← Back
BuildNYC
Elevator apt, fireproof with stores
Navy Green
105 NORTH PORTLAND AVENUE · Fort Greene · BIN 3399809
💬 Discuss this project
1939Year Built
13Stories
D6Building Class
R6Zoning
924,900 sfGross Floor Area
856Units
LL97 Covered20 Active Violations 14 unresolved · 6 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: NYC Housing Authority · 653,014 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWhitman - Senior Center, New York City Housing Authority3p · 2 filings · 20 docs
Floor 1Whitman - Senior Center, New York City Housing Authority25p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority1907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYCHA405/08/2026
Lakhani & Jordan308/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Stephen B Jacobs Group603/21/2026
New York City Housing Authority103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Metrocity GroupPlumbing607/08/2026
Mac Fhionnghaile & SonsElectrical203/21/2026
Jemco Electrical Contspecialty_contractor207/08/2026
Tedco GroupGeneral Contractor204/09/2026
Jemco Electric ContractorsElectrical103/21/2026
Mac Fhionghalile & SonsGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP Engineers & Architects1438405/08/2026
20/20 Inspections1471308/29/2022
Building Lifecycle
All (49)Filed (7)Permit Issued (7)Signed Off (4)Objection (4)Special Inspection (27)
07/08/2026
Signed off — Alteration
1. Provide twenty (20) PTAC Units with nominal cooling capacity of 17.1 MBH and heating capacity of 16.7 MBH each, 2. Provide one (1) split system with cooling capacity of 24 MBH (outdoor unit-ACCU-2) and three (3) indoor units 5.0 MBH each. 3. Exist. Ex
B00777499-I1
07/06/2026
Signed off — Alteration
1. Provide twenty (20) PTAC Units with nominal cooling capacity of 17.1 MBH and heating capacity of 16.7 MBH each, 2. Provide one (1) split system with cooling capacity of 24 MBH (outdoor unit-ACCU-2) and three (3) indoor units 5.0 MBH each. 3. Exist. Ex
B00777499-S1
05/08/2026
Filed — Alteration
1. Provide twenty (20) PTAC Units with nominal cooling capacity of 17.1 MBH and heating capacity of 16.7 MBH each, 2. Provide one (1) split system with cooling capacity of 24 MBH (outdoor unit-ACCU-2) and three (3) indoor units 5.0 MBH each. 3. Exist. Ex
B00777499-P2
04/27/2026
Permit issued — Structural
B00777499-I1-GC
01/28/2026
Filed — Alteration
1. Provide twenty (20) PTAC Units with nominal cooling capacity of 17.1 MBH and heating capacity of 16.7 MBH each, 2. Provide one (1) split system with cooling capacity of 24 MBH (outdoor unit-ACCU-2) and three (3) indoor units 5.0 MBH each. 3. Exist. Ex
B00777499-P1
01/28/2026
Special inspection requirement — Masonry
JAMES WILSON
01/28/2026
Special inspection requirement — Final
JAMES WILSON
01/28/2026
Special inspection requirement — Structural Steel - Details
JAMES WILSON
01/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
01/28/2026
Special inspection requirement — Post-installed Anchors
JAMES WILSON
12/16/2025
Permit issued — Mechanical Systems
B00777499-S1-MS
09/17/2025
Permit issued — Mechanical Systems
B00777499-S1-MS
05/15/2025
Objection raised — Admin
05/15/2025
Objection resolved — Addressed
05/14/2025
Objection raised — Admin
05/14/2025
Objection resolved — Addressed
05/13/2025
Filed — Alteration
1. Provide twenty (20) PTAC Units with nominal cooling capacity of 17.1 MBH and heating capacity of 16.7 MBH each, 2. Provide one (1) split system with cooling capacity of 24 MBH (outdoor unit-ACCU-2) and three (3) indoor units 5.0 MBH each. 3. Exist. Ex
B00777499-S1
04/11/2025
Permit issued — General Construction
B00777499-I1-ST
12/16/2022
Signed off — Alteration
REMOVAL AND REPLACEMENT OF MECHANICAL EQUIPMENT INCLUDING PIPING AND DUCTWORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00390882-I1
08/29/2022
Filed — Alteration
REMOVAL AND REPLACEMENT OF MECHANICAL EQUIPMENT INCLUDING PIPING AND DUCTWORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00390882-P1
08/29/2022
Special inspection requirement — Mechanical Systems
JACOB HAAS
08/29/2022
Special inspection requirement — Post-installed Anchors
JACOB HAAS
08/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
08/29/2022
Special inspection requirement — Energy Code Compliance Inspections
JACOB HAAS
08/29/2022
Special inspection requirement — Final
JACOB HAAS
08/29/2022
Special inspection requirement — HVAC and service water heating equipment
JACOB HAAS
08/29/2022
