💬 Discuss this project
1958Year Built
20Stories
D4Building Class
R10Zoning
190,640 sfGross Floor Area
94Units
LL97 CoveredRent Stabilized1 Active Violation 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: 1050 5th Avenue · 14,475 sf lot · 13.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofTemporary supported scaffold installation18p · 3 filings · 20 docs
PenthouseUnit PHB2 filings · 6 docs
Floor 20Unit 20C14p · 3 filings · 13 docs
Floor 19
Floor 181p · 1 filing · 10 docs
Floor 17Unit 17C, Unit 17D, Unit 18BCUnder Construction30p · 5 filings · 20 docs
Floor 16
Floor 15Unit 15D, Unit 15E, Unit 15F24p · 5 filings · 20 docs
Floor 14
Floor 13
Floor 12Unit 12E14p · 2 filings · 18 docs
Floor 11Unit 11D, Unit 11E25p · 2 filings · 18 docs
Floor 10Unit 9AUnder Construction6p · 1 filing · 10 docs
Floor 9
Floor 8Unit 8B, Unit 8D, Unit 8F13p · 4 filings · 20 docs
Floor 7Unit 7D, Unit 7F, Unit 7L26p · 4 filings · 20 docs
Floor 6Unit 6A, Unit 6F28p · 2 filings · 20 docs
Floor 510p · 1 filing · 20 docs
Floor 4Unit 4B, Unit 4DUnder Construction18p · 3 filings · 13 docs
Floor 3
Floor 2Unit 2B, Unit 2BC13p · 1 filing · 10 docs
Floor 1Sidewalk shed installation2p · 1 filing · 2 docs
CellarSidewalk vault shoring1p · 1 filing · 4 docs
Site & exteriorBrown Harris Stevens RES. MGT. LLC34p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1050 Fifth Avenue6903/21/2026
1050 5th Ave1803/22/2026
Bernard Anne Spitzer Trust603/21/2026
WJE307/08/2026
1050 Lexington Ave303/21/2026
Lundquist Group203/22/2026
Lauder Investments203/21/2026
Brown, Harris, Stevens110/13/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
West New York Restoration of CTScaffold1607/08/2026
Silverlining InteriorsGeneral Contractor707/08/2026
Radius ConstructionGeneral Contractor707/08/2026
JTK Home ImprovementGeneral Contractor607/08/2026
I & H ConstructionGeneral Contractor507/08/2026
West New York Restoration of CTspecialty_contractor407/08/2026
Atlas Pro ConstructionScaffold307/08/2026
Manhattan Cabinetsspecialty_contractor303/21/2026
Master 2 Plumbing & HeatingPlumbing307/08/2026
Aqueduct MechanicalPlumbing307/08/2026
Structural Preservation *General Contractor303/21/2026
Colgate RestorationScaffold307/08/2026
BNY ConstructionGeneral Contractor307/08/2026
Amn PlumbingPlumbing307/08/2026
Donato PlumbingPlumbing207/08/2026
P.S. Marcato Elev. CoElectrical203/21/2026
Trince ElectricElectrical203/21/2026
Cortlandt ContractingGeneral Contractor207/08/2026
DMC Professional ContractorsGeneral Contractor203/21/2026
Edgar BayramiGeneral Contractor208/12/2026
Jestcor ContractingGeneral Contractor203/21/2026
Kalinic ConstructionGeneral Contractor203/21/2026
EH Plumbing & HeatingPlumbing207/08/2026
MCM Plumbing & HeatingPlumbing207/08/2026
New Millennium P & HPlumbing207/08/2026
Practical Plumbing & HeatingPlumbing207/02/2026
Z.W. Plumbing & HeatingPlumbing207/08/2026
Vlora Design & BuildersGeneral Contractor107/08/2026
Wall To Wall Constructio*General Contractor107/08/2026
Deboccia Electric ConstructionElectrical103/21/2026
K & R Electric CoElectrical103/21/2026
Mega Electrical ContractingElectrical103/21/2026
Empire Scaffolding SystemScaffold107/08/2026
Delco ElectricalElectrical103/21/2026
J.G.C. ElectricElectrical103/22/2026
Icon ElectricElectrical103/22/2026
Deluca JohnElectrical103/21/2026
Testerman Plumbing & HeatingPlumbing107/08/2026
HI-Tech Plumbing & HeatingPlumbing107/08/2026
