← Back
BuildNYC
Two stories - detached, small or mid-size
105 ARLINGTON AVENUE
STATEN ISLAND · BIN 5028380
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3XZoning
1,368 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 7,250 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential solar electric generation array installation1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Momentum Solar106/26/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV Sia9281106/26/2024
Building Lifecycle
09/30/2024
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
S01069442-I1-SL
06/28/2024
Permit issued — Solar
S01069442-I1-SL
06/26/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 14 Panels, 5.74 kW
S01069442-I1
06/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
06/20/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMomentum Solar06/28/2024
2 projects · most recent 05/27/2025
General Wiring
FiledStatusContractorScope
05/27/2025CompleteRiviera ElectricGeneral Wiring
06/26/2024Permit IssuedIsland Electric—
1 project · most recent 06/26/2024
FiledStatusContractorScope
06/26/2024Permit IssuedMomentum Solar—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/20/2024Fire-Resistant Penetrations and JointsMina Makarspecial
06/20/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
06/20/2024Energy Code Compliance InspectionsMina Makarprogress
06/20/2024FinalMina Makarprogress
06/20/2024Air barrier - visual inspectionMina Makarenergy_progress
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account