Special inspection requirement — Maintenance information
JACOB HAAS
08/29/2022
Special inspection requirement — HVAC insulation and sealing
JACOB HAAS
08/29/2022
Special inspection requirement — Shutoff dampers
JACOB HAAS
08/29/2022
Special inspection requirement — HVAC and service water heating system controls
JACOB HAAS
08/29/2022
Special inspection requirement — Electrical motors
JACOB HAAS
08/10/2022
Signed off — Alteration
B00390951-I1
08/03/2022
Special inspection requirement — Mechanical Systems
JACOB HAAS
08/03/2022
Special inspection requirement — HVAC and service water heating system controls
JACOB HAAS
08/03/2022
Special inspection requirement — Shutoff dampers
JACOB HAAS
08/03/2022
Special inspection requirement — HVAC and service water heating equipment
JACOB HAAS
08/03/2022
Special inspection requirement — Electrical motors
JACOB HAAS
08/03/2022
Special inspection requirement — HVAC insulation and sealing
JACOB HAAS
08/03/2022
Special inspection requirement — Maintenance information
JACOB HAAS
08/03/2022
Special inspection requirement — Final
JACOB HAAS
08/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
08/03/2022
Special inspection requirement — Energy Code Compliance Inspections
JACOB HAAS
08/03/2022
Special inspection requirement — Post-installed Anchors
JACOB HAAS
07/22/2022
Filed — Alteration
1. Provide twenty (20) PTAC Units with nominal cooling capacity of 17.1 MBH and heating capacity of 16.7 MBH each, 2. Provide one (1) split system with cooling capacity of 24 MBH (outdoor unit-ACCU-2) and three (3) indoor units 5.0 MBH each. 3. Exist. Ex
B00777499-I1
06/21/2022
Permit issued — Mechanical Systems
B00390882-I1-MS
05/12/2022
Permit issued — Plumbing
B00390951-I1-PL
04/14/2021
Permit issued — Plumbing
B00390951-I1-PL
10/14/2020
Filed — Alteration
REMOVAL AND REPLACEMENT OF MECHANICAL EQUIPMENT INCLUDING PIPING AND DUCTWORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00390882-I1
10/14/2020
Filed — Alteration
B00390951-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offJemco Electrical Cont04/27/2026
DOB NOWMechanical SystemsSigned-offTedco Group12/16/2025
DOB NOWMechanical SystemsSigned-offTedco Group09/17/2025
DOB NOWGeneral ConstructionSigned-offJemco Electrical Cont04/11/2025
DOB NOWMechanical SystemsSigned-offMac Fhionghalile & Sons06/21/2022
DOB NOWPlumbingSigned-offMetrocity Group05/12/2022
DOB NOWPlumbingSigned-offMetrocity Group04/14/2021
BISOTISSUEDMac Fhionghalile & Sons01/22/2021
BISFPISSUEDAllied Fire Control Services05/17/2018
BISFPISSUEDAllied Fire Control Services09/05/2014
BISFPISSUEDFire Command Co01/21/2004
BISFPISSUEDFire Command Co09/04/1992
1 project · most recent 05/08/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2026Signed-offJemco Electrical ContAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Amana ×20
Heat / Cool
Mitsubishi Electric Model PLA-A12-NHA-6 (BS) 5,000 BTU · Fan Coil Indoor ×3
Model MXZ-SM36 NLHZ 24,000 BTU · Vrf Outdoor ×1
Heating
Amana AMANA-PTC173J50AXXXA, 20 Units PTAC-1, S/N 2508169692, 1A, 9687, 2, 9696, 2A, 9695, 3, 9686, 3A-9686, 4-9677, 4A-0882, 4B-0883, 5--0877, 5A-9887, 5B-0878, 6-0879, 6A-9693, 7-4413, 7A-9733, 8-0876, , 16,700 BTU ×20
2 projects · most recent 10/28/2025
General Wiring
FiledStatusContractorScope
10/28/2025CompleteJemco Electric ContractorsGeneral Wiring
06/04/2021CompleteMac Fhionnghaile & SonsGeneral Wiring
1 project · most recent 05/08/2026
Steel Masonry
FiledStatusContractorScope
05/08/2026Signed-offJemco Electrical ContSteel, Masonry
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
01/28/2026MasonryJAMES WILSONspecial
01/28/2026FinalJAMES WILSONprogress
01/28/2026Structural Steel - DetailsJAMES WILSONspecial
01/28/2026Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
01/28/2026Post-installed AnchorsJAMES WILSONspecial
08/29/2022Mechanical SystemsJACOB HAASspecial
08/29/2022Post-installed AnchorsJACOB HAASspecial
08/29/2022Fire-Resistant Penetrations and JointsJACOB HAASspecial
08/29/2022Energy Code Compliance InspectionsJACOB HAASprogress
08/29/2022FinalJACOB HAASprogress
08/29/2022HVAC and service water heating equipment JACOB HAASenergy_progress
08/29/2022Maintenance informationJACOB HAASenergy_progress
08/29/2022HVAC insulation and sealing JACOB HAASenergy_progress
08/29/2022Shutoff dampersJACOB HAASenergy_progress
08/29/2022HVAC and service water heating system controls JACOB HAASenergy_progress
