← Back
Elevator apt, semi-fireproof without stores
105 BUCKINGHAM ROAD
BROOKLYN · BIN 3117070
💬 Discuss this project
1937Year Built
6Stories
D1Building Class
R1-2Zoning
66,600 sfGross Floor Area
61Units
LL97 CoveredRent Stabilized24 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: BOMEL REALTY COMPANY LLC · 21,654 sf lot · 3.08 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BOMEL REALTY4807/08/2026
BOMEL RELATY COMPANY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.307/01/2021
BAZINI ENGINEERING, P.C.106/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & C HEATING SERVICES INGeneral Contractor407/08/2026
A & C HTG SERVICES, INCPlumbing207/08/2026
INNER CITY CONTRACTINGElectrical103/21/2026
RONALD TESTA, JR.Electrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851207/01/2021
BAZINI ENGINEERING, P.C.1808106/04/2021
Building Lifecycle
All (96)Filed (4)Permit Issued (8)Signed Off (4)Facade (FISP) (12)Violation (60)Inspection (1)Special Inspection (7)
10/03/2025
Violation issued (HPD, open)
C
10/03/2025
Violation issued (HPD, open)
C
10/03/2025
Violation issued (HPD, closed)
C
10/03/2025
Violation issued (HPD, closed)
A
10/03/2025
Violation issued (HPD, open)
C
10/03/2025
Violation issued (HPD, closed)
C
10/03/2025
Violation issued (HPD, closed)
B
10/03/2025
Violation issued (HPD, open)
C
10/03/2025
Violation issued (HPD, closed)
B
10/03/2025
Violation issued (HPD, closed)
B
10/03/2025
Violation issued (HPD, open)
C
10/03/2025
Violation issued (HPD, closed)
B
10/03/2025
Violation issued (HPD, closed)
B
10/03/2025
Violation issued (HPD, closed)
A
10/03/2025
Violation issued (HPD, closed)
B
10/03/2025
Violation issued (HPD, closed)
B
10/03/2025
Violation issued (HPD, closed)
A
10/03/2025
Violation issued (HPD, open)
B
10/03/2025
Violation issued (HPD, closed)
A
10/03/2025
Violation issued (HPD, closed)
A
10/03/2025
Violation issued (HPD, closed)
C
10/03/2025
Violation issued (HPD, closed)
B
10/03/2025
Violation issued (HPD, closed)
C
06/05/2025
Violation issued (HPD, closed)
A
08/05/2024
Violation issued (HPD, open)
C
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
B
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
C
08/05/2024
Violation issued (HPD, open)
C
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
C
08/05/2024
Violation issued (HPD, open)
B
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
C
08/05/2024
Violation issued (HPD, closed)
A
08/05/2024
Violation issued (HPD, open)
B
08/05/2024
Violation issued (HPD, open)
A
08/05/2024
Violation issued (HPD, open)
C
08/05/2024
Violation issued (HPD, open)
C
08/04/2024
Violation issued (HPD, closed)
C
03/31/2024
Violation issued (HPD, closed)
C
03/31/2024
Violation issued (HPD, closed)
C
03/31/2024
Violation issued (HPD, closed)
C
03/31/2024
Violation issued (HPD, closed)
B
11/24/2023
Violation issued (HPD, closed)
B
11/24/2023
Violation issued (HPD, closed)
B
11/08/2023
Violation issued (HPD, closed)
B
11/08/2023
Violation issued (HPD, closed)
B
11/08/2023
Violation issued (HPD, open)
B
11/08/2023
Violation issued (HPD, open)
B
09/13/2022
Cycle 9 facade report submitted
09/13/2022
Cycle 9 facade report signed — SWARMP
08/01/2022
Cycle 9 facade inspection completed
04/05/2022
Signed off — Alteration
INSTALL CHIMNEY LINER PER PLANS.
B00500623-I1
04/05/2022
Signed off — Alteration
INSTALL CHIMNEY LINER PER PLANS.
