1920Year Built
9.5Stories
D4Building Class
C1-8AZoning
46,621 sfGross Floor Area
38Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMP
Elevator cooperative · Owner of record: 105 W 73RD OWNERS CORP · 6,437 sf lot · 7.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof1 filing · 5 docs
Floor 71p · 3 filings · 12 docs
Floor 63 filings · 12 docs
Floor 5
Floor 4
Floor 32 filings · 12 docs
Floor 215p · 4 filings · 12 docs
Floor 1Under Construction10p · 6 filings · 18 docs
Site & exterior4 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOLSTICE RESIDENTIAL GROUP, LLC1507/08/2026
105 WEST 73RD STREET OWNERS1203/21/2026
105 WEST 73RD OWNER'S CORP.1003/21/2026
105 WEST 73 OWNERS803/21/2026
SPRING SCAFFOLDING LLC503/22/2026
CENTURY MANAGEMENT407/08/2026
105 W 73RD OWNERS CORP403/22/2026
105 WEST OWNERS CORP203/21/2026
105 WEST 73RD STREET103/21/2026
105 WEST 7103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JONATHAN B. HELD A.I.A.503/21/2026
EA DESIGN GROUP3403/21/2026
JULIAN A. GOMEZ203/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
AME SERVICES403/21/2026
GC1 EXPEDITING203/21/2026
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
AYE CONSULTING GROUP403/21/2026
RICHARD SWANSON103/21/2026
K M DOB CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor1407/08/2026
RAINIER RESTORATION LLCGeneral Contractor507/08/2026
ANDALORO CONSTRUCTION LLCGeneral Contractor407/08/2026
SKYLINE RESTORATION INCGeneral Contractor307/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
MODERN CITI GROUP INCGeneral Contractor303/21/2026
RENWOOD INTERIORS CORPGeneral Contractor303/21/2026
EXPRESS PLBG SEWR AND WTRPlumbing207/08/2026
AZM HOME IMPROVEMENTS INCGeneral Contractor209/16/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
PLUMBING & HTG DOCTOR INCPlumbing207/08/2026
CLEARCOM WIRELESS SERVICEGeneral Contractor107/08/2026
DIAMOND CONSTRUCTION PROPGeneral Contractor107/08/2026
EH PLUMBING & HEATING CORPlumbing107/08/2026
EZ RUNER CONSTRUCTION CORPPlumbing107/08/2026
CITI CONTRACTING OF NEW YGeneral Contractor107/08/2026
AERO ELECTRIC CORPElectrical103/21/2026
CARL WEISSElectrical103/21/2026
GUIDING LIGHT ELECTRIC INElectrical103/22/2026
IRVING BAPTISTEElectrical103/21/2026
MARTINEZ, EFRAINElectrical103/21/2026
VAN TON, PATElectrical103/21/2026
ALL MAKES HTG & A/C CORPGeneral Contractor107/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor107/08/2026
ARISTON CHIMNEY LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. SALEH ENGINEERING PLLC8427306/23/2026
FULLERTON ENGINEERING PC8636112/09/2024
AK ENGINEERING PC678508/05/2024
OUTSOURCE SPECIAL INSPECT2827105/04/2023
RAND ENGINEERING & ARCHIT266105/04/2023
AMHAC4867107/26/2022
JONATHAN B. HELD AIA ARCH1288104/26/2022
NEW YORK ENGINEERING ASSO851110/26/2021
Building Lifecycle
All (215)Filed (42)Permit Issued (37)Signed Off (18)Facade (FISP) (15)Violation (51)Inspection (16)Objection (6)Special Inspection (30)
09/15/2026
Permit issued — Mechanical Systems
M01409549-S2-MS
08/11/2026
Permit issued — General Construction
M01409549-I1-GC
06/23/2026
Filed — Alteration
Mechanical work in conjunction with interior renovation of Apt 1C on the 1st floor. Modifications of partitions, new flooring, cabinets, painting, etc. No change in use, egress or occupancy.
M01409549-S1
06/23/2026
Filed — Alteration
Mechanical work in conjunction with interior renovation of Apt 1C on the 1st floor. Modifications of partitions, new flooring, cabinets, painting, etc. No change in use, egress or occupancy.
M01409549-I1
06/23/2026
Filed — Alteration
Mechanical work in conjunction with interior renovation of Apt 1C on the 1st floor. Modifications of partitions, new flooring, cabinets, painting, etc. No change in use, egress or occupancy.