08/29/2022Electrical motorsJACOB HAASenergy_progress
08/03/2022Mechanical SystemsJACOB HAASspecial
08/03/2022HVAC and service water heating system controls JACOB HAASenergy_progress
08/03/2022Shutoff dampersJACOB HAASenergy_progress
08/03/2022HVAC and service water heating equipment JACOB HAASenergy_progress
08/03/2022Electrical motorsJACOB HAASenergy_progress
08/03/2022HVAC insulation and sealing JACOB HAASenergy_progress
08/03/2022Maintenance informationJACOB HAASenergy_progress
08/03/2022FinalJACOB HAASprogress
08/03/2022Fire-Resistant Penetrations and JointsJACOB HAASspecial
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Whitman - Senior CenterCommunity FacilityFloor 1, Roof
Project B00777499 Alteration · LOC Issued · 07/22/2022
New York City Housing AuthorityGovernment / CivicFloor 1
Project B00390882 Alteration · LOC Issued · 10/14/2020
Project B00390951 Alteration · LOC Issued · 10/14/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
08/18/2026B00777499-S1Request digital key ↗
08/18/2026B00777499-P1Request digital key ↗
08/18/2026B00777499-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00390882-I1Request digital key ↗
08/15/2026B00390882-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00390951-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION7
12/22/2022340768903Open ↗
07/18/2022340768903Open ↗
04/19/2022340768903Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION3
01/22/2021340768903Open ↗
05/18/2018321053532Open ↗
09/12/2014321053532Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature21
08/30/2026B00777499-P1Open ↗
08/28/2026B00390882-I1Open ↗
08/28/2026B00390882-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/30/2026B00777499-P1Open ↗
08/30/2026B00777499-P1Open ↗
08/30/2026B00777499-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/18/2026B00777499-P2Open ↗
08/18/2026B00777499-P1Open ↗
08/18/2026B00777499-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
09/12/2014321053532Open ↗
07/24/2014321053532Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/15/2020340768903Open ↗
▸Trade Schedules & Equipment3
▸BISPLUMBING (PL) SIGNOFF1
12/16/2022340768903Open ↗
▸BISSCHEDULE B - PLUMBING1
07/24/2014321053532Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/16/2016321308697Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/18/2026B00777499-S1Open ↗
08/18/2026B00777499-I1Open ↗
08/13/2026B00390882-I1Open ↗
Showing 3 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
07/24/2014321053532Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/05/2016321308697Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
01/16/2023340768903Open ↗
04/20/2022340768903Open ↗
03/17/2022340768903Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/06/2022340768903Open ↗
▸BISLIGHTING CONTROLS1
04/06/2022340768903Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/07/2022340768903Open ↗
▸BISINTERIOR LIGHTING POWER1
04/06/2022340768903Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY9
01/09/2023340768903Open ↗
08/29/2022340768903Open ↗
04/20/2022340768903Open ↗
Showing 3 of 9 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/06/2022340768903Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
04/06/2022340768903Open ↗
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/18/2026B00777499-P2Open ↗
08/13/2026B00777499-P1Open ↗
08/13/2026B00777499-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)5
08/18/2026B00777499-P2Open ↗
08/13/2026B00777499-S1Open ↗
08/13/2026B00390882-I1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/17/2023340768903Open ↗
11/25/2016321308697Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026B00777499-S1Open ↗
08/13/2026B00390882-I1Open ↗
▸BISFINAL1
06/14/2022340768903Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/24/2014321053532Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
12/16/2022340768903Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/14/2022340768903Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
10/16/2020340768903Open ↗
11/25/2016321308697Open ↗
02/05/2016321308697Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/21/2022340768903Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
09/06/2022340768903Open ↗
06/14/2022340768903Open ↗
01/20/2021340768903Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
02/05/2016321308697Open ↗
07/24/2014321053532Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/15/2020340768903Open ↗