Two stories - detached, small or mid-size
105 HAWTHORNE STREET
BROOKLYN · BIN 3115524
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R6Zoning
1,948 sfGross Floor Area
1Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 105 HAWTHORNE LLC · 2,933 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof24p · 1 filing · 20 docs
Floor 621p · 1 filing · 20 docs
Floor 522p · 1 filing · 20 docs
Floor 422p · 1 filing · 20 docs
Floor 323p · 1 filing · 20 docs
Floor 222p · 1 filing · 20 docs
Floor 122p · 1 filing · 20 docs
1 job · most recent 04/24/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/24/2026Signed-offS & U MANAGEMENT INCHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MXM36AVJU9 36,600 BTU · Heat Pump Outdoor ×14
3MXM24AVJU9 24,000 BTU · Heat Pump Outdoor ×6
RXC18AXVJU 21,600 BTU · Heat Pump Outdoor ×6
RXC09AXVJU 10,900 BTU · Heat Pump Outdoor ×4
PUZ-A12NKA7 14,000 BTU · Heat Pump Outdoor ×1
RXC12AXVJU 14,000 BTU · Heat Pump Outdoor ×1
1 job · most recent 04/24/2026
Storm Water/Sanitary
FiledStatusContractorScope
04/24/2026Signed-offBRUCHE MECHANICAL NY LLCStorm, Water/Sanitary
3 jobs · most recent 06/23/2026
General Wiring
FiledStatusContractorScope
06/23/2026CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
08/11/2025CompletePOWER DIRECT ELECTRIC INC—
07/23/2025CompletePOWER DIRECT ELECTRIC INC—
1 job · most recent 04/24/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/24/2026Signed-offS & U MANAGEMENT INCSteel, Concrete, Masonry
Building Lifecycle
All (163)Filed (14)Permit Issued (13)Signed Off (8)Violation (12)Inspection (17)Objection (66)Special Inspection (30)Tax Incentive (3)
06/29/2026
Signed off — New Building
Structural in conjunction with GC #B01140536-I1.
B01140536-I1
06/26/2026
Violation issued (ECB, closed)
Construction
06/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
05/29/2026
Objection resolved — Addressed
05/26/2026
Objection raised — Other
05/06/2026
Signed off — New Building
Structural in conjunction with GC #B01140536-I1.
B01140536-S8
05/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/24/2026
Filed — New Building
Structural in conjunction with GC #B01140536-I1.
B01140536-P6
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
04/24/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
04/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/17/2026
Signed off — Alteration
installation of 8' construction fence
B01158518-I1
03/18/2026
Signed off — New Building
Structural in conjunction with GC #B01140536-I1.
B01140536-S5
03/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/19/2026
Signed off — New Building
Structural in conjunction with GC #B01140536-I1.
B01140536-S2
02/11/2026
Filed — New Building
Structural in conjunction with GC #B01140536-I1.
B01140536-P4
02/11/2026
Filed — New Building
Structural in conjunction with GC #B01140536-I1.
B01140536-P5
02/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/01/2026
485-x construction completed
12/26/2025
Permit issued — Mechanical Systems
B01140536-S5-MS
12/25/2025
Signed off — New Building
Structural in conjunction with GC #B01140536-I1.