B00500623-S1
04/05/2022
Signed off — Alteration
B00500603-I1
02/23/2022
Permit issued — Mechanical Systems
B00500623-S1-MS
02/22/2022
Permit issued — Boiler Equipment
B00500623-I1-BE
01/27/2022
Permit issued — Plumbing
B00500603-I1-PL
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offA & C HEATING SERVICES IN02/23/2022
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC02/22/2022
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP01/27/2022
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ10/29/2021
DOB NOWMechanical SystemsSigned-offA & C HEATING SERVICES IN07/07/2021
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ06/10/2021
DOB NOWBoiler EquipmentSigned-offA&C HEATING SERVICES INC04/28/2021
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP04/23/2021
BISOTISSUEDPROTO RESTORATION CONSTRUCTION07/08/2016
BISEQISSUEDPROTO RESTORATION CONSTRUCTION05/13/2016
BISEQISSUEDPROTO RESTORATION CONSTRUCTION05/12/2016
BISOTISSUEDBOMEL REALTY CO., LLC08/17/2004
BISEQISSUEDTWIN & SWING SCAFFOLDING03/18/2003
BISOTISSUEDS & E BUILDING MAINTENANCE03/04/2003
BISEQISSUEDTWIN SCAFFOLDING04/12/2002
1 project · most recent 06/09/2021
Boiler Controls
FiledStatusContractorScope
06/09/2021Permit IssuedROME ELECTRICAL CONTS INCBoiler Controls
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/15/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/03/2021Mechanical SystemsLOUIS ARENAspecial
05/03/2021Chimneys and ventsLOUIS ARENAspecial
05/03/2021FinalLOUIS ARENAprogress
04/08/2021Maintenance informationLOUIS ARENAenergy_progress
04/08/2021Heating SystemsLOUIS ARENAspecial
04/08/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
04/08/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00500603-I1Request digital key ↗
09/01/2026B00500623-I1Request digital key ↗
09/01/2026B00500623-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION4
07/11/2016321414359Open ↗
05/11/2016340376729Open ↗
04/29/2016340376756Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
07/11/2016321414359Open ↗
05/11/2016340376729Open ↗
04/29/2016340376756Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLPC Approval/Permit2
08/13/2026B00500623-S1Open ↗
08/13/2026B00500603-I1Open ↗
▸Seals & Professional Certifications24
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
12/06/2017321414359Open ↗
04/17/2017340376756Open ↗
04/17/2017340376729Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026B00500623-S1Open ↗
08/25/2026B00500623-I1Open ↗
08/25/2026B00500623-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00500603-I1Open ↗
09/01/2026B00500623-I1Open ↗
09/01/2026B00500623-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B00500623-I1Open ↗
08/25/2026B00500623-S1Open ↗
08/25/2026B00500623-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/11/2016340376729Open ↗
04/29/2016340376756Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/11/2016340376729Open ↗
04/29/2016340376756Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/11/2016340376729Open ↗
04/29/2016340376756Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/18/2010320242885Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/18/2010320242885Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
07/11/2016321414359Open ↗
05/11/2016340376729Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00500603-I1Open ↗
09/01/2026B00500623-S1Open ↗
09/01/2026B00500623-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/18/2010320242885Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/06/2017321414359Open ↗
▸BISASBESTOS INSPECTION REPORT1
07/11/2016321414359Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/06/2017321414359Open ↗
07/11/2016321414359Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/06/2017321414359Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/11/2016340376729Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00500623-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00500623-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/11/2016340376729Open ↗
04/29/2016340376756Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLANDMARKS APPROVAL3
12/06/2017321414359Open ↗
05/11/2016340376729Open ↗
04/29/2016340376756Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/06/2017321414359Open ↗
04/17/2017340376756Open ↗
04/17/2017340376729Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/18/2010320242885Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/06/2017321414359Open ↗
07/11/2016321414359Open ↗
▸Filing & Intake Forms7
▸BISEFILING JOB APPLICATION COVER SHEET2
05/11/2016340376729Open ↗
04/29/2016340376756Open ↗
▸BISADDITIONAL INFORMATION2
05/02/2016340376756Open ↗
11/18/2010320242885Open ↗
▸BISEFILING COVER SHEET2
07/07/2016321414359Open ↗
11/18/2010320242885Open ↗
▸BISBOROUGH INTAKE FORM1
12/06/2017321414359Open ↗