← Back
Two stories - detached, small or mid-size
105-18 31 AVENUE
QUEENS · BIN 4041615
💬 Discuss this project
2005Year Built
2.5Stories
A1Building Class
R3XZoning
2,800 sfGross Floor Area
1Units
1 Open Violation ▸
Two stories - detached, small or mid-size · 3,192 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMERICAN HOME MORTGAGE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANGELO F. LIARIKOS, ARCHITECT701/25/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZICKLIN CONTRACTING CORPGeneral Contractor1007/08/2026
SMART PLBG & HTG CORPPlumbing807/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JSPECS,INC9429301/25/2024
MACIA INSPECTION & TESTIN402401/25/2024
Building Lifecycle
All (54)Filed (7)Permit Issued (7)Signed Off (7)Violation (10)Inspection (12)Special Inspection (11)
10/23/2024
Signed off — Alteration
Q00695316-S1
10/23/2024
Signed off — Alteration
Q00695316-S3
10/23/2024
Signed off — Alteration
Q00695316-S2
10/23/2024
Signed off — Alteration
Q00695316-I1
09/09/2024
Signed off — Alteration
CELLAR: REMOVE EXISTING GAS STOVE AND CAP EXISTING GAS LINE. LEGALIZE EXISTING (1) GAS DRYER AND (1) WASH MACHINE. REMOVE EXISTING KITCHEN SINK AND INSTALL (1) NEW SLOP SINK. LEGALIZE 3 FIXTURE BATHROOM.
Q00697266-S1
09/04/2024
Signed off — Alteration
CELLAR: REMOVE EXISTING GAS STOVE AND CAP EXISTING GAS LINE. LEGALIZE EXISTING (1) GAS DRYER AND (1) WASH MACHINE. REMOVE EXISTING KITCHEN SINK AND INSTALL (1) NEW SLOP SINK. LEGALIZE 3 FIXTURE BATHROOM.
Q00697266-I1
09/04/2024
Signed off — Alteration
CELLAR: REMOVE EXISTING GAS STOVE AND CAP EXISTING GAS LINE. LEGALIZE EXISTING (1) GAS DRYER AND (1) WASH MACHINE. REMOVE EXISTING KITCHEN SINK AND INSTALL (1) NEW SLOP SINK. LEGALIZE 3 FIXTURE BATHROOM.
Q00697266-S2
09/03/2024
Permit issued — General Construction
Q00695316-S2-GC
09/03/2024
Permit issued — General Construction
Q00695316-S3-GC
08/14/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/14/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/03/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/26/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/20/2024
Permit issued — Plumbing
Q00697266-S2-PL
01/25/2024
Filed — Alteration
Q00695316-S3
01/25/2024
Filed — Alteration
CELLAR: REMOVE EXISTING GAS STOVE AND CAP EXISTING GAS LINE. LEGALIZE EXISTING (1) GAS DRYER AND (1) WASH MACHINE. REMOVE EXISTING KITCHEN SINK AND INSTALL (1) NEW SLOP SINK. LEGALIZE 3 FIXTURE BATHROOM.
Q00697266-S2
01/12/2024
Special inspection requirement — Final
ANGELO LIARIKOS
01/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
01/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
12/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2023
Filed — Alteration
Q00695316-S2
03/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
03/29/2023
Special inspection requirement — Final
ANGELO LIARIKOS
03/10/2023
Permit issued — General Construction
Q00695316-S1-GC
02/13/2023
Permit issued — General Construction
Q00695316-I1-GC
02/02/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/30/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/29/2022
Permit issued — Plumbing
Q00697266-I1-PL
11/16/2022
Permit issued — Plumbing
Q00697266-S1-PL
07/30/2022
Filed — Alteration
Q00695316-S1
07/30/2022
Filed — Alteration
CELLAR: REMOVE EXISTING GAS STOVE AND CAP EXISTING GAS LINE. LEGALIZE EXISTING (1) GAS DRYER AND (1) WASH MACHINE. REMOVE EXISTING KITCHEN SINK AND INSTALL (1) NEW SLOP SINK. LEGALIZE 3 FIXTURE BATHROOM.
Q00697266-S1
06/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
06/26/2022
Special inspection requirement — Final
ANGELO LIARIKOS
05/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
03/30/2022
Filed — Alteration
Q00695316-I1
03/30/2022
Filed — Alteration
CELLAR: REMOVE EXISTING GAS STOVE AND CAP EXISTING GAS LINE. LEGALIZE EXISTING (1) GAS DRYER AND (1) WASH MACHINE. REMOVE EXISTING KITCHEN SINK AND INSTALL (1) NEW SLOP SINK. LEGALIZE 3 FIXTURE BATHROOM.
Q00697266-I1
03/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
03/09/2022
Special inspection requirement — Final
ANGELO LIARIKOS
03/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
04/26/2010
Violation issued (ECB, closed)
Construction
12/19/2008
Violation issued (ECB, closed)
Construction
09/08/2008
Violation issued (ECB, closed)
Quality of Life
09/08/2008
Violation issued (ECB, closed)
Construction
10/15/2007
Violation issued (ECB, closed)
Construction
10/13/2007
Violation issued (ECB, closed)
Construction
10/06/2007
Violation issued (ECB, closed)
Zoning
09/12/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/02/1996
Violation issued (DOB, closed)
VH*-VIOLATION HAZARDOUS DISMISSED
10/02/1996
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offZICKLIN CONTRACTING CORP09/03/2024
DOB NOWGeneral ConstructionSigned-offZICKLIN CONTRACTING CORP09/03/2024
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP02/20/2024
DOB NOWGeneral ConstructionSigned-offZICKLIN CONTRACTING CORP03/10/2023
DOB NOWGeneral ConstructionSigned-offZICKLIN CONTRACTING CORP02/13/2023
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP11/29/2022
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP11/16/2022
1 project · most recent 12/07/2023
FiledStatusContractorScope
12/07/2023CompleteKINGS ELECTRIC CO., INC.—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/14/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/28/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
01/12/2024FinalANGELO LIARIKOSprogress
01/12/2024Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
01/09/2024Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
03/29/2023Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
03/29/2023FinalANGELO LIARIKOSprogress
06/26/2022Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
06/26/2022FinalANGELO LIARIKOSprogress
05/09/2022Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
03/12/2022Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
03/09/2022FinalANGELO LIARIKOSprogress
03/09/2022Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026Q00695316-S1Request digital key ↗
08/25/2026Q00695316-I1Request digital key ↗
08/25/2026Q00695316-S3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 17
08/13/2026Q00697266-S2Open ↗
08/13/2026Q00697266-I1Open ↗
08/13/2026Q00695316-S3Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q00695316-I1Open ↗
08/25/2026Q00695316-S3Open ↗
08/25/2026Q00695316-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q00697266-S1Open ↗
09/01/2026Q00695316-S2Open ↗
08/31/2026Q00695316-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q00695316-S2Open ↗
08/31/2026Q00695316-S3Open ↗
08/28/2026Q00695316-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026Q00695316-I1Open ↗
08/25/2026Q00695316-S3Open ↗
08/25/2026Q00695316-S2Open ↗
Showing 3 of 7 on file for this type