← Back
BROOKLYN
105 JOHN STREET
BROOKLYN · BIN 3819669
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone VE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSOLIDATED EDISON CO OF NY5907/08/2026
CON EDISON COMPANY OF NEW YORK603/21/2026
CON EDISON COMPANY1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CON EDISON305/05/2026
SPARC FIRE PROTECTION ENGINEERING108/30/2023
CONSOLIDATED EDISON203/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSOLIDATED EDISON503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW YORK PLBG-HTG-COOL CPlumbing603/22/2026
NEW YORK PLBG-HTG-COOL CFire Protection407/08/2026
GRACE INDUSTRIES LLCGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106605/05/2026
Building Lifecycle
All (44)Filed (6)Permit Issued (6)Signed Off (3)Inspection (10)Special Inspection (19)
05/05/2026
Filed — Alteration
INSTALLATION OF NEW CONCRETE FOUNDATIONS AND A STEEL PLATFORM TO SUPPORT FUTURE MECHANICAL EQUIPMENT.
B01390383-I1
04/23/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
GEORGE GHEBRYAL
04/23/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
04/21/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
04/21/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
04/21/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
03/24/2026
Permit issued — Foundation
B00989053-I1-GC-CX
04/08/2025
Permit issued — Foundation
B00989053-I1-GC-CX
02/11/2025
Signed off — Alteration
UPGRADE DELUGE SYSTEM FOR TRANSFORMER #6 AT CON EDISON'S FARRAGUT SUBSTATION.
B01008523-I1
08/13/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/12/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/09/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
08/08/2024
Permit issued — Sprinklers
B00924605-I1-EW-SP
04/25/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/19/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
04/17/2024
Permit issued — Sprinklers
B01008523-I1-EW-SP
03/08/2024
Filed — Alteration
UPGRADE DELUGE SYSTEM FOR TRANSFORMER #6 AT CON EDISON'S FARRAGUT SUBSTATION.
B01008523-I1
01/26/2024
Filed — Alteration
Reinforcement of existing electrical equiment foundation footings and piers at the Farragut Substation locations depicted on the cover page of the drawing set.
B00989053-I1
01/11/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
01/11/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
01/11/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
GEORGE GHEBRYAL
01/11/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
MARK STIER
01/11/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
01/11/2024
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/11/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
01/11/2024
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
01/11/2024
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
08/30/2023
Filed — Alteration
UPGRADE DELUGE SYSTEM FOR REACTOR 12 AT CON EDISON'S FARRAGUT SUBSTATION.
B00924605-I1
08/16/2023
Signed off — Alteration
B00341166-I1
03/15/2023
Signed off — Alteration
B00672334-I1
03/16/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/14/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/14/2022
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
03/12/2022
Permit issued — Sprinklers
B00672334-I1-EW-SP
03/10/2022
Filed — Alteration
B00672334-I1
04/17/2020
Permit issued — Sprinklers
B00341166-I1-EW-SP
04/15/2020
Filed — Alteration
B00341166-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedGRACE INDUSTRIES LLC03/24/2026
DOB NOWFoundationPermit IssuedGRACE INDUSTRIES LLC04/08/2025
DOB NOWSprinklersPermit IssuedNEW YORK PLBG-HTG-COOL C08/08/2024
DOB NOWSprinklersSigned-offNEW YORK PLBG-HTG-COOL C04/17/2024
DOB NOWSprinklersSigned-offNEW YORK PLBG-HTG-COOL C03/12/2022
DOB NOWSprinklersSigned-offNEW YORK PLBG-HTG-COOL C04/17/2020
BISOTISSUEDEBERHART CONSTRUCTION CO02/19/2019
BISOTISSUEDLEVEL ONE CONST SERV LTD10/08/2015
BISOTISSUEDLEVEL ONE CONST SERV LTD08/11/2015
BISEQISSUEDLEVEL ONE CONST SERV LTD08/11/2015
BISFPISSUEDUNITED FIRE PROT CORP12/18/2014
BISFPISSUEDUNITED FIRE PROT CORP12/18/2014
BISFPISSUEDUNITED FIRE PROT CORP12/18/2014
BISFPISSUEDUNITED FIRE PROT CORP12/18/2014
BISFPISSUEDUNITED FIRE PROT CORP12/18/2014
BISFPISSUEDUNITED FIRE PROT CORP06/24/2014
BISOTISSUEDGIANFIA CORP03/11/2013
BISFPISSUEDUNITED FIRE PROT CORP12/21/2012
BISFPISSUEDUNITED FIRE PROT CORP12/21/2012
BISFPISSUEDUNITED FIRE PROT CORP12/21/2012
BISFPISSUEDUNITED FIRE PROT CORP12/21/2012
BISFPISSUEDUNITED FIRE PROT CORP12/21/2012
BIS—ISSUEDD'ONOFRIO GENERAL CONTRACTORS07/23/2012
BIS—ISSUEDD'ONOFRIO GENERAL CONTRACTORS05/18/2012
BISOTISSUEDEBERHART CONSTRUCTION CO03/23/2012
BISSPISSUEDNEW YORK PLBG-HTG-COOL C12/01/2011
BISMHISSUEDCON EDISON COMPANY INC04/21/2010
BISOTISSUEDT. MORIARTY & SON, INC02/09/2010
BISOTISSUEDEBERHART CONSTRUCTION CO03/16/2007
1 project · most recent 08/30/2023
FiledStatusContractorScope
08/30/2023Permit IssuedNEW YORK PLBG-HTG-COOL C74 heads
1 project · most recent 08/06/2026
FiledStatusContractorScope
08/06/2026Permit IssuedTOP SHELF ELECTRIC CORP—
2 projects · most recent 05/05/2026
Steel Concrete
FiledStatusContractorScope
05/05/2026——Steel, Concrete
01/26/2024Permit IssuedGRACE INDUSTRIES LLCSteel, Concrete
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/12/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/09/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
04/25/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/19/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