M01409549-S2
06/09/2026
Special inspection requirement — Lighting controls
Mohamed Saleh
06/09/2026
Special inspection requirement — Interior lighting power
Mohamed Saleh
06/02/2026
Special inspection requirement — Mechanical Systems
Mohamed Saleh
06/02/2026
Special inspection requirement — Final
Mohamed Saleh
05/29/2026
Special inspection requirement — Final
jessica nahon
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohamed Saleh
02/27/2026
Permit issued — General Construction
M00800127-I1-GC
12/21/2025
Violation issued (HPD, open)
B
08/26/2025
Signed off — Alteration
APPLICATION FILED FOR INTERIOR/EXTERIOR RENOVATION OF REAR YARD, 1ST, AND 2ND FL (APT 1AB & 2A). WORK INCLUDES INSTALLATION OF IN GROUND POOL AND COUNTER FOR BBQ GRILL AND SINK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00856757-I1
04/23/2025
Signed off — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS OF THE REAR YARD, 1ST, AND 2ND FLOOR (APT 1AB & 2A) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00975441-I1
04/23/2025
Signed off — Alteration
Application filed for plumbing modifications/additions on the 1st (APT 1A/B) and 2nd floor (APT 2A) as per plans filed herewith. No change in use, egress or occupancy.
M00856879-I1
04/21/2025
Signed off — Alteration
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS ON THE 1ST AND 2ND FLOOR (APT 1AB AND 2A) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00968015-I1
02/04/2025
Filed — Alteration
Application filed for plumbing modifications/additions on the 1st (APT 1A/B) and 2nd floor (APT 2A) as per plans filed herewith. No change in use, egress or occupancy.
M00856879-P7
02/03/2025
Permit issued — Antenna
M01146352-I1-AN
01/31/2025
Permit issued — Plumbing
M00856879-I1-PL
01/16/2025
Filed — Alteration
Application filed for plumbing modifications/additions on the 1st (APT 1A/B) and 2nd floor (APT 2A) as per plans filed herewith. No change in use, egress or occupancy.
M00856879-P6
01/13/2025
Objection resolved — Addressed
12/17/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/12/2024
Objection raised — Zoning
12/09/2024
Filed — Alteration
Carrier: Dish Wireless. New Antenna Installation. Install (2) exterior cabinets on a new platform on the roof. Install (3) new antennas, (3) new OVP devices, (1) GPS, and (6) new RRH units on water tank and bulkhead. In conformance w/ TPPN #5/98. No c
M01146352-I1
12/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/02/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/11/2024
Filed — Alteration
Application filed for plumbing modifications/additions on the 1st (APT 1A/B) and 2nd floor (APT 2A) as per plans filed herewith. No change in use, egress or occupancy.
M00856879-P5
10/31/2024
Permit issued — Plumbing
M00856879-I1-PL
09/17/2024
Filed — Alteration
Application filed for plumbing modifications/additions on the 1st (APT 1A/B) and 2nd floor (APT 2A) as per plans filed herewith. No change in use, egress or occupancy.
M00856879-P4
08/07/2024
Filed — Alteration
Application filed for plumbing modifications/additions on the 1st (APT 1A/B) and 2nd floor (APT 2A) as per plans filed herewith. No change in use, egress or occupancy.
M00856879-P3
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
08/06/2024
Special inspection requirement — Final
Cynthia Eng
08/05/2024
Filed — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS OF THE REAR YARD, 1ST, AND 2ND FLOOR (APT 1AB & 2A) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00975441-P1
08/05/2024
Filed — Alteration
Application filed for plumbing modifications/additions on the 1st (APT 1A/B) and 2nd floor (APT 2A) as per plans filed herewith. No change in use, egress or occupancy.
M00856879-P2
08/05/2024
Filed — Alteration
APPLICATION FILED FOR INTERIOR/EXTERIOR RENOVATION OF REAR YARD, 1ST, AND 2ND FL (APT 1AB & 2A). WORK INCLUDES INSTALLATION OF IN GROUND POOL AND COUNTER FOR BBQ GRILL AND SINK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00856757-P2
07/29/2024
Special inspection requirement — Final
Ari Kamo
07/29/2024
Special inspection requirement — Mechanical Systems
Ari Kamo
07/15/2024
Permit issued — General Construction
M00856757-I1-GC
07/15/2024
Permit issued — Mechanical Systems
M00975441-I1-MS
07/15/2024
Permit issued — Structural
M00968015-I1-ST
03/22/2024
Permit issued — Plumbing
M00856879-I1-PL
02/21/2024
Permit issued — General Construction
M00800127-I1-GC
02/15/2024
Signed off — Alteration
M00979641-I1
01/30/2024
Cycle 9 facade report signed — SWARMP
01/11/2024
Permit issued — Supported Scaffold
M00979641-I1-SF
01/10/2024
Filed — Alteration
M00979641-I1
01/09/2024
Filed — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS OF THE REAR YARD, 1ST, AND 2ND FLOOR (APT 1AB & 2A) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00975441-I1
01/09/2024
Filed — Alteration
Application filed for plumbing modifications/additions on the 1st (APT 1A/B) and 2nd floor (APT 2A) as per plans filed herewith. No change in use, egress or occupancy.
