Rent Stabilized2 Open Violations 1 unresolved · 1 paperwork only▸
DOB01/18/2006VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
ECB08/08/2006FAILURE TO SAFEGUARD PUBLIC & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. NOTED: @ TIME OF INSPECTION CONSTRUCTION ACTIVITY IN PROGRESS (VARIOUS TRADES). THE REQUIRED 8 FT CONSTRUCTION FENCE WAS INADEQUATENothing owed — awaiting certificate of correction
Two family brick · 3,641 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.