Large suburban residence
105 ANNFIELD COURT
💬 Discuss this project
1980Year Built
2Stories
A3Building Class
R1-1Zoning
3,200 sfGross Floor Area
1Units
Large suburban residence · 21,625 sf lot · 0.15 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 26p · 1 filing · 14 docs
Floor 15p · 1 filing · 14 docs
Sub-Basement5p · 1 filing · 14 docs
Site & exterior3p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES V MORRI308/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAMES V MORRI, RA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORNINGSTAR BUILDING CORP.General Contractor107/08/2026
RITE-FLO P.H.& COOLING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES V MORRI, RA1042103/26/2021
Building Lifecycle
All (24)Filed (3)Permit Issued (2)Signed Off (2)Special Inspection (17)
10/22/2021
Signed off — Alteration
INSTALLATION OF NEW WATER/SANITARY AND GAS PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION INITIAL FILING. NEW GAS METER AND SERVICE TO RESIDENCE
S00478438-I1
09/29/2021
Signed off — Alteration
INSTALLATION OF NEW WATER/SANITARY AND GAS PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION INITIAL FILING. NEW GAS METER AND SERVICE TO RESIDENCE
S00478438-S1
08/11/2021
Filed — Alteration
INSTALLATION OF NEW WATER/SANITARY AND GAS PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION INITIAL FILING. NEW GAS METER AND SERVICE TO RESIDENCE
S00478438-P1
04/22/2021
Permit issued — General Construction
S00478438-I1-GC-CX
04/16/2021
Permit issued — Plumbing
S00478438-S1-PL
04/06/2021
Filed — Alteration
INSTALLATION OF NEW WATER/SANITARY AND GAS PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION INITIAL FILING. NEW GAS METER AND SERVICE TO RESIDENCE
S00478438-S1
03/26/2021
Filed — Alteration
INSTALLATION OF NEW WATER/SANITARY AND GAS PLUMBING WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION INITIAL FILING. NEW GAS METER AND SERVICE TO RESIDENCE
S00478438-I1
03/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Morri
03/01/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Morri
03/01/2021
Special inspection requirement — Energy Code Compliance Inspections
James Morri
03/01/2021
Special inspection requirement — Fire-Resistance Rated Construction
James Morri
03/01/2021
Special inspection requirement — Preliminary
James Morri
03/01/2021
Special inspection requirement — Structural Wood Frame
James Morri
03/01/2021
Special inspection requirement — Final
James Morri
03/01/2021
Special inspection requirement — Lighting controls
James Morri
03/01/2021
Special inspection requirement — Air barrier - visual inspection
James Morri
03/01/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
James Morri
03/01/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
James Morri
03/01/2021
Special inspection requirement — Lighting in dwelling units
James Morri
03/01/2021
Special inspection requirement — Fenestration air leakage
James Morri
03/01/2021
Special inspection requirement — Fenestration areas
James Morri
03/01/2021
Special inspection requirement — Maintenance information
James Morri
03/01/2021
Special inspection requirement — Insulation placement and R values
James Morri
03/01/2021
Special inspection requirement — Permanent certificate
James Morri
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMORNINGSTAR BUILDING CORP04/22/2021
DOB NOWPlumbingSigned-offDJ PLUMBING & HEATING COR04/16/2021
1 project · most recent 05/31/2021
General Wiring
FiledStatusContractorScope
05/31/2021CompleteRIDGE ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
03/01/2021Fire-Resistant Penetrations and JointsJames Morrispecial
03/01/2021Structural Stability – Alterations of existing buildingsJames Morrispecial
03/01/2021Energy Code Compliance InspectionsJames Morriprogress
03/01/2021Fire-Resistance Rated ConstructionJames Morriprogress
03/01/2021PreliminaryJames Morriprogress
03/01/2021Structural Wood FrameJames Morriprogress
03/01/2021FinalJames Morriprogress
03/01/2021Lighting controlsJames Morrienergy_progress
03/01/2021Air barrier - visual inspectionJames Morrienergy_progress
03/01/2021HVAC-R and service water piping design and insulationJames Morrienergy_progress
03/01/2021Fenestration and door U-factor and product ratingsJames Morrienergy_progress
03/01/2021Lighting in dwelling unitsJames Morrienergy_progress
03/01/2021Fenestration air leakageJames Morrienergy_progress
03/01/2021Fenestration areasJames Morrienergy_progress
03/01/2021Maintenance informationJames Morrienergy_progress
03/01/2021Insulation placement and R valuesJames Morrienergy_progress
03/01/2021Permanent certificateJames Morrienergy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026S00478438-I1Request digital key ↗
08/25/2026S00478438-P1Request digital key ↗
08/25/2026S00478438-S1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026S00478438-P1Open ↗
08/13/2026S00478438-I1Open ↗
08/13/2026S00478438-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026S00478438-I1Open ↗
08/24/2026S00478438-I1Open ↗
08/24/2026S00478438-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026S00478438-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026S00478438-I1Open ↗
08/13/2026S00478438-P1Open ↗
08/13/2026S00478438-S1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00478438-I1Open ↗