M00856879-P1
01/08/2024
Filed — Alteration
APPLICATION FILED FOR INTERIOR/EXTERIOR RENOVATION OF REAR YARD, 1ST, AND 2ND FL (APT 1AB & 2A). WORK INCLUDES INSTALLATION OF IN GROUND POOL AND COUNTER FOR BBQ GRILL AND SINK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00856757-P1
01/05/2024
Filed — Alteration
APPLICATION FILED FOR STRUCTURAL MODIFICATIONS/ADDITIONS ON THE 1ST AND 2ND FLOOR (APT 1AB AND 2A) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00968015-I1
12/12/2023
Cycle 9 facade report submitted
12/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
12/08/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Ari Kamo
12/08/2023
Special inspection requirement — Structural Steel - Welding
Ari Kamo
12/08/2023
Special inspection requirement — Structural Steel - Details
Ari Kamo
12/05/2023
Cycle 9 facade inspection completed
11/27/2023
Special inspection requirement — Final
Ari Kamo
11/22/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00891067-I1
Latest 60 of 215 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAZM HOME IMPROVEMENTS INC09/15/2026
DOB NOWGeneral ConstructionPermit IssuedAZM HOME IMPROVEMENTS INC08/11/2026
DOB NOWGeneral ConstructionPermit IssuedSKYLINE RESTORATION INC02/27/2026
DOB NOWAntennaPermit IssuedCLEARCOM WIRELESS SERVICE02/03/2025
DOB NOWPlumbingSigned-offEXPRESS PLBG SEWR AND WTR01/31/2025
DOB NOWPlumbingSigned-offEXPRESS PLBG SEWR AND WTR10/31/2024
DOB NOWGeneral ConstructionSigned-offRAINIER RESTORATION LLC07/15/2024
DOB NOWMechanical SystemsSigned-offRAINIER RESTORATION LLC07/15/2024
DOB NOWStructuralSigned-offRAINIER RESTORATION LLC07/15/2024
DOB NOWPlumbingSigned-offEZ RUNER CONSTRUCTION COR03/22/2024
DOB NOWGeneral ConstructionPermit IssuedSKYLINE RESTORATION INC02/21/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC01/11/2024
DOB NOWGeneral ConstructionPermit IssuedSKYLINE RESTORATION INC08/04/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/20/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/16/2023
DOB NOWGeneral ConstructionSigned-offRENWOOD INTERIORS CORP05/31/2023
DOB NOWGeneral ConstructionSigned-offANDALORO CONSTRUCTION08/22/2022
DOB NOWGeneral ConstructionSigned-offANDALORO CONSTRUCTION08/09/2022
DOB NOWMechanical SystemsSigned-offALL MAKES HTG & A/C CORP08/02/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC07/18/2022
DOB NOWGeneral ConstructionSigned-offANDALORO CONSTRUCTION06/07/2022
DOB NOWPlumbingSigned-offEH PLUMBING & HEATING COR02/18/2022
DOB NOWGeneral ConstructionSigned-offMODERN CITI GROUP INC02/08/2022
DOB NOWGeneral ConstructionSigned-offDIAMOND CONSTRUCTION PROP01/20/2022
DOB NOWMechanical SystemsPermit IssuedARISTON CHIMNEY LLC11/05/2021
DOB NOWPlumbingSigned-offMATHEW WEISS08/26/2021
DOB NOWGeneral ConstructionSigned-offCITI CONTRACTING OF NEW Y06/23/2021
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT03/19/2021
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT11/06/2020
DOB NOWSupported ScaffoldSigned-offCENTRAL CONSTRUCTION MANAGEMENT11/06/2020
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT08/19/2020
DOB NOWSupported ScaffoldSigned-offCENTRAL CONSTRUCTION MANAGEMENT08/07/2020
DOB NOWPlumbingSigned-offMATHEW WEISS07/31/2020
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT10/30/2019
DOB NOWSupported ScaffoldSigned-offCENTRAL CONSTRUCTION MANAGEMENT08/14/2019
DOB NOWSupported ScaffoldSigned-offCENTRAL CONSTRUCTION MANAGEMENT11/27/2018