Jodom MechanicalPlumbing107/08/2026
L.J.F. Electric CoElectrical103/21/2026
Procore MechanicalPlumbing107/08/2026
Monarch Plumbing & HeatingPlumbing108/22/2026
Shaw MechanicalPlumbing107/08/2026
GTB General ContractorGeneral Contractor107/08/2026
MSV BuildersGeneral Contractor109/07/2026
Green ConversionsGeneral Contractor107/08/2026
Atlas & Design ContractorsGeneral Contractor107/08/2026
Vma ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CES Engineering1277409/30/2026
A2 Architect2504307/14/2026
Delta Testing Labs687506/09/2026
Mark Gould Architect1933404/30/2026
Fsi Architecture354308/06/2025
Jon Libasci3068212/18/2024
Steven Michael Peterson S2035212/18/2024
Integrity Consulting Service666203/29/2024
KZ Engineering4665302/07/2024
Tan Engineering1291307/21/2023
Alan Margolin & Associates423306/14/2023
Michael Gray Architect4478102/27/2023
Doyun Kim; RA7415110/24/2022
Age Engineering6695209/19/2022
Twig Special Inspections885106/16/2022
Lawrence V McDonald Architects6039112/03/2021
Constant and Brown Engineering7565208/01/2021
Bwarchitects3914107/06/2021
WW Engineering7502112/07/2020
Vincent J. Liotta P. E1974101/08/2020
Building Lifecycle
All (300)Filed (73)Permit Issued (80)Signed Off (41)Facade (FISP) (15)Violation (48)Inspection (43)
10/15/2026
Signed off — Alteration
REPLACEMENT OF PLUMBING FIXTURES (LAVATORY, TOILET, SHOWER, HAND SHOWER, ANDSHOWER FLOOR DRAIN) AT EXISTING LOCATIONS
M01371236-I1
09/30/2026
Filed — Alteration
plumbing work associated with the duplex apartment renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00704461-P4
09/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/18/2026
Signed off — Alteration
Filing herewith plans showing partial Plumbing work inside Apt 18BC, on the 17th floor as per plans submitted. No change in use, Egress or Occupancy under this application.
M01032903-I1
09/17/2026
Signed off — Alteration
Filing herewith plans showing interior renovation work inside Apt 18BC, on the 17th floor as per plans submitted. No change in use, Egress or Occupancy under this application.
M01027276-I1
08/31/2026
Signed off — Alteration
MATERIAL HOIST. FOR MATERIAL ONLY. NO WORK FROM HOIST.
M01413144-I1
08/21/2026
Permit issued — Plumbing
M01371236-S1-PL
08/11/2026
Permit issued — Mechanical Systems
M01354234-S2-MS
08/04/2026
Permit issued — General Construction
M01371236-I1-GC
08/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/14/2026
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 17D ON THE 17TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01354234-S2
06/17/2026
Permit issued — Suspended Scaffold
M01413144-I1-SC
06/09/2026
Filed — Alteration
Filing herewith plans showing partial Mechanical work inside Apt 18BC, on the 17th floor as per plans submitted. No change in use, Egress or Occupancy under this application.
M01032870-P1
06/06/2026
Filed — Alteration
MATERIAL HOIST. FOR MATERIAL ONLY. NO WORK FROM HOIST.
M01413144-I1
05/28/2026
Filed — Alteration
REPLACEMENT OF PLUMBING FIXTURES (LAVATORY, TOILET, SHOWER, HAND SHOWER, ANDSHOWER FLOOR DRAIN) AT EXISTING LOCATIONS
M01371236-S1
05/20/2026
Permit issued — Plumbing
M01384834-S1-PL
05/15/2026
Permit issued — General Construction
M01384834-I1-GC
05/06/2026
Filed — Alteration
Filing herewith plans showing partial Plumbing work inside Apt 18BC, on the 17th floor as per plans submitted. No change in use, Egress or Occupancy under this application.
