← Back
Two family converted from one family
105-42 VAN WYCK EXPRESSWAY
QUEENS · South Ozone Park · BIN 4205253
💬 Discuss this project
1915Year Built
2Stories
B3Building Class
R3-2Zoning
1,453 sfGross Floor Area
2Units
3 Open Violations 1 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family converted from one family · 2,500 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneralOther
Filed — no permit issued11p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NS ENGINEERING, P.C.206/29/2026
Building Lifecycle
All (28)Filed (2)Violation (4)Objection (8)Special Inspection (14)
08/10/2026
Objection resolved — Resolved
08/10/2026
Objection resolved — Resolved
07/28/2026
Objection raised — Scope
07/28/2026
Objection raised — Zoning
06/29/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF EXISTING PARTIAL FIRE-DAMAGED 2 STORY BUILDING WITH CELLAR, CONTAINING TWO FAMILY DWELLING UNITS
Q01291089-P1
06/25/2026
Special inspection requirement — Structural Wood Frame
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/25/2026
Special inspection requirement — Energy Code Compliance Inspections
06/25/2026
Special inspection requirement — Final
06/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/25/2026
Special inspection requirement — Preliminary
03/10/2026
Violation issued (ECB, open)
Construction
03/10/2026
Violation issued (ECB, open)
Construction
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
12/17/2025
Objection raised — Building
12/17/2025
Objection raised — Zoning
11/25/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF EXISTING PARTIAL FIRE-DAMAGED 2 STORY BUILDING WITH CELLAR, CONTAINING TWO FAMILY DWELLING UNITS
Q01291089-I1
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/14/2025
Special inspection requirement — Energy Code Compliance Inspections
10/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
10/14/2025
Special inspection requirement — Preliminary
10/14/2025
Special inspection requirement — Structural Wood Frame
09/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/22/2025
Special inspection requirement — Final
10/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Nothing on file for this building.
1 project · most recent 06/29/2026
Wood
FiledStatusContractorScope
06/29/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
06/25/2026Structural Wood Frame—progress
06/25/2026Fire-Resistant Penetrations and Joints—special
06/25/2026Structural Stability – Alterations of existing buildings—special
06/25/2026Energy Code Compliance Inspections—progress
06/25/2026Final—progress
06/25/2026Fire-Resistance Rated Construction—progress
06/25/2026Preliminary—progress
10/29/2025Fire-Resistant Penetrations and Joints—special
10/14/2025Energy Code Compliance Inspections—progress
10/14/2025Fire-Resistance Rated Construction—progress
10/14/2025Preliminary—progress
10/14/2025Structural Wood Frame—progress
09/22/2025Structural Stability – Alterations of existing buildings—special
09/22/2025Final—progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026Q01291089-I1Request digital key ↗
08/15/2026Q01291089-P1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026Q01291089-P1Open ↗
08/13/2026Q01291089-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026Q01291089-P1Open ↗
08/13/2026Q01291089-I1Open ↗