← Back
BuildNYC
Over six families without stores
105 EAST 192ND STREET
BRONX · BIN 2013825
💬 Discuss this project
1917Year Built
5Stories
C1Building Class
R8Zoning
24,955 sfGross Floor Area
27Units
Rent Stabilized62 Active Violations ▸
Over six families without stores · Owner of record: GC 192 · 6,599 sf lot · 3.78 FAR built · Flood zone X
Locations of Work
ElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofInstallation of rooftop photovoltaic system1p · 1 filing · 3 docs
Floor 51p · 2 filings · 13 docs
Floor 41p · 2 filings · 13 docs
Floor 31p · 2 filings · 13 docs
Floor 21p · 2 filings · 13 docs
Floor 11p · 2 filings · 13 docs
Sub-Basement1p · 2 filings · 13 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mandy Associates303/21/2026
GC 192203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
McHenery Testing Lab109/30/2026
James A Clancy106/15/2025
Leder-Luis Architectural Design, PL404/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Leder-Luis Architectural Design403/21/2026
Arc Design and Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nationwide MechanicalPlumbing207/08/2026
DVM Electrical ServicesElectrical103/22/2026
The Sci ConstructionGeneral Contractor104/09/2026
Preet & M ConstructionScaffold110/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
James A Clancy9176106/15/2025
Leder-Luis Architectural1553110/19/2021
Building Lifecycle
All (79)Filed (6)Permit Issued (4)Violation (60)Inspection (1)Objection (2)Special Inspection (6)
10/02/2026
Permit issued — Sidewalk Shed
X01468130-I1-SH
09/30/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
X01468130-I1
02/18/2026
Violation issued (HPD, closed)
A
02/04/2026
Violation issued (HPD, closed)
B
02/04/2026
Violation issued (HPD, closed)
C
02/04/2026
Violation issued (HPD, closed)
B
02/04/2026
Violation issued (HPD, closed)
C
11/15/2025
Violation issued (HPD, open)
A
11/15/2025
Violation issued (HPD, closed)
C
11/15/2025
Violation issued (HPD, open)
C
11/15/2025
Violation issued (HPD, closed)
B
11/05/2025
Violation issued (HPD, open)
C
11/05/2025
Violation issued (HPD, closed)
C
10/26/2025
Violation issued (HPD, open)
C
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, closed)
B
10/26/2025
Violation issued (HPD, closed)
C
10/26/2025
Violation issued (HPD, closed)
C
10/26/2025
Violation issued (HPD, open)
C
10/26/2025
Violation issued (HPD, open)
B
06/30/2025
Permit issued — Solar
X01236243-I1-SL
06/20/2025
Violation issued (HPD, open)
B
06/20/2025
Violation issued (HPD, closed)
C
06/15/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
X01236243-I1
06/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
06/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
06/04/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
06/04/2025
Special inspection requirement — Final
James Clancy
06/04/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
05/12/2025
Violation issued (HPD, closed)
B
05/12/2025
Violation issued (HPD, closed)
C
05/12/2025
Violation issued (HPD, open)
C
05/12/2025
Violation issued (HPD, open)
B
05/12/2025
Violation issued (HPD, open)
C
05/12/2025
Violation issued (HPD, closed)
B
11/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, open)
B
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, closed)
B
10/17/2024
Violation issued (HPD, open)
B
10/17/2024
Violation issued (HPD, closed)
A
10/17/2024
Violation issued (HPD, closed)
B
07/23/2024
Violation issued (HPD, closed)
C
07/23/2024
Violation issued (HPD, closed)
C
07/10/2024
Violation issued (HPD, open)
B
07/10/2024
Violation issued (HPD, closed)
C
07/10/2024
Violation issued (HPD, closed)
C
07/10/2024
Violation issued (HPD, open)
B
07/10/2024
Violation issued (HPD, closed)
A
07/10/2024
Violation issued (HPD, closed)
C
07/08/2024
Violation issued (HPD, open)
B
07/08/2024
Violation issued (HPD, closed)
C
07/08/2024
Violation issued (HPD, open)
B
07/08/2024
Violation issued (HPD, open)
B
07/08/2024
Violation issued (HPD, open)
B
05/08/2024
Violation issued (HPD, closed)
B
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPreet & M Construction10/02/2026
DOB NOWSolarPermit IssuedThe Sci Construction06/30/2025
DOB NOWPlumbingSigned-offNationwide Mechanical01/07/2022
DOB NOWPlumbingSigned-offNationwide Mechanical12/09/2021
BISOTISSUEDJ. Siebold Construction03/25/2005
BISPLISSUEDGeorge S. Bateman Plumbing/Heatg08/11/2004
1 project · most recent 04/19/2022
Gas
FiledStatusContractorScope
04/19/2022Signed-offNationwide MechanicalGas
2 projects · most recent 10/01/2026
FiledStatusContractorScope
10/01/2026Permit IssuedLintech Electric—
12/08/2025CompleteDVM Electrical Services1 meters
1 project · most recent 06/15/2025
FiledStatusContractorScope
06/15/2025Permit IssuedThe Sci Construction80 panels, 50.4 kw, 5,800 roof_area_sqft
1 project · most recent 09/30/2026
Sidewalk Shed
FiledStatusContractorScope
09/30/2026Permit IssuedPreet & M ConstructionSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/13/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/04/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
06/04/2025Structural Stability – Alterations of existing buildingsJames Clancyspecial
06/04/2025Energy Code Compliance InspectionsJames Clancyprogress
06/04/2025FinalJames Clancyprogress
06/04/2025Air barrier - visual inspectionJames Clancyenergy_progress
09/08/2021Fire-Resistant Penetrations and JointsJulio Leder-Luisspecial
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
10/04/2026X01468130-I1Request digital key ↗
08/24/2026X00590111-I1Request digital key ↗
08/24/2026X00590111-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
10/03/2026X01468130-I1Open ↗
08/24/2026X00590111-I1Open ↗
08/24/2026X00590111-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026X01236243-I1Open ↗
08/25/2026X01236243-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026X00590082-I1Open ↗
08/25/2026X01236243-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00590111-I1Open ↗
08/24/2026X00590111-P2Open ↗
08/24/2026X00590111-P1Open ↗
Showing 3 of 4 on file for this type