M01032903-P1
04/30/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CONNECTION WITH THE RENOVATION OF APARTMENT 4D (4TH FLOOR), AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01384834-S1
04/30/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CONNECTION WITH THE RENOVATION OF APARTMENT 4D (4TH FLOOR), AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01384834-I1
04/29/2026
Violation issued (HPD, open)
A
04/21/2026
Permit issued — Plumbing
M01032903-I1-PL
03/27/2026
Filed — Alteration
REPLACEMENT OF PLUMBING FIXTURES (LAVATORY, TOILET, SHOWER, HAND SHOWER, ANDSHOWER FLOOR DRAIN) AT EXISTING LOCATIONS
M01371236-I1
03/24/2026
Permit issued — Plumbing
M00704461-S1-PL
03/20/2026
Permit issued — General Construction
M01354234-I1-GC
03/18/2026
Permit issued — Plumbing
M01354234-S1-PL
02/18/2026
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 17D ON THE 17TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01354234-S1
02/18/2026
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 17D ON THE 17TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01354234-I1
01/27/2026
Signed off — Alteration
PLUMBING FIXTURES IN APT 15D FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01118455-S1
01/27/2026
Filed — Alteration
plumbing work associated with the duplex apartment renovation as shown on plans filed herewith. no change to use, egress, or occupancy.
M00704461-P3
12/12/2025
Permit issued — General Construction
M01027276-I1-GC
12/11/2025
Permit issued — Mechanical Systems
M01032870-I1-MS
11/17/2025
Violation issued (HPD, closed)
I
10/03/2025
Signed off — Alteration
M01261395-I1
09/22/2025
Signed off — Alteration
PROPOSED INTERIOR NON-STRUCTURAL INTERIOR MODIFICATION INCLUDING THE MODIFICATION OF THE KITCHEN, BATHROOMS, AND FINISHES THROUGHOUT. NO CHANGE IN USE , OCCUPANCY OR EGRESS IS PROPOSED IN THIS APPLICATION.
M01131296-S1
09/19/2025
Permit issued — Structural
M01261395-I1-ST
09/10/2025
Filed — Alteration
PLUMBING FIXTURES IN APT 15D FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01118455-P2
09/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/29/2025
Signed off — Alteration
PROPOSED INTERIOR NON-STRUCTURAL INTERIOR MODIFICATION INCLUDING THE MODIFICATION OF THE KITCHEN, BATHROOMS, AND FINISHES THROUGHOUT. NO CHANGE IN USE , OCCUPANCY OR EGRESS IS PROPOSED IN THIS APPLICATION.
M01131296-I1
08/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/21/2025
Signed off — Alteration
PLUMBING FIXTURES IN APT 15D FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01118455-I1
08/11/2025
Filed — Alteration
PLUMBING FIXTURES IN APT 15D FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01118455-P1
08/06/2025
Filed — Alteration
M01261395-I1
07/16/2025
Signed off — Alteration
FILING INTERIOR ALTERATION TO APT. 6F. WORK INCLUDES RENOVATION OF EXISTING BATHROOMS & KITCHEN, NEW INTERIOR FINISHES, WINDOW REPLACEMENT, NEW LIGHTING AND POWER UPGRADE PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01044070-S1
07/16/2025
Signed off — Alteration
FILING INTERIOR ALTERATION TO APT. 6F. WORK INCLUDES RENOVATION OF EXISTING BATHROOMS & KITCHEN, NEW INTERIOR FINISHES, WINDOW REPLACEMENT, NEW LIGHTING AND POWER UPGRADE PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01044070-I1
07/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2025
Permit issued — Mechanical Systems
M01032870-I1-MS
06/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2025
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00707062-I1
03/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/18/2025
Cycle 9 facade report signed — SAFE
03/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/27/2025
Permit issued — Sidewalk Shed
M00707062-I1-SH
02/13/2025
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M08054103-I1
02/13/2025
Signed off — Alteration
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M08054151-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMonarch Plumbing & Heating08/21/2026
DOB NOWMechanical SystemsPermit IssuedEdgar Bayrami08/11/2026
DOB NOWGeneral ConstructionSigned-offMSV Builders08/04/2026
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co06/17/2026
DOB NOWPlumbingPermit IssuedAmn Plumbing05/20/2026
DOB NOWGeneral ConstructionPermit IssuedJTK Home Improvement05/15/2026
DOB NOWPlumbingSigned-offPractical Plumbing & Heating04/21/2026
DOB NOWPlumbingPermit IssuedJames Cruz03/24/2026
DOB NOWGeneral ConstructionPermit IssuedEdgar Bayrami03/20/2026
