← Back
Five to six families
105 NEWEL STREET
BROOKLYN · BIN 3066236
💬 Discuss this project
1930Year Built
3Stories
C2Building Class
R6BZoning
4,500 sfGross Floor Area
6Units
Rent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸FDNY Report ↗
Five to six families · Owner of record: 105 NEWEL LLC · 2,500 sf lot · 1.8 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 24p · 2 filings · 20 docs
Floor 1
Cellar3p · 1 filing · 20 docs
1 job · most recent 08/18/2026
Ventilation Systems
FiledStatusContractorScope
08/18/2026Signed-offBRIDGE ZALE CONSTRUCT CORVentilation Systems
1 job · most recent 08/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/18/2026Signed-offNEW YORK PARK PLBG&HTG COGas, Storm, Water/Sanitary
3 jobs · most recent 07/22/2025
General Wiring
FiledStatusContractorScope
07/22/2025Permit IssuedJOSEPH WEINSTEIN ELECTRIC7 meters
05/06/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
04/15/2021CompleteBRG ELECTRIC INC.General Wiring
Building Lifecycle
All (117)Filed (10)Permit Issued (5)Signed Off (2)Violation (50)Inspection (4)Objection (16)Special Inspection (30)
08/18/2026
Filed — Alteration
JOB FILED TO SHOW INTERIOR RENOVATION of APT 2L TO CHANGE THE LAYOUT AND TO ADD A BATHROOM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01158116-S7
07/15/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
06/17/2026
Objection raised — Scope
06/17/2026
Objection raised — Scope
06/12/2026
Filed — Alteration
JOB FILED TO SHOW INTERIOR RENOVATION of APT 2L TO CHANGE THE LAYOUT AND TO ADD A BATHROOM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01158116-S6
11/24/2025
Signed off — Alteration
JOB FILED TO SHOW INTERIOR RENOVATION of APT 2L TO CHANGE THE LAYOUT AND TO ADD A BATHROOM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01158116-S1
10/29/2025
Violation issued (HPD, open)
A
10/29/2025
Violation issued (HPD, open)
A
10/29/2025
Violation issued (HPD, open)
A
08/11/2025
Violation issued (HPD, closed)
C
08/11/2025
Violation issued (HPD, closed)
B
08/11/2025
Violation issued (HPD, closed)
B
08/11/2025
Violation issued (HPD, closed)
A
08/11/2025
Violation issued (HPD, closed)
C
04/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
CARL HAMANN
04/08/2025
Special inspection requirement — Concrete - Cast-In-Place
CARL HAMANN
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
04/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/08/2025
Special inspection requirement — Final
CARL HAMANN
04/07/2025
Filed — Alteration
JOB FILED TO SHOW INTERIOR RENOVATION of APT 2L TO CHANGE THE LAYOUT AND TO ADD A BATHROOM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01158116-P3
04/07/2025
Special inspection requirement — Concrete - Cast-In-Place
CARL HAMANN
04/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
CARL HAMANN
04/07/2025
Special inspection requirement — Final
CARL HAMANN
04/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
04/04/2025
Signed off — Alteration
JOB FILED TO SHOW INTERIOR RENOVATION of APT 2L TO CHANGE THE LAYOUT AND TO ADD A BATHROOM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01158116-S2
03/29/2025
Violation issued (ECB, open)
Construction
03/29/2025
Violation issued (ECB, open)
Construction
03/28/2025
Objection resolved — Addressed
03/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
CARL HAMANN
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
03/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
03/26/2025
Filed — Alteration
JOB FILED TO SHOW INTERIOR RENOVATION of APT 2L TO CHANGE THE LAYOUT AND TO ADD A BATHROOM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01158116-P2
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
03/26/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
03/12/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/10/2025
Objection raised — Structural
02/10/2025
Objection raised — Scope
02/07/2025
Filed — Alteration
JOB FILED TO SHOW INTERIOR RENOVATION of APT 2L TO CHANGE THE LAYOUT AND TO ADD A BATHROOM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01158116-P1
02/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/05/2025
Objection raised — Structural
02/05/2025
Objection raised — Structural
02/05/2025
Objection raised — Admin
02/05/2025
Objection raised — Structural
02/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
02/04/2025
Permit issued — Plumbing
B01158116-S1-PL
01/31/2025
Filed — Alteration
JOB FILED TO SHOW INTERIOR RENOVATION of APT 2L TO CHANGE THE LAYOUT AND TO ADD A BATHROOM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01158116-S4
01/29/2025
Special inspection requirement — Fenestration air leakage
Latest 60 of 117 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRIDGE ZALE CONSTRUCTION CORP.2007/08/2026
105 NEWEL LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/08/2024$1.1M—— → —$244/sf building
