← Back
QUEENS
105-71 130 STREET
QUEENS · BIN 4625962
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES304/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ GROUP ENTERPRISE103/21/2026
Building Lifecycle
All (38)Filed (3)Objection (13)Special Inspection (22)
05/10/2026
Objection raised — Structural
05/10/2026
Objection raised — Structural
05/10/2026
Objection raised — Other
04/23/2026
Filed — New Building
PROPOSED 10 FEET CURB CUT INCLUDING SPLAYS.
Q01361109-S1
04/23/2026
Objection raised — Scope
04/13/2026
Filed — New Building
PROPOSED 10 FEET CURB CUT INCLUDING SPLAYS.
Q01361109-S2
03/27/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
03/27/2026
Objection resolved — Addressed
03/08/2026
Objection raised — Other
03/08/2026
Objection raised — Other
03/08/2026
Objection raised — Other
03/08/2026
Objection raised — Inspections
03/08/2026
Objection raised — Zoning
03/08/2026
Objection raised — Zoning
02/20/2026
Filed — New Building
PROPOSED 10 FEET CURB CUT INCLUDING SPLAYS.
Q01361109-I1
02/17/2026
Special inspection requirement — Concrete - Cast-In-Place
02/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/17/2026
Special inspection requirement — Masonry
02/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
02/17/2026
Special inspection requirement — Final
02/17/2026
Special inspection requirement — Footing and Foundation
02/17/2026
Special inspection requirement — Energy Code Compliance Inspections
02/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/17/2026
Special inspection requirement — Structural Wood Frame
02/17/2026
Special inspection requirement — Air barrier — testing
02/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/17/2026
Special inspection requirement — Electric vehicle service equipment requirements
02/17/2026
Special inspection requirement — Insulation placement and R values
02/17/2026
Special inspection requirement — Air barrier - visual inspection
02/17/2026
Special inspection requirement — Fenestration areas
02/17/2026
Special inspection requirement — Fenestration air leakage
02/17/2026
Special inspection requirement — Maintenance information
02/17/2026
Special inspection requirement — Permanent certificate
02/17/2026
Special inspection requirement — Interior lighting power
02/17/2026
Special inspection requirement — Metering
Nothing on file for this building.
1 project · most recent 04/23/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
04/23/2026——Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 04/23/2026
Wood
FiledStatusContractorScope
04/23/2026——Wood
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/17/2026Concrete - Cast-In-Place—special
02/17/2026Excavations - Sheeting, Shoring, and Bracing—special
02/17/2026Fire-Resistant Penetrations and Joints—special
02/17/2026Masonry—special
02/17/2026Structural Stability – Alterations of existing buildings—special
02/17/2026Subsurface Investigations (Borings/Test Pits)—special
02/17/2026Final—progress
02/17/2026Footing and Foundation—progress
02/17/2026Energy Code Compliance Inspections—progress
02/17/2026Fire-Resistance Rated Construction—progress
02/17/2026Structural Wood Frame—progress
02/17/2026Air barrier — testing —energy_progress
02/17/2026Fenestration and door U-factor and product ratings—energy_progress
02/17/2026Electric vehicle service equipment requirements—energy_progress
02/17/2026Insulation placement and R values—energy_progress
02/17/2026Air barrier - visual inspection—energy_progress
02/17/2026Fenestration areas—energy_progress
02/17/2026Fenestration air leakage—energy_progress
02/17/2026Maintenance information—energy_progress
02/17/2026Permanent certificate—energy_progress
02/17/2026Interior lighting power—energy_progress
02/17/2026Metering—energy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/15/2026Q01361109-I1Request digital key ↗
08/15/2026Q01361109-S1Request digital key ↗
08/14/2026Q01361109-S2Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026Q01361109-I1Open ↗
08/13/2026Q01361109-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01361109-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026Q01361109-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026Q01361109-S2Open ↗
08/17/2026Q01361109-S1Open ↗
08/17/2026Q01361109-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/15/2026Q01361109-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026Q01361109-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/15/2026Q01361109-I1Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/13/2026Q01361109-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01361109-I1Open ↗