← Back
BuildNYC
Elevator cooperative
105 MONTAGUE STREET
BROOKLYN · Brooklyn Heights · BIN 3001968
💬 Discuss this project
1899Year Built
8Stories
D4Building Class
R7-1Zoning
38,760 sfGross Floor Area
26Units
LL97 CoveredRent Stabilized3 Active Violations 2 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: Pinette Housing · 5,100 sf lot · 7.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsChoice NY ManagementUnder Construction1 filing
RoofInterior Apartment Renovation1p · 2 filings · 12 docs
Floor 8Unit 801, Unit 8043p · 3 filings · 12 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Unit 1021p · 1 filing
Mezzanine1 filing · 7 docs
Site & exteriorGoldin Choice Management4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pinette Housing2303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sheikh Expediting403/21/2026
Municipal Building Consultants303/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Capital Construction & PAGeneral Contractor1407/08/2026
All Empire Building ConScaffold1409/07/2026
A & D General ContractingScaffold407/08/2026
TCS ConstructionGeneral Contractor303/21/2026
R. Meade ElectricElectrical103/21/2026
DancobyGeneral Contractor107/08/2026
Altair Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
The Vilnits Group1223106/04/2025
Ryan Special Engineering2018310/09/2022
SWL Engineering Inspectio6912107/19/2022
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
11/05/2026
Filed — Alteration
Fill in floor at double-height space. Reconfigure in-unit stair between floors.
B01464739-I1
09/23/2026
Special inspection requirement — Final
John Hatheway
09/08/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00796176-I1
09/08/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00796176-S1
181 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offAll Empire Building Con08/17/2026
DOB NOWSidewalk ShedSigned-offAll Empire Building Con05/15/2026
DOB NOWGeneral ConstructionPermit IssuedCapital Construction & PA04/15/2026
DOB NOWSupported ScaffoldSigned-offAll Empire Building Con10/30/2025
DOB NOWSidewalk ShedSigned-offAll Empire Building Con09/22/2025
DOB NOWMechanical SystemsSigned-offDancoby06/09/2025
DOB NOWGeneral ConstructionPermit IssuedCapital Construction & PA04/30/2025
DOB NOWSupported ScaffoldSigned-offAll Empire Building Con09/04/2024
DOB NOWSidewalk ShedSigned-offAll Empire Building Con09/04/2024
DOB NOWGeneral ConstructionPermit IssuedCapital Construction & PA04/29/2024
DOB NOWGeneral ConstructionPermit IssuedCapital Construction & PA09/26/2023
DOB NOWSidewalk ShedSigned-offAll Empire Building Con09/06/2023
DOB NOWSupported ScaffoldSigned-offAll Empire Building Con09/06/2023
DOB NOWGeneral ConstructionPermit IssuedCapital Construction & PA09/27/2022
DOB NOWStructuralSigned-offCapital Construction & PA09/22/2022
DOB NOWSidewalk ShedSigned-offAll Empire Building Con09/02/2022
DOB NOWSupported ScaffoldSigned-offAll Empire Building Con09/01/2022
DOB NOWPlumbingSigned-offAltair Plumbing and Heating04/26/2022
DOB NOWSupported ScaffoldSigned-offA & D General Contracting04/22/2022
DOB NOWSidewalk ShedSigned-offA & D General Contracting04/22/2022
DOB NOWGeneral ConstructionSigned-offTCS Construction03/17/2022
BISOTISSUEDPreserv BLD Restoration Management09/29/2017
BISEQISSUEDEverest Scaffolding08/31/2017
BISEQISSUEDEverest Scaffolding08/31/2017
BISOTISSUEDPreserv BLD Restoration Management10/03/2016
BISOTISSUEDPreserv BLD Restoration Management09/22/2016
BISEQISSUEDEverest Scaffolding09/19/2016
BISEQISSUEDEverest Scaffolding09/14/2016
BISPLISSUEDEmerald Mechanical Solutions I11/25/2011
BISOTISSUEDArchetypal Imagery11/22/2011
BISPLISSUEDAdvantage Plumbing & Amp; Mechanical08/23/2010
BISPLISSUEDMarathon Mechanical03/19/2010
BISOTISSUEDAlba Home Remodeling04/21/2009
BISEQISSUEDOutdoor Installation01/02/2007
BISOTISSUEDWonder Works Construction04/18/2005
BISEQISSUEDOutdoor Installation04/12/2005
BISEQISSUEDOutdoor Installation04/12/2005
BISEQISSUEDAris Restoration01/20/2005
BISEQISSUEDJerrick Waterproofing Co02/18/2004
BISOTISSUEDEtna Maintenance03/28/2001
5 projects · most recent 06/11/2026
General Wiring
FiledStatusContractorScope
06/11/2026Permit IssuedLina ElectricGeneral Wiring
03/14/2026Permit IssuedSNB Electrical ContngGeneral Wiring
05/23/2025CompletePLM ElectricGeneral Wiring
09/26/2022Permit IssuedRichard Neu—
04/06/2018CompleteWilldan Electrical of NY—
1 project · most recent 10/29/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/29/2025Signed-offAll Empire Building ConScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/23/2026FinalJohn Hathewayprogress
05/30/2025Fire-Resistant Penetrations and JointsILYA VILNITSspecial
05/30/2025Mechanical SystemsILYA VILNITSspecial
05/30/2025FinalILYA VILNITSprogress
05/30/2025Tenant Protection Plan ComplianceILYA VILNITSspecial
10/13/2022Fire-Resistant Penetrations and JointsWilliam Ryanspecial
10/13/2022Energy Code Compliance InspectionsCome Menageprogress
06/30/2022Structural Steel - WeldingJOSHUA LUCKRITZspecial
06/30/2022Structural Steel - High Strength BoltingJOSHUA LUCKRITZspecial
06/30/2022Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
06/30/2022Post-installed AnchorsJOSHUA LUCKRITZspecial
06/29/2022FinalYakov Weinsteinprogress
06/29/2022Structural Steel - DetailsJOSHUA LUCKRITZspecial
164 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account