DOB NOWPlumbingPermit IssuedMaster 2 Plumbing & Heating03/18/2026
DOB NOWGeneral ConstructionSigned-offI H Construction12/12/2025
DOB NOWMechanical SystemsSigned-offI H Construction12/11/2025
DOB NOWStructuralSigned-offA. Peter Luger Construction09/19/2025
DOB NOWMechanical SystemsSigned-offI H Construction07/07/2025
DOB NOWSidewalk ShedSigned-offA. Peter Luger Construction02/27/2025
DOB NOWPlumbingSigned-offAqueduct Mechanical02/04/2025
DOB NOWGeneral ConstructionSigned-offGTB General Contractor01/31/2025
DOB NOWPlumbingSigned-offProcore Mechanical01/22/2025
DOB NOWGeneral ConstructionSigned-offManhattan Cabinets01/21/2025
DOB NOWSupported ScaffoldSigned-offA. Peter Luger Construction01/14/2025
DOB NOWPlumbingSigned-offPractical Plumbing & Heating08/15/2024
DOB NOWGeneral ConstructionSigned-offI H Construction08/01/2024
DOB NOWMechanical SystemsSigned-offI H Construction08/01/2024
DOB NOWPlumbingSigned-offAqueduct Mechanical07/22/2024
DOB NOWGeneral ConstructionSigned-offVlora Design & Builders07/16/2024
DOB NOWGeneral ConstructionPermit IssuedRadius Construction05/07/2024
DOB NOWPlumbingSigned-offAmn Plumbing04/09/2024
DOB NOWGeneral ConstructionSigned-offJTK Home Improvement04/05/2024
DOB NOWSidewalk ShedSigned-offA. Peter Luger Construction02/29/2024
DOB NOWSidewalk ShedSigned-offA. Peter Luger Construction02/27/2024
DOB NOWGeneral ConstructionSigned-offA. Peter Luger Construction02/23/2024
DOB NOWSuspended ScaffoldPermit IssuedWest New York Restoration02/06/2024
DOB NOWProtection and Mechanical MethodsSigned-offA. Peter Luger Construction01/16/2024
DOB NOWSupported ScaffoldSigned-offA. Peter Luger Construction01/16/2024
DOB NOWGeneral ConstructionSigned-offJTK Home Improvement10/11/2023
DOB NOWPlumbingSigned-offAmn Plumbing08/01/2023
DOB NOWGeneral ConstructionSigned-offJTK Home Improvement07/27/2023
DOB NOWPlumbingSigned-offMCM Plumbing & Heating07/24/2023
DOB NOWGeneral ConstructionPermit IssuedRadius Construction05/31/2023
DOB NOWPlumbingSigned-offDonato Plumbing05/16/2023
+ 60 more permits on file
1 project · most recent 06/09/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/09/2026Signed-offI & H ConstructionAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric PUMY-HP60NKMU3051 5 tons · Vrf Outdoor ×1
PUMY-HP60NKMU3052 5 tons · Vrf Outdoor ×1
MXZ-SM60NAM2-U1 5 tons · Condensing Unit ×2
Heating
Mitsubishi Electric PVFY-P18NAMU-E1 500 CFM · Vrf Indoor ×4
PEFY-P12NMAU-E4 350 CFM · Vrf Indoor ×2
PKFY-P08NLMU-E 200 CFM · Vrf Indoor ×2
PVFY-P12NAMU-E1 350 CFM · Vrf Indoor ×2
PVFY-P24NAMU-E1 650 CFM · Vrf Indoor ×2
PVFY-P54NAMU-E1 1,250 CFM · Vrf Indoor ×2
6 projects · most recent 09/30/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/30/2026Permit IssuedShaw MechanicalGas, Water/Sanitary
07/14/2026Permit IssuedMaster 2 Plumbing & HeatingGas, Water/Sanitary
05/28/2026Permit IssuedMonarch Plumbing & HeatingWater/Sanitary
05/06/2026Signed-offPractical Plumbing & HeatingGas, Water/Sanitary
04/30/2026Permit IssuedAmn PlumbingWater/Sanitary
12/18/2024Signed-offDonato PlumbingGas, Water/Sanitary
25 projects · most recent 10/07/2026
General Wiring Lighting
FiledStatusContractorScope
10/07/2026Permit IssuedVma ElectricalGeneral Wiring
09/18/2026CompleteL.J.F. & Sons Electrical ContsGeneral Wiring
04/13/2026CompleteEtech ElectricalGeneral Wiring
03/13/2026Permit IssuedNelson & Tom Maintenance Inc DBGeneral Wiring
08/09/2025CompleteA.C. Morgan ElectricGeneral Wiring
01/27/2025CompleteFiu Corp Dba Fiu ElectricGeneral Wiring
07/26/2024CompleteIcon ElectricGeneral Wiring
04/08/2024CompleteNash Electric Services—
01/15/2024CompleteGlendale Electl Contng—
10/24/2023CompleteVma ElectricalGeneral Wiring
09/26/2023CompleteZip ElectricGeneral Wiring
06/05/2023CompleteSuper Charged ElectricGeneral Wiring
05/06/2023CompleteVma ElectricalGeneral Wiring
05/02/2023CompleteMartinez Electrical ContGeneral Wiring
04/19/2023CompleteAccurate ElectricalGeneral Wiring
1 project · most recent 05/04/2022
Steel
FiledStatusContractorScope
05/04/2022——Steel
1 project · most recent 11/21/2017
Sidewalk Shed
FiledStatusContractorScope
11/21/2017Permit IssuedEmpire Scaffolding SystemSidewalk Shed
1 project · most recent 06/06/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/06/2026Signed-offRosenwach Tank CoSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 43
DateTypeResultReport
09/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 43.