03/16/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/14/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/14/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
04/23/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
04/23/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
04/23/2026Subgrade InspectionsGEORGE GHEBRYALspecial
04/23/2026Structural Steel - WeldingGEORGE GHEBRYALspecial
04/23/2026Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
04/23/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)GEORGE GHEBRYALspecial
04/23/2026Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
04/21/2026Footing and FoundationGEORGE GHEBRYALprogress
04/21/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
04/21/2026FinalGEORGE GHEBRYALprogress
01/11/2024FinalGEORGE GHEBRYALprogress
01/11/2024Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
01/11/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)GEORGE GHEBRYALspecial
01/11/2024Subsurface Investigations (Borings/Test Pits)MARK STIERspecial
01/11/2024Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
01/11/2024Post-installed AnchorsGEORGE GHEBRYALspecial
01/11/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
01/11/2024Footing and FoundationGEORGE GHEBRYALprogress
01/11/2024Structural Steel - DetailsGEORGE GHEBRYALspecial
▾Documents — 307 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/31/2026B00672334-I1Request digital key ↗
08/26/2026B00924605-I1Request digital key ↗
08/26/2026B00989053-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00341166-I1Request digital key ↗
▸Applications & Permits92
▸BISPLAN / WORK APPROVAL APPLICATION65
02/08/2019321924316Open ↗
01/16/2019321294782Open ↗
10/25/2018321294817Open ↗
Showing 3 of 65 on file for this type
▸BISWORK PERMIT APPLICATION17
02/20/2019321924316Open ↗
10/27/2015340186337Open ↗
08/12/2015340186337Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION10
02/05/2015340186337Open ↗
02/05/2015340186337Open ↗
01/14/2015340186337Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZoning Diagram (ZD1)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications60
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
02/20/2019321924316Open ↗
02/08/2019321924316Open ↗
06/02/2017321420119Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/15/2026B00989053-I1Open ↗
09/15/2026B00989053-I1Open ↗
09/15/2026B00989053-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026B00672334-I1Open ↗
08/26/2026B00989053-P1Open ↗
08/26/2026B00989053-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
02/08/2019321924316Open ↗
06/02/2017321420119Open ↗
06/24/2014320988151Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/08/2019321924316Open ↗
06/02/2017321420119Open ↗
06/24/2014320988151Open ↗
▸BISApplicant / Owner Signature3
04/23/2014340125242Open ↗
04/17/2014340125242Open ↗
10/09/2014340186337Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/15/2026B00989053-I1Open ↗
08/25/2026B00989053-P1Open ↗
08/23/2026B01390383-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment8
▸BISFA - FDNY APPROVAL : FD-FAA4
07/13/2018320485211Open ↗
06/07/2018320485186Open ↗
06/07/2018320485239Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/02/2017321420119Open ↗
▸Safety & Tenant Protection1
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos29
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
02/08/2019321924316Open ↗
06/02/2017321420119Open ↗
10/09/2014340186337Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00672334-I1Open ↗
08/26/2026B00989053-I1Open ↗
08/26/2026B00989053-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
06/24/2014320988151Open ↗
Showing 1 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
04/17/2014340125242Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/20/2019321924316Open ↗
02/08/2019321924316Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/09/2014340186337Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX8
02/20/2019321924316Open ↗
08/12/2015340186337Open ↗
08/12/2015340186337Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER7
02/20/2019321924316Open ↗
06/29/2016320363735Open ↗
08/12/2015340186337Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026B00989053-I1Open ↗
08/13/2026B00989053-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/09/2014340186337Open ↗
▸BISHYDRO FLOW TEST LETTER1
06/02/2017321420119Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
06/02/2017321420119Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00989053-I1Open ↗
▸Approvals, Objections & Sign-offs25
▸BISADMINISTRATIVE OBJECTIONS17
06/24/2014320988151Open ↗
06/11/2012320485202Open ↗
06/04/2012320485211Open ↗
Showing 3 of 17 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
06/30/2016320363735Open ↗
06/29/2016320363735Open ↗
Showing 2 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/24/2012320373877Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT26
02/08/2019321924316Open ↗
06/02/2017321420119Open ↗
06/29/2016320363735Open ↗
Showing 3 of 26 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
07/24/2012320373877Open ↗
▸Filing & Intake Forms31
▸BISEFILING COVER SHEET18
02/08/2019321924316Open ↗
06/06/2017321420119Open ↗
12/30/2015321294817Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION10
02/15/2019321924316Open ↗
02/12/2018321294817Open ↗
02/12/2018321294782Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/09/2014340186337Open ↗
04/17/2014340125242Open ↗
04/17/2014340125242Open ↗