← Back
Predominantly retail with other uses
105 ATLANTIC AVENUE
BROOKLYN · BIN 3002710
💬 Discuss this project
1910Year Built
2Stories
K4Building Class
R6Zoning
3,176 sfGross Floor Area
4Units
2 Open Violations 1 unresolved · 1 paperwork only ▸
Predominantly retail with other uses · Owner of record: 105 ATLANTIC LLC · 2,000 sf lot · 1.59 FAR built · Flood zone X
Locations of Work
MechanicalCivilGeneral
Roof1p · 1 filing · 18 docs
Floor 21p · 1 filing · 7 docs
Floor 1
Cellar1p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MUCHMORE PARTNERS907/08/2026
MANAGEMENT707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
D'ANTONIO CONSULTING ENGINEERS103/25/2023
STEEL CORE ENGINEERING PLLC405/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
T SQUARE GROUP803/21/2026
DOMANI CONSULTING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AURORA P & H CONT INCPlumbing307/08/2026
ALL HVAC SERVICE CO. INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D'ANTONIO CONSULTING ENGI931103/25/2023
SHAHRISH SHUVO ENGINEERIN8524103/25/2023
STEEL CORE ENGINEERING PL1098305/16/2022
Building Lifecycle
All (28)Filed (5)Permit Issued (3)Signed Off (3)Violation (6)Inspection (3)Special Inspection (8)
11/24/2025
Violation issued (HPD, open)
I
07/05/2024
Signed off — Alteration
Replacement of existing 2nd floor commercial space packaged vertical a/c unit with new split system. The air handler will be at the existing a/c location, new 5 ton condensing unit to be placed in rear yard. Note: energy exempt
B08007464-I1
06/20/2024
Permit issued — Mechanical Systems
B08007464-I1-MS
11/28/2023
Violation issued (HPD, closed)
I
03/25/2023
Filed — Alteration
Replacement of existing 2nd floor commercial space packaged vertical a/c unit with new split system. The air handler will be at the existing a/c location, new 5 ton condensing unit to be placed in rear yard. Note: energy exempt
B08007464-I1
03/23/2023
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
01/23/2023
Signed off — Alteration
APPLICATION FILED TO REPLACE CELLAR GAS RISER AND FOR INSTALLATION OF HWH AND (1) WEIL McLAIN BOILER TO DISMISS ECB VIOLATION #: 39035230Z. SECOND WEIL McLAIN BOILER SIGNED OFF UNDER LAA B00504952-I1. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
B00504952-I1
11/17/2022
Violation issued (HPD, closed)
I
09/30/2022
Signed off — Alteration
APPLICATION FILED TO REPLACE CELLAR GAS RISER AND FOR INSTALLATION OF HWH AND (1) WEIL McLAIN BOILER TO DISMISS ECB VIOLATION #: 39035230Z. SECOND WEIL McLAIN BOILER SIGNED OFF UNDER LAA B00504952-I1. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
B00504952-S1
09/21/2022
Special inspection requirement — Mechanical Systems
GAETANO D'ANTONIO
09/21/2022
Special inspection requirement — Final
GAETANO D'ANTONIO
06/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2022
Permit issued — Plumbing
B00504952-S1-PL
05/17/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
05/16/2022
Filed — Alteration
APPLICATION FILED TO REPLACE CELLAR GAS RISER AND FOR INSTALLATION OF HWH AND (1) WEIL McLAIN BOILER TO DISMISS ECB VIOLATION #: 39035230Z. SECOND WEIL McLAIN BOILER SIGNED OFF UNDER LAA B00504952-I1. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
B00504952-P2
04/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
04/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
Alexander Sheyman
04/27/2022
Filed — Alteration
APPLICATION FILED TO REPLACE CELLAR GAS RISER AND FOR INSTALLATION OF HWH AND (1) WEIL McLAIN BOILER TO DISMISS ECB VIOLATION #: 39035230Z. SECOND WEIL McLAIN BOILER SIGNED OFF UNDER LAA B00504952-I1. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
B00504952-S1
04/27/2022
Filed — Alteration