▾Special Inspection Requirements (DOB NOW) — 91
DateRequirementInspectorRole
09/24/2026Fire-Resistant Penetrations and JointsDelbert Smithspecial
07/27/2026Heating SystemsRICHARD GREENWALDspecial
07/27/2026Tenant Protection Plan ComplianceRICHARD GREENWALDspecial
07/27/2026Energy Code Compliance InspectionsRICHARD GREENWALDprogress
07/27/2026FinalRICHARD GREENWALDprogress
07/27/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
07/27/2026Mechanical SystemsRICHARD GREENWALDspecial
06/26/2026HVAC-R and service water heating equipmentAnn Macklinenergy_progress
06/26/2026Energy Code Compliance InspectionsAnn Macklinprogress
06/26/2026HVAC-R and service water heating system controlsAnn Macklinenergy_progress
05/28/2026Interior lighting powerAlex Shueyenergy_progress
05/23/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
04/09/2026Fire-Resistant Penetrations and JointsMark Gouldspecial
03/13/2026FinalAlex Shueyprogress
02/18/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
02/09/2026FinalAnn Macklinprogress
02/09/2026Mechanical SystemsAnn Macklinspecial
02/02/2026FinalAnn Macklinprogress
02/02/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
02/02/2026Energy Code Compliance InspectionsAnn Macklinprogress
02/02/2026Lighting in dwelling unitsAnn Macklinenergy_progress
01/29/2026Fire-Resistant Penetrations and JointsDelbert Smithspecial
12/26/2024Fire-Resistant Penetrations and Jointsjon libascispecial
12/26/2024FinalGABRIEL HODGEprogress
12/16/2024Lighting controlsSteven Petersonenergy_progress
Latest 25 of 91.
▾Documents — 1,241 on file (BIS + DOB NOW)
▸Plans & Drawings67
▸DOB NOWPlans/Sketch55
09/06/2026M00002772-I1Request digital key ↗
09/03/2026M00539085-S1Request digital key ↗
09/03/2026M00539085-I1Request digital key ↗
Showing 3 of 55 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00255062-P1Request digital key ↗
09/03/2026M00405254-P1Request digital key ↗
09/02/2026M00396498-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00254341-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00185317-I1Request digital key ↗
09/05/2026M00201065-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00324463-I1Request digital key ↗
▸Applications & Permits246
▸BISWORK PERMIT APPLICATION102
12/18/2023100255019Open ↗
10/24/2023103678030Open ↗
07/15/2022123660733Open ↗
Showing 3 of 102 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION86
04/09/2024103678030Open ↗
01/11/2024100255019Open ↗
12/01/2023100255019Open ↗
Showing 3 of 86 on file for this type
▸DOB NOWLPC Approval/Permit56
10/05/2026M00704461-P4Open ↗
09/02/2026M00704694-I1Open ↗
09/02/2026M00704694-P1Open ↗
Showing 3 of 56 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/24/2020140973944Open ↗
▸BISDOT Permit - House Connection1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications261
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION95
02/25/2020123749300Open ↗
02/25/2020123749300Open ↗
02/25/2020123749300Open ↗
Showing 3 of 95 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature66
10/05/2026M00704461-P4Open ↗
09/06/2026M00002772-I1Open ↗
09/05/2026M00185317-I1Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWProgress Inspector Seal & Signature48
09/28/2026M00833980-I1Open ↗
09/28/2026M00833980-I1Open ↗
09/28/2026M00833980-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
10/08/2026M00582678-I1Open ↗
10/05/2026M00704461-P4Open ↗
09/28/2026M00833980-I1Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/31/2020140987127Open ↗
11/24/2020140973944Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/31/2020140987127Open ↗
11/24/2020140973944Open ↗
▸Trade Schedules & Equipment84
▸BISSELF-CERT PLUMBING NOTICE44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸BISSCHEDULE B - PLUMBING23
04/09/2024103678030Open ↗
01/11/2024100255019Open ↗
11/18/2022103678030Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
06/25/2019123749300Open ↗
01/23/2019123660733Open ↗
Showing 2 of 17 on file for this type
▸Safety & Tenant Protection26
▸BISTenant Protection Plan and Notes10