B01140536-S3
12/24/2025
Objection raised — Fire_Protection
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
12/23/2025
Objection raised — Structural
12/23/2025
Objection resolved — Addressed
12/23/2025
Objection raised — Structural
12/23/2025
Objection raised — Plumbing
12/23/2025
Objection resolved — Addressed
12/23/2025
Objection resolved — Addressed
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 163 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY504/09/2026
105 HAWTHORNE LLC103/22/2026
N TECH DESIGN OF AMERICA803/22/2026
222 16TH ST203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/17/2024$1.5M—NORMAN VENTURES LLC → 105 HAWTHORNE LLC$775/sf building
04/14/2022$980K—Private party → NORMAN VENTURES LLC$503/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXSPEEDIUM1403/21/2026
AVALON DESIGNS1203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S & U MANAGEMENT INCGeneral Contractor907/08/2026
HEXAGON INDUSTRIES INCGeneral Contractor303/21/2026
N TECH DESIGN OF AMERICAGeneral Contractor307/08/2026
ACE GROUP NY CORPGeneral Contractor204/09/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616904/24/2026
D BOSS INC.9477202/11/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offS & U MANAGEMENT INC12/26/2025
DOB NOWPlumbingSigned-offPLBG P & H INC09/29/2025
DOB NOWPlumbingSigned-offBRUCHE MECHANICAL NY LLC09/26/2025
DOB NOWSidewalk ShedSigned-offACE GROUP NY CORP08/01/2025
DOB NOWSidewalk ShedSigned-offACE GROUP NY CORP08/01/2025
DOB NOWFull DemolitionSigned-offN TECH DESIGN OF AMERICA07/11/2025
DOB NOWFull DemolitionSigned-offN TECH DESIGN OF AMERICA07/09/2025
DOB NOWStructuralSigned-offS & U MANAGEMENT INC07/08/2025
DOB NOWGeneral ConstructionPermit IssuedS & U MANAGEMENT INC07/08/2025
DOB NOWFoundationSigned-offS & U MANAGEMENT INC07/08/2025
DOB NOWConstruction FenceSigned-offS & U MANAGEMENT INC06/27/2025
DOB NOWFull DemolitionSigned-offN TECH DESIGN OF AMERICA06/27/2025
DOB NOWConstruction FenceSigned-offHEXAGON INDUSTRIES INC01/21/2025
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
05/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/11/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/19/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/24/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/17/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 99
DateRequirementInspectorRole
06/01/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
06/01/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
06/01/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
06/01/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
06/01/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
06/01/2026MeteringSHAHRIAR QUAYYUMenergy_progress
06/01/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
06/01/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/01/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
06/01/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
06/01/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
06/01/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
06/01/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
06/01/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
06/01/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
06/01/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
04/24/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
04/24/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
04/24/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
04/24/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
04/24/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
04/24/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
04/24/2026MeteringSHAHRIAR QUAYYUMenergy_progress
04/24/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
04/24/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 99.
▾Documents — 141 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/23/2026B01158518-I1Contact architect ↗
08/21/2026B01140536-P5Contact architect ↗
08/21/2026B01140536-P4Contact architect ↗
Showing 3 of 14 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
01/02/2026340915567Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/02/2026340915567Open ↗
▸Zoning, Tax Lot & Property Records19
▸DOB NOWRestrictive Declaration/Easement 18
08/21/2026B01140536-I1Open ↗
08/21/2026B01140536-S5Open ↗
08/21/2026B01140536-S8Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/21/2026B01140536-I1Open ↗
08/15/2026B01140536-P6Open ↗
08/13/2026B01140536-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/21/2026B01140536-P1Open ↗
08/21/2026B01140536-I1Open ↗
08/15/2026B01140536-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/21/2026B01140536-P1Open ↗
08/21/2026B01140536-I1Open ↗
08/13/2026B01140536-P3Open ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature37
09/23/2026B01140536-S8Open ↗
09/23/2026B01140536-S8Open ↗
09/01/2026B01140536-S5Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/21/2026B01140536-P6Open ↗
08/21/2026B01140536-S8Open ↗
08/21/2026B01140536-S5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026B01140536-S8Open ↗
09/23/2026B01140536-S8Open ↗
09/01/2026B01140536-S5Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/02/2026340915567Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026B01158507-I1Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/21/2026B01140536-I1Open ↗
08/21/2026B01140536-P1Open ↗
08/13/2026B01140536-P3Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01158507-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01158507-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01158507-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01158507-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/21/2026B01140536-P1Open ↗
08/21/2026B01140536-I1Open ↗
08/15/2026B01140536-P6Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
01/02/2026340915567Open ↗
▸BISSTREET TREE CHECKLIST1
01/02/2026340915567Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01140536-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01140536-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/21/2026B01140536-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/13/2026B01158507-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01158507-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/21/2026B01140536-S8Open ↗
08/21/2026B01140536-S5Open ↗
▸Inspections & Test Reports1
▸DOB NOWConcrete Testing Exception Report1
08/13/2026B01140536-S2Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
01/02/2026340915567Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/02/2026340915567Open ↗
▸Other Documents20
▸DOB NOWProperty Ownership Certification5
08/21/2026B01140536-P1Open ↗
08/21/2026B01140536-I1Open ↗
08/15/2026B01140536-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/21/2026B01140536-P1Open ↗
08/21/2026B01140536-I1Open ↗
08/15/2026B01140536-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/21/2026B01140536-P1Open ↗
08/21/2026B01140536-I1Open ↗
08/15/2026B01140536-P6Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/02/2026340915567Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/02/2026340915567Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/02/2026340915567Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01158507-I1Open ↗
▸DOB NOWFinal Survey1
08/21/2026B01140536-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01158507-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01158507-I1Open ↗