← Back
BuildNYC
Two stories - detached, small or mid-size
1050 SWINTON AVENUE
BRONX · BIN 2079614
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
944 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,925 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPhotovoltaic solar panel installationUnder Construction1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering111/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation Servicespecialty_contractor111/13/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272111/04/2026
Building Lifecycle
11/13/2026
Permit issued — Solar
X01484021-I1-SL
11/04/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01484021-I1
11/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
11/04/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
7 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSunrun Installation Service11/13/2026
1 project · most recent 11/04/2026
FiledStatusContractorScope
11/04/2026Permit IssuedSunrun Solar Electl—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/04/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
11/04/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
11/03/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
11/03/2026Energy Code Compliance InspectionsWalid Abdullaprogress
11/03/2026FinalWalid Abdullaprogress
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account