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT11/15/2018
BISOTISSUEDSPACE CONSTRUCTION LLC04/19/2021
BISOTISSUEDDJM NYC, LLC02/12/2021
BISOTISSUEDSPACE CONSTRUCTION LLC06/17/2020
+ 47 more permits on file
2 projects · most recent 06/23/2026
Others Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2026Permit IssuedAZM HOME IMPROVEMENTS INCOthers
Other
Aeropure AERO PURE ABF110DH 50 CFM · Exhaust Fan ×2
Fisher & Paykel Fisher & Paykel HPB3611-4_N 400 CFM · Kitchen Exhaust ×1
08/05/2024Signed-offRAINIER RESTORATION LLCAir Conditioning Systems
Cooling
Mitsubishi Electric MSZ-FH12NA 24,000 BTU · Split System ×2
MXZ-3C24NA 24,000 BTU · Split System ×2
MSZ-GS12NA 24,000 BTU · Split System ×2
1 project · most recent 06/23/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/23/2026——Gas, Water/Sanitary
18 projects · most recent 08/26/2026
General Wiring
FiledStatusContractorScope
08/26/2026CompleteDAVEN ELECTRIC CORPGeneral Wiring
08/17/2026Permit IssuedMUM ELECTRICAL CORPGeneral Wiring
06/16/2025Permit IssuedT.M.T ELECTRIC INCGeneral Wiring
12/18/2024Permit IssuedE.C. ELECL CONTRACTOR INCGeneral Wiring
06/18/2023CompleteTOP NOTCH ELECTRIC INCGeneral Wiring
06/15/2023CompleteBOROWIDE ELECT'L CONTR'S—
07/12/2022CompleteMEGA ELEC'L CONTR'G, INCGeneral Wiring
01/03/2022CompleteCRESCO ELECTRICAL CORPGeneral Wiring
10/19/2021CompleteCRESCO ELECTRICAL CORP—
10/14/2021Permit IssuedMARTIN DORKINGeneral Wiring
09/20/2021CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
07/07/2021Permit IssuedA & S MASTER ELEC'L CORPGeneral Wiring
05/05/2019CompleteRITE-UP ELECTRIC INC.—
12/18/2018CompleteALEF ELEC'L CONTR'G INCGeneral Wiring
10/31/2018CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
12/17/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/02/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/26/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/27/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/08/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
06/09/2026Lighting controlsMohamed Salehenergy_progress
06/09/2026Interior lighting powerMohamed Salehenergy_progress
06/02/2026Mechanical SystemsMohamed Salehspecial
06/02/2026FinalMohamed Salehprogress
05/29/2026Finaljessica nahonprogress
05/29/2026Fire-Resistant Penetrations and JointsMohamed Salehspecial
08/06/2024Fire-Resistant Penetrations and JointsAri Kamospecial
08/06/2024FinalCynthia Engprogress
07/29/2024FinalAri Kamoprogress
07/29/2024Mechanical SystemsAri Kamospecial
12/08/2023Structural Stability – Alterations of existing buildingsAri Kamospecial
12/08/2023Structural Steel - High Strength BoltingAri Kamospecial
12/08/2023Structural Steel - WeldingAri Kamospecial
12/08/2023Structural Steel - DetailsAri Kamospecial
11/27/2023FinalAri Kamoprogress
03/22/2023FinalBrett Riegerprogress
03/22/2023MasonryYevgeniy Gurevichspecial
03/22/2023Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
03/22/2023Post-installed AnchorsYevgeniy Gurevichspecial
03/22/2023Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
04/22/2022Energy Code Compliance InspectionsJONATHAN HELDprogress
04/22/2022Fire-Resistant Penetrations and JointsJONATHAN HELDspecial
04/22/2022Post-installed AnchorsJONATHAN HELDspecial
04/22/2022Fire-Resistance Rated ConstructionJONATHAN HELDprogress
04/22/2022Air barrier - visual inspectionJONATHAN HELDenergy_progress
Latest 25 of 39.
