Roof29p · 5 filings · 20 docs
ArchitectureDMElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Structural
Subsequent filing made to include belly tank installed beneath new Emergency Generator on the roof of the building. Fuel Storage tank located on the first floor filed under intitial application. This is filed in conjunction with ALT I 123905658.
On file for this project
13 documents
Installation of Mechanical Systems in conjunction to ALT CO #123905658. to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
15 documents · 1 drawing sheet
Structural work throughout the building including construction of new elevator shaft, partial reconstruction of East CMU wall; infill of existing elevator shaft openings; all in conjunction with ALT I #123905658 & FO M00629667.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 635p · 3 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Structural
Plumbing & Sprinkler work in conjunction with Architectural drawings filed under Alteration Type I #123905658 to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
16 documents · 1 drawing sheet
Structural work throughout the building including construction of new elevator shaft, partial reconstruction of East CMU wall; infill of existing elevator shaft openings; all in conjunction with ALT I #123905658 & FO M00629667.
On file for this project
13 documents · 1 drawing sheet
Interior demolition of partitions, fixtures and finishes.
On file for this project
3 documents
Floor 542p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Plumbing & Sprinkler work in conjunction with Architectural drawings filed under Alteration Type I #123905658 to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
16 documents · 2 drawing sheets
Installation of Mechanical Systems in conjunction to ALT CO #123905658. to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
15 documents · 1 drawing sheet
Structural work throughout the building including construction of new elevator shaft, partial reconstruction of East CMU wall; infill of existing elevator shaft openings; all in conjunction with ALT I #123905658 & FO M00629667.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 442p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Plumbing & Sprinkler work in conjunction with Architectural drawings filed under Alteration Type I #123905658 to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
16 documents · 1 drawing sheet
Installation of Mechanical Systems in conjunction to ALT CO #123905658. to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
15 documents · 1 drawing sheet
Structural work throughout the building including construction of new elevator shaft, partial reconstruction of East CMU wall; infill of existing elevator shaft openings; all in conjunction with ALT I #123905658 & FO M00629667.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 342p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Plumbing & Sprinkler work in conjunction with Architectural drawings filed under Alteration Type I #123905658 to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
16 documents · 1 drawing sheet
Installation of Mechanical Systems in conjunction to ALT CO #123905658. to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
15 documents · 1 drawing sheet
Structural work throughout the building including construction of new elevator shaft, partial reconstruction of East CMU wall; infill of existing elevator shaft openings; all in conjunction with ALT I #123905658 & FO M00629667.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 241p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Plumbing & Sprinkler work in conjunction with Architectural drawings filed under Alteration Type I #123905658 to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
16 documents · 1 drawing sheet
Installation of Mechanical Systems in conjunction to ALT CO #123905658. to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
15 documents · 1 drawing sheet
Structural work throughout the building including construction of new elevator shaft, partial reconstruction of East CMU wall; infill of existing elevator shaft openings; all in conjunction with ALT I #123905658 & FO M00629667.
On file for this project
13 documents
Latest 3 of 4 filings on this floor.
Floor 151p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Subsequent filing made to include belly tank installed beneath new Emergency Generator on the roof of the building. Fuel Storage tank located on the first floor filed under intitial application. This is filed in conjunction with ALT I 123905658.
On file for this project
13 documents · 2 drawing sheets
Plumbing & Sprinkler work in conjunction with Architectural drawings filed under Alteration Type I #123905658 to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
16 documents · 3 drawing sheets
Installation of Mechanical Systems in conjunction to ALT CO #123905658. to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
15 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Cellar17p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Structural
New pile foundation & concrete walls for elevator pit. Demolish existing slab on grade. Infill existing cellar. New piles & partial foundation @ East property line. New reinforced concrete walls @ perimeter foundation, all filed in conj. w/ALT I 123905658
On file for this project
31 documents · 1 drawing sheet
Installation of Mechanical Systems in conjunction to ALT CO #123905658. to rehabilitate existing building for use as a Non-Profit Institution with Sleeping Accommodations.
On file for this project
15 documents
Structural work throughout the building including construction of new elevator shaft, partial reconstruction of East CMU wall; infill of existing elevator shaft openings; all in conjunction with ALT I #123905658 & FO M00629667.
On file for this project
13 documents
Latest 3 of 4 filings on this floor.
Site & exterior41p · 3 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
9 documents · 12 drawing sheets
INSTALLATION OF PIPE SCAFFOLDING, ROOF OF PROTECTION AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
15 documents · 12 drawing sheets
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents · 2 drawing sheets