12/17/2019123867440Open ↗
06/25/2019123749300Open ↗
05/13/2019123807862Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE5
11/26/2019123660733Open ↗
11/26/2019123660733Open ↗
11/26/2019123660733Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/26/2019123660733Open ↗
▸Environmental & Asbestos100
▸DOB NOWDEP ACP-5: Asbestos Assessment Report49
10/05/2026M00704461-P4Open ↗
09/03/2026M00582651-I1Open ↗
09/02/2026M00704694-P1Open ↗
Showing 3 of 49 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)23
12/31/2020140987127Open ↗
11/24/2020140973944Open ↗
01/07/2020123867440Open ↗
Showing 3 of 23 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/05/2026M00254341-I1Open ↗
09/03/2026M00546347-I1Open ↗
08/25/2026M00741014-I1Open ↗
Showing 3 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM5
08/16/2021123807862Open ↗
10/24/2019123807862Open ↗
Showing 2 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance82
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS40
01/07/2020123867440Open ↗
12/17/2019123867440Open ↗
11/26/2019123660733Open ↗
Showing 3 of 40 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS18
07/25/2023123660733Open ↗
04/22/2021123867440Open ↗
11/14/2018122216173Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/25/2023123660733Open ↗
01/27/2022123660733Open ↗
01/04/2022140987127Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/31/2020140987127Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/04/2022140987127Open ↗
04/22/2021123867440Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/18/2022140987127Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE1
07/10/2019123749300Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
12/31/2020140987127Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY16
01/11/2024100255019Open ↗
01/10/2024100255019Open ↗
12/14/2023100255019Open ↗
Showing 3 of 16 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
02/22/2024100255019Open ↗
12/12/2022103678030Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/18/2022140987127Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/07/2022140973944Open ↗
▸Approvals, Objections & Sign-offs141
▸BISLANDMARKS APPROVAL54
03/10/2021140973944Open ↗
02/01/2021140987127Open ↗
12/17/2019123867440Open ↗
Showing 3 of 54 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST38
05/16/2024103678030Open ↗
02/26/2024100255019Open ↗
07/26/2023123660733Open ↗
Showing 3 of 38 on file for this type
▸BISADMINISTRATIVE OBJECTIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
12/09/2021123660733Open ↗
01/26/2021140987127Open ↗
Showing 2 of 14 on file for this type
▸BISLANDMARKS SIGNOFF6
07/26/2023123660733Open ↗
12/01/2022103678030Open ↗
04/11/2022140973944Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER6
12/18/2023100255019Open ↗
10/24/2023103678030Open ↗
12/16/2020123807862Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL2
04/07/2022140973944Open ↗
01/18/2022140987127Open ↗
▸DOB NOWLandmark Approval2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership101
▸BISCOST AFFIDAVIT91
02/26/2024100255019Open ↗
01/27/2022123660733Open ↗
08/16/2021123807862Open ↗
Showing 3 of 91 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
07/25/2023123660733Open ↗
04/07/2022140973944Open ↗
01/04/2022140987127Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms93
▸BISEFILING COVER SHEET38
12/17/2019123867440Open ↗
06/25/2019123749300Open ↗
06/25/2019123749300Open ↗
Showing 3 of 38 on file for this type
▸BISADDITIONAL INFORMATION34
03/31/2023103678030Open ↗
03/19/2023103678030Open ↗
08/11/2021123807862Open ↗
Showing 3 of 34 on file for this type
▸BISBOROUGH INTAKE FORM17
12/18/2023100255019Open ↗
10/24/2023103678030Open ↗
10/05/2023103678030Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/31/2020140987127Open ↗
11/24/2020140973944Open ↗
Showing 2 of 4 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
07/18/2019123749300Open ↗
07/18/2019123749300Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWProof of Historic Building4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type