE WITH WASHER AND DRYER, AND CORRECT VIOLATIONS# 35413821K; 35413822M; 35565734P; 35567138H; 35569164K AND DOB VIOLATION #061821C10JK02
Q01008512-I1
05/24/2024
Filed — Alteration
NEW THREE-PIECE BATHROOM FIXTURES, REPLACEMENT OF KITCHEN APPLIANCE LINE WITH WASHER AND DRYER, AND CORRECT VIOLATIONS# 35413821K; 35413822M; 35565734P; 35567138H; 35569164K AND DOB VIOLATION #061821C10JK02
Q01008512-P2
05/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
04/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
04/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/08/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/26/2024
Permit issued — Plumbing
Q01008512-I1-PL
03/04/2024
Filed — Alteration
NEW THREE-PIECE BATHROOM FIXTURES, REPLACEMENT OF KITCHEN APPLIANCE LINE WITH WASHER AND DRYER, AND CORRECT VIOLATIONS# 35413821K; 35413822M; 35565734P; 35567138H; 35569164K AND DOB VIOLATION #061821C10JK02
Q01008512-P1
02/26/2024
Filed — Alteration
NEW THREE-PIECE BATHROOM FIXTURES, REPLACEMENT OF KITCHEN APPLIANCE LINE WITH WASHER AND DRYER, AND CORRECT VIOLATIONS# 35413821K; 35413822M; 35565734P; 35567138H; 35569164K AND DOB VIOLATION #061821C10JK02
Q01008512-I1
11/01/2022
Permit issued — General Construction
Q00771533-I1-GC
08/02/2022
Objection raised — Inspections
08/02/2022
Objection resolved — Addressed
08/02/2022
Objection raised — Scope
08/02/2022
Objection resolved — Addressed
08/02/2022
Objection raised — Scope
08/02/2022
Objection resolved — Addressed
08/01/2022
Filed — Alteration
Q00779788-I1
08/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
07/28/2022
Filed — Alteration
Q00771533-I1
07/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
07/08/2022
Special inspection requirement — Final
HARI SONI
02/14/2022
Violation issued (ECB, open)
Construction
12/16/2021
Violation issued (ECB, closed)
Construction
11/04/2021
Violation issued (ECB, closed)
Construction
09/15/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/21/2021
Violation issued (ECB, open)
Unknown
06/21/2021
Violation issued (ECB, open)
Construction
01/27/2018
Violation issued (ECB, closed)
Construction
12/07/2017
Violation issued (ECB, closed)
Zoning
10/03/1999
Violation issued (ECB, closed)
Quality of Life
10/03/1999
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC03/26/2024
DOB NOWGeneral ConstructionSigned-offVIC CONSTRUCTION LLC11/01/2022
BISOTISSUEDPATRIOT ENERGY SOL CO10/23/2018
BISOTISSUEDRNSS GENERAL CONSTRUCTION02/21/2018
1 project · most recent 08/01/2022
Gas Water/Sanitary
FiledStatusContractorScope
08/01/2022——Gas, Water/Sanitary
1 project · most recent 01/16/2019
FiledStatusContractorScope
01/16/2019CompleteWCK ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/24/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
04/30/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
08/01/2022Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
07/22/2022Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
07/08/2022FinalHARI SONIprogress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00771533-I1Request digital key ↗
08/22/2026Q01008512-I1Request digital key ↗
08/22/2026Q01008512-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
08/17/2018440502591Open ↗
02/21/2018421604464Open ↗
▸BISWORK PERMIT APPLICATION2
10/23/2018440502591Open ↗
02/23/2018421604464Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026Q01008512-I1Open ↗
08/13/2026Q01008512-P1Open ↗
08/13/2026Q01008512-P2Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026Q01008512-I1Open ↗
08/22/2026Q01008512-P2Open ↗
08/22/2026Q01008512-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026Q00779788-I1Open ↗
08/26/2026Q01008512-P2Open ↗
08/22/2026Q01008512-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00771533-I1Open ↗
09/01/2026Q00771533-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/21/2018421604464Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/17/2018440502591Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/21/2018421604464Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/21/2018421604464Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
08/17/2018440502591Open ↗
02/21/2018421604464Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/22/2026Q01008512-P2Open ↗
08/22/2026Q01008512-P1Open ↗
08/22/2026Q01008512-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/17/2018440502591Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/16/2020440502591Open ↗
08/17/2018440502591Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/17/2018440502591Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
01/16/2020440502591Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/16/2020440502591Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/16/2020440502591Open ↗
08/17/2018440502591Open ↗
▸Approvals, Objections & Sign-offs3
▸BISUtility Company PV System Interconnection Acknowledgement Letter2
01/16/2020440502591Open ↗
01/14/2020440502591Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/16/2020440502591Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/16/2020440502591Open ↗
08/17/2018440502591Open ↗
02/21/2018421604464Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
10/22/2018440502591Open ↗
09/24/2018440502591Open ↗
08/27/2018440502591Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/17/2018440502591Open ↗
▸BISEFILING COVER SHEET1
02/21/2018421604464Open ↗