← Back
BuildNYC
Two stories - detached, small or mid-size
105 CUBA AVENUE
STATEN ISLAND · BIN 5055743
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R3-1Zoning
1,999 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,040 sf lot · 0.49 FAR built · Flood zone X500
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar electric array installation in garage1 filing · 7 docs
BasementSolar electric array installation in garage1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-Con Engineering111/15/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wiz ElectricalElectrical203/21/2026
Sustainable StrategiesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-Con Engineering7341111/15/2024
Building Lifecycle
03/13/2025
Signed off — Alteration
S01143163-I1
11/21/2024
Permit issued — Solar
S01143163-I1-SL
11/15/2024
Filed — Alteration
S01143163-I1
11/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
11/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
9 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSustainable Strategies11/21/2024
BISPLISSUEDReliable Plumbing & Heating11/13/2002
1 project · most recent 10/29/2024
FiledStatusContractorScope
10/29/2024CompleteSource Electric—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/15/2024Fire-Resistant Penetrations and JointsMichelle Contrispecial
11/15/2024Structural Stability – Alterations of existing buildingsMichelle Contrispecial
11/15/2024Energy Code Compliance InspectionsMichelle Contriprogress
11/15/2024FinalMichelle Contriprogress
11/15/2024Air barrier - visual inspectionMichelle Contrienergy_progress
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account