▾Documents — 408 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch37
09/06/2026M00095452-I1Request digital key ↗
09/06/2026M00097633-I1Request digital key ↗
09/03/2026M00536890-I1Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00346717-I1Request digital key ↗
08/15/2026M00346717-P1Request digital key ↗
▸Applications & Permits95
▸DOB NOWLPC Approval/Permit35
09/03/2026M00536890-I1Open ↗
09/03/2026M00644899-I1Open ↗
08/26/2026M00975441-I1Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION32
06/19/2020123878704Open ↗
03/08/2019123456811Open ↗
03/08/2019123456811Open ↗
Showing 3 of 32 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION26
04/01/2021140983416Open ↗
08/18/2020123878704Open ↗
02/26/2019123456811Open ↗
Showing 3 of 26 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
11/12/2021123878704Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/05/2020123878704Open ↗
▸Seals & Professional Certifications98
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/06/2026M00095452-I1Open ↗
09/03/2026M00536890-I1Open ↗
09/03/2026M00537503-P2Open ↗
Showing 3 of 40 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
10/30/2018123012596Open ↗
07/13/2018123456811Open ↗
04/30/2018123456811Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026M00095452-I1Open ↗
08/30/2026M00537503-I1Open ↗
08/30/2026M00537503-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/29/2026M01409549-S2Open ↗
08/28/2026M01409549-I1Open ↗
08/27/2026M00968015-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/09/2017121682394Open ↗
01/28/2016122648331Open ↗
08/09/2013121682394Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/08/2017140684043Open ↗
08/09/2017121682394Open ↗
01/28/2016122648331Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/09/2013121682394Open ↗
08/20/2012121345044Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/01/2021140983416Open ↗
09/08/2017140684043Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/08/2017140684043Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/01/2021140983416Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING5
09/08/2017140684043Open ↗
11/14/2013121826578Open ↗
08/09/2013121682394Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
02/23/2018123012596Open ↗
02/13/2018123012596Open ↗
08/16/2017123012596Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
08/21/2017121682394Open ↗
08/16/2017121682394Open ↗
08/09/2013121682394Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
09/19/2014121682394Open ↗
06/01/2009110452448Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/30/2018123012596Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes4
05/05/2020123878704Open ↗
04/30/2018123456811Open ↗
09/21/2017123012596Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00346717-P1Open ↗
08/13/2026M00346717-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/19/2017123012596Open ↗
▸Environmental & Asbestos44
▸DOB NOWDEP ACP-5: Asbestos Assessment Report35
09/03/2026M00536890-I1Open ↗
09/03/2026M00537503-P2Open ↗
09/03/2026M00537503-P1Open ↗
Showing 3 of 35 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
05/05/2020123878704Open ↗
04/30/2018123456811Open ↗
09/08/2017140684043Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
10/30/2018123012596Open ↗
07/13/2018123456811Open ↗
04/30/2018123456811Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
11/15/2021123878704Open ↗
11/11/2021123878704Open ↗
04/08/2021123456811Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/03/2026M00536890-I1Open ↗
08/13/2026M00537503-I1Open ↗
09/03/2026M00644899-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/08/2021123456811Open ↗
05/24/2016122648331Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
04/01/2021140983416Open ↗
09/08/2017140684043Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/15/2021123878704Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY10
11/17/2021123878704Open ↗
11/11/2021123878704Open ↗
11/11/2021123878704Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs21
▸BISLANDMARKS APPROVAL6
05/20/2020123878704Open ↗
07/13/2018123456811Open ↗
09/26/2017123012596Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/18/2021123878704Open ↗
04/08/2021123456811Open ↗
10/30/2018123012596Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
08/09/2013121682394Open ↗
08/20/2012121345044Open ↗
Showing 2 of 4 on file for this type
▸BISFINAL2
11/17/2021123878704Open ↗
11/16/2021123878704Open ↗
▸BISLANDMARKS SIGNOFF2
11/12/2021123878704Open ↗
04/08/2021123456811Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M00856757-P2Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00800127-I1Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT14
04/08/2021123456811Open ↗
04/08/2021123456811Open ↗
05/05/2020123878704Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/11/2021123878704Open ↗
▸Filing & Intake Forms26
▸BISEFILING COVER SHEET11
04/29/2020123878704Open ↗
04/30/2018123456811Open ↗
08/16/2017123012596Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM7
06/19/2020123878704Open ↗
02/26/2019123456811Open ↗
02/14/2019123456811Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION6
08/31/2020123878704Open ↗
04/18/2018123012596Open ↗
09/19/2017123012596Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
04/01/2021140983416Open ↗
09/08/2017140684043Open ↗
▸Other Documents14
▸DOB NOWProof of Historic Building12
08/26/2026M00975441-I1Open ↗
08/25/2026M00856879-P6Open ↗
08/25/2026M00856879-P4Open ↗
Showing 3 of 12 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
09/22/2017123012596Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/18/2018123012596Open ↗