05/07/2020$1.3M—Private party → 105 NEWEL ST, LLC$289/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAMANN ENGINEERING, PLLC908/18/2026
GERALD CALIENDO ARCHITECTS108/31/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BRIDGE ZALE CONSTRUCT CORGeneral Contractor307/08/2026
ALLIANCE PLUMBING CORPPlumbing107/08/2026
CARDOZA PLUMBING CORPPlumbing107/08/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAMANN ENGINEERING, PLLC4949704/07/2025
SD TESTING & INSPECTION S7010108/31/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO02/04/2025
DOB NOWGeneral ConstructionSigned-offBRIDGE ZALE CONSTRUCT COR01/27/2025
DOB NOWGeneral ConstructionPermit IssuedBRIDGE ZALE CONSTRUCT COR12/30/2024
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE08/03/2023
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING CORP11/09/2020
BISOTISSUEDABC INTERIOR EXTERIOR SER11/02/2020
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/12/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/08/2025Fire-Resistance Rated ConstructionCARL HAMANNprogress
04/08/2025Concrete - Cast-In-PlaceCARL HAMANNspecial
04/08/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
04/08/2025Tenant Protection Plan Compliance—special
04/08/2025FinalCARL HAMANNprogress
04/07/2025Concrete - Cast-In-PlaceCARL HAMANNspecial
04/07/2025Fire-Resistance Rated ConstructionCARL HAMANNprogress
04/07/2025FinalCARL HAMANNprogress
04/07/2025Tenant Protection Plan Compliance—special
04/07/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
03/27/2025Tenant Protection Plan ComplianceCARL HAMANNspecial
03/27/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
03/27/2025HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
03/26/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
03/26/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/26/2025Tenant Protection Plan Compliance—special
03/26/2025HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
02/06/2025Tenant Protection Plan Compliance—special
02/05/2025HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
02/05/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
01/29/2025Fenestration air leakage—energy_progress
01/29/2025Concrete - Cast-In-Place—special
01/29/2025Tenant Protection Plan Compliance—special
01/29/2025Fire-Resistance Rated Construction—progress
01/29/2025Fenestration and door U-factor and product ratings—energy_progress
Latest 25 of 32.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/23/2026B01158116-P1Request digital key ↗
08/23/2026B01158116-S4Request digital key ↗
08/23/2026B01158116-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00382776-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
10/16/2024340754963Open ↗
10/15/2024340754963Open ↗
09/22/2020340754963Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
11/02/2020340754963Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/21/2025340754963Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/23/2026B01158116-S4Open ↗
08/23/2026B01158116-S2Open ↗
08/23/2026B01158116-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B01158116-P2Open ↗
08/31/2026B01158116-I1Open ↗
08/24/2026B01158116-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B01158116-P2Open ↗
08/31/2026B01158116-I1Open ↗
08/24/2026B01158116-S2Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/28/2020340754963Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
09/14/2020340754963Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00382776-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/23/2026B01158116-S4Open ↗
08/23/2026B01158116-S2Open ↗
08/23/2026B01158116-S1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/14/2020340754963Open ↗
08/28/2020340754963Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
10/26/2020340754963Open ↗
10/02/2020340754963Open ↗
09/14/2020340754963Open ↗
Showing 3 of 4 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
10/04/2024340754963Open ↗
▸BISINTERIOR LIGHTING POWER1
10/04/2024340754963Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/04/2024340754963Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/08/2024340754963Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/26/2020340754963Open ↗
09/14/2020340754963Open ↗
09/01/2020340754963Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/04/2024340754963Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/04/2024340754963Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01158116-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01158116-S4Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/21/2025340754963Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/25/2020340754963Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/08/2024340754963Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/01/2020340754963Open ↗
▸BISADDITIONAL INFORMATION1
10/02/2020340754963Open ↗
▸Other Documents1
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
10/04/2024340754963Open ↗