APPLICATION FILED TO REPLACE CELLAR GAS RISER AND FOR INSTALLATION OF HWH AND (1) WEIL McLAIN BOILER TO DISMISS ECB VIOLATION #: 39035230Z. SECOND WEIL McLAIN BOILER SIGNED OFF UNDER LAA B00504952-I1. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
B00504952-P1
04/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
Alexander Sheyman
04/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
03/16/2022
Violation issued (HPD, closed)
I
05/14/2021
Permit issued — Boiler Equipment
B00504952-I1-BE
05/11/2021
Filed — Alteration
APPLICATION FILED TO REPLACE CELLAR GAS RISER AND FOR INSTALLATION OF HWH AND (1) WEIL McLAIN BOILER TO DISMISS ECB VIOLATION #: 39035230Z. SECOND WEIL McLAIN BOILER SIGNED OFF UNDER LAA B00504952-I1. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
B00504952-I1
01/21/2021
Violation issued (ECB, open)
Boilers
11/26/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offALL HVAC SERVICE CO. INC06/20/2024
DOB NOWPlumbingSigned-offAURORA P & H CONT INC06/01/2022
DOB NOWBoiler EquipmentSigned-offAURORA P & H CONT INC05/14/2021
BISMHISSUEDCOUSIN JOHN'S CONSTRUCTIO07/06/2016
BISPLISSUEDJUST PLBG & HTG INC04/12/2016
BISOTISSUEDCOUSIN JOHN'S CONSTRUCTIO03/01/2016
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/17/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/23/2023Tenant Protection Plan ComplianceShahrish Shuvospecial
09/21/2022Mechanical SystemsGAETANO D'ANTONIOspecial
09/21/2022FinalGAETANO D'ANTONIOprogress
05/17/2022Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
04/29/2022Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
04/29/2022HVAC-R and service water heating system controlsAlexander Sheymanenergy_progress
04/22/2022HVAC-R and service water heating system controlsAlexander Sheymanenergy_progress
04/22/2022Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00504952-P2Request digital key ↗
09/01/2026B00504952-S1Request digital key ↗
09/01/2026B00504952-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION3
12/01/2016321119124Open ↗
09/15/2015321119124Open ↗
05/18/2015321119124Open ↗
▸BISWORK PERMIT APPLICATION3
07/07/2016321097282Open ↗
04/13/2016321097282Open ↗
03/02/2016321097282Open ↗
▸DOB NOWLPC Approval/Permit2
08/13/2026B08007464-I1Open ↗
08/13/2026B00504952-S1Open ↗
▸Seals & Professional Certifications18
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/02/2016321097282Open ↗
09/02/2016321097282Open ↗
09/02/2016321097282Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00504952-P2Open ↗
09/01/2026B00504952-P1Open ↗
09/01/2026B00504952-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B00504952-I1Open ↗
09/01/2026B08007464-I1Open ↗
09/01/2026B08007464-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B08007464-I1Open ↗
08/26/2026B00504952-P1Open ↗
08/26/2026B00504952-P2Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/18/2015321119124Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/18/2015321119124Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00504952-P2Open ↗
09/01/2026B00504952-P1Open ↗
09/01/2026B00504952-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/15/2015321119124Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/02/2016321097282Open ↗
09/02/2016321097282Open ↗
05/18/2015321119124Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/02/2016321097282Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE2
09/15/2015321119124Open ↗
05/18/2015321119124Open ↗
▸BISLANDMARKS APPROVAL2
09/02/2016321097282Open ↗
01/15/2016321097282Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/18/2015321119124Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/02/2016321097282Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/02/2016321097282Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/18/2015321119124Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
05/18/2